Title: To authorize the Director of Public Utilities to enter into a construction contract with Complete General Construction Company, for the Berliner Park Storm and Sanitary Improvements project; to authorize the transfer of funds within the Sanitary Sewer Build America Bond Fund, to authorize the expenditure of $1,253,130.00, and amend the 2011 Capital Improvement Budget. ($1,253,130.00)
Attachments: 1. CC15695_001_signed.tif, 2. Fiscal_Sub-Contractor WIF Berliner Park Storm Sewer 051611.pdf
Date Ver.Action ByActionResultAction DetailsMeeting Details
6/28/20111 MAYOR Signed  Action details Meeting details
6/28/20111 CITY CLERK Attest  Action details Meeting details
6/27/20111 Columbus City Council ApprovedPass Action details Meeting details
6/27/20111 COUNCIL PRESIDENT Signed  Action details Meeting details
6/20/20111 Columbus City Council Read for the First Time  Action details Meeting details
6/6/20111 Auditor Reviewer Reviewed and Approved  Action details Meeting details
6/6/20111 CITY AUDITOR Reviewed and Approved  Action details Meeting details
6/6/20111 Utilities Drafter Sent for Approval  Action details Meeting details
6/6/20111 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
6/6/20111 Utilities Drafter Sent to Clerk's Office for Council  Action details Meeting details
6/3/20111 Utilities Drafter Sent for Approval  Action details Meeting details
6/2/20111 Auditor Reviewer Reviewed and Disapproved  Action details Meeting details
6/1/20111 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
6/1/20111 Utilities Drafter Sent for Approval  Action details Meeting details
5/31/20111 EBOCO Reviewer Sent for Approval  Action details Meeting details
5/27/20111 Finance Reviewer Reviewed and Approved  Action details Meeting details
5/27/20111 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
5/27/20111 Utilities Drafter Sent for Approval  Action details Meeting details
5/26/20111 Finance Reviewer Reviewed and Approved  Action details Meeting details
5/25/20111 Utilities Reviewer Sent for Approval  Action details Meeting details
5/25/20111 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
5/25/20111 Utilities Drafter Sent for Approval  Action details Meeting details
5/24/20111 Utilities Reviewer Reviewed and Approved  Action details Meeting details
5/24/20111 Utilities Drafter Sent for Approval  Action details Meeting details
5/19/20111 Utilities Reviewer Reviewed and Approved  Action details Meeting details
5/18/20111 Utilities Reviewer Reviewed and Approved  Action details Meeting details
5/16/20111 Utilities Drafter Sent for Approval  Action details Meeting details
Explanation

1. BACKGROUND:

A. Need. This legislation authorizes the Director of Public Utilities to enter into a construction contract with Complete General Construction Company, in connection with the Berliner Park Storm and Sanitary Improvements. The purpose of this Project is to make improvements to sanitary and storm sewers in and adjacent to Berliner Park. Sanitary and storm services in the park is provided by the Old Dry Flow Sewer which is nearly abandoned due to its poor structural condition with the exception of the sewer segment in the Berliner Park. The Old Dry Flow sewer is tributary to the OSIS, and during periods of high flows, can back up causing water in basements (WIBs) and overflows from manholes. The initial concept of providing gravity sanitary sewer connections for the Berliner Park facilities was found to not be feasible during project design. The proposed connection to the OSIS would have been very low in relation to the flow line of the OSIS and would have subject the connection to high backwater conditions during rain events. Reuse of existing sanitary sewer lines within the park would have required relining based on TV inspection of the lines during design. Draft operational plans for the treatment plants indicate the OSIS will be operated under a surcharged condition during severe rain events. Other alternatives were investigated but found to be very costly to provide sanitary service for such a limited number of facilities. The recommended alternative was found to be the installation of a grinder pump at each facility and a small diameter force main to a central collection manhole near an existing OSIS manhole. The grinder pump package includes a check valve on the discharge line to prevent backup from the receiving sewer. As a further safe guard, a sluice gate will be provided on the gravity sewer line from the collection manhole to the OSIS main sewer which could be closed during severe rain events. Several hundred f...