header-left
File #: 1062-2011    Version: 1
Type: Ordinance Status: Passed
File created: 6/27/2011 In control: Public Service & Transportation Committee
On agenda: 7/11/2011 Final action: 7/13/2011
Title: To authorize the Director of Public Service to enter into a professional service engineering contract with Transystems Corporation for the Pedestrian Safety Improvements - Moler Road, Southgate Drive., Ferris Road, and Parsons Avenue Sidewalk project; to authorize and direct the City Auditor to appropriate and transfer $690,000.00 from the Special Income Tax Fund to the Streets and Highways G.O. Bonds Fund; to authorize the City Auditor to appropriate and to authorize the expenditure of $690,000.00 from the Streets and Highways G.O. Bonds Fund; and to declare an emergency. ($690,000.00)
Attachments: 1. 1062-2011 Proposal Recommendation Memo.pdf, 2. 1062-2011 Location Map 1 - Moler sidewalks.pdf, 3. 1062-2011 Location Map 2 - Southgate sidewalks.pdf, 4. 1062-2011 Location Map 3 - Ferris sidewalks.pdf, 5. 1062-2011 Location Map 4 - Parsons sidewalks.pdf
Date Ver.Action ByActionResultAction DetailsMeeting Details
7/13/20111 CITY CLERK Attest  Action details Meeting details
7/12/20111 MAYOR Signed  Action details Meeting details
7/11/20111 Columbus City Council ApprovedPass Action details Meeting details
7/11/20111 COUNCIL PRESIDENT Signed  Action details Meeting details
7/1/20111 Service Drafter Sent to Clerk's Office for Council  Action details Meeting details
6/30/20111 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
6/30/20111 Service Drafter Sent for Approval  Action details Meeting details
6/30/20111 Auditor Reviewer Reviewed and Approved  Action details Meeting details
6/30/20111 CITY AUDITOR Reviewed and Approved  Action details Meeting details
6/30/20111 Service Drafter Sent for Approval  Action details Meeting details
6/30/20111 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
6/29/20111 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
6/29/20111 Service Drafter Sent for Approval  Action details Meeting details
6/29/20111 EBOCO Reviewer Sent for Approval  Action details Meeting details
6/28/20111 Finance Reviewer Reviewed and Approved  Action details Meeting details
6/27/20111 Service Drafter Sent for Approval  Action details Meeting details
6/27/20111 Service Reviewer Reviewed and Approved  Action details Meeting details
6/27/20111 Service Drafter Sent for Approval  Action details Meeting details
6/27/20111 SERVICE DIRECTOR Reviewed and Approved  Action details Meeting details
6/27/20111 Finance Reviewer Reviewed and Approved  Action details Meeting details
Explanation
1. BACKGROUND
This legislation authorizes the Director of Public Service to enter into a professional services contract with Transystems Corporation for the Pedestrian Safety Improvements - Moler Road, Southgate Drive., Ferris Road, and Parsons Avenue Sidewalk project for $690,000.00.

There are four individual sidewalk projects to be designed as a part of this contract. These improvements are mostly within the right-of-way and are identified in the Operations SAFEWALKS plan. They are:

1. Moler Road from Lockbourne Road to Progress Avenue - Engineering and right-of-way plans will be produced for sidewalks on both sides of the street for a total of 1 mile.
2. Parsons Avenue from Obetz Road to Dering Avenue - Engineering and right-of-way plans will be produced for sidewalks on both sides of the street for a total of 3.6 miles.
3. Southgate Avenue from High Street to Parsons Avenue - Engineering plans will be produced for sidewalks on both sides of the street for a total of 1 mile.
4. Ferris Avenue from Karl Road to Minnie Avenue - Engineering plans will be produced for sidewalks on both sides of the street for a total of 0.7 miles.

6.3 miles of 5 foot wide sidewalk will be added or reconstructed in this project on the both sides of the four roads. 144 ADA ramps will be added or reconstructed in this project. There are 27 bus stops and transit routes within the limits of this project. Pedestrian generators and destinations impacting the prooposed project include residences, St. Francis Desales, St. Matthias, Buckey Middle School, Indian Mound Parks and Recreation Center, Scioto Trail Elemantary School, Southmoor Middle School, and Moler Elementary School.

The Department of Public Service, Office of Support Services solicited a Request for Proposal for the Pedestrian Safety Improvements - Moler Road, Southgate Drive, Ferris Road, and Parsons Avenue Sidewalk project. This project was formally advertised through the City'...

Click here for full text