File #: 3460-2018    Version: 1
Type: Ordinance Status: Passed
File created: 12/5/2018 In control: Recreation & Parks Committee
On agenda: 1/28/2019 Final action: 1/31/2019
Title: To authorize the Director of Recreation and Parks to modify the contract with Gutknecht Concrete Technologies for vertical crack repair and patching of concrete at the outdoor handball courts located in Westgate Park; to authorize the the transfer of $37,700.00 within the Recreation and Parks Voted Bond Fund; to amend the 2018 Capital Improvements Budget Ordinance 1010-2018; to authorize the expenditure of $37,700.00 from the Recreation and Parks Bond Fund; and to declare an emergency. ($37,000.00)
Attachments: 1. Westgate Handball Concrete Repair Modification
Explanation

This ordinance is to authorize the Director of the Recreation and Parks Department to modify the contract with Gutknecht Concrete Technologies for vertical crack repair and patching of concrete at the outdoor handball courts located in Westgate Park.

Background: The handball courts at Westgate Park are the only outdoor courts located in a public park in central Ohio and draw users from throughout the region. The courts were originally constructed in 1972, however they have started to show signs of degradation in recent years. CRPD staff worked with a structural engineer in 2016 to conduct a structural investigation and report. Some of the recommendations from the report were performed earlier this year when reinforcing steel was added to the structure. This project provided additional improvements by repairing cracks and patching the vertical surfaces of the concrete structure thereby extending its useable life.

This modification is for an expanded scope of work to which will include additional concrete patching repairs to the roof of the handball court structure. These areas were not included in the engineer’s original estimate, but were discovered while prepping the roof for a waterproof sealer.

Total cost for the project will not exceed $132,380.00

Principal Parties:
Gutknecht Concrete Technologies
2280 Citygate Drive
Char Fish, (614) 532-5410
CCN: 38-1691323
Contract Compliance Expiration Date: 01/02/2020

Emergency Justification: This legislation will need to be emergency in order to allow work to be performed during the moderate spring temperature and before heavily used summer season.

Benefits to the Public: This project will benefit the community by improving a recreational feature that has been in the community for 45 years. It will extend the service life of the handball courts, making them useable for years to come.