File #: 1597-2012    Version: 1
Type: Ordinance Status: Passed
File created: 7/9/2012 In control: Public Service & Transportation Committee
On agenda: 7/30/2012 Final action: 8/1/2012
Title: To authorize the Director of Public Service to enter into contract with Decker Construction Company to provide for the payment of the contract and construction administration and inspection services, in connection with the ADA Curb Ramp - Citywide Curb Ramps Package 1 project; to authorize the expenditure of up to $750,000.00 from the Streets and Highways G.O. Bonds Fund; and to declare an emergency. ($750,000.00)
Attachments: 1. 1597-2012 Bid Recommendation Memo
Explanation
1. BACKGROUND
This legislation authorizes the Director of Public Service to enter into a contract for the construction of the ADA Curb Ramp - Citywide Curb Ramps Package 1 project.

Work for project consists of building ADA curb ramps at various locations in Columbus and other such work as may be necessary to complete the contract in accordance with the plans and specifications set forth in the Bid Submittal Documents.

The estimated Notice to Proceed date is August 22, 2012. The project was let by the Office of Support Services through Vendor Services and Bid Express. 4 bids were received on July 3, 2012 (4 Majority) and tabulated on July 5, 2012 as follows:

Company Name Bid Amt City/State* Majority/MBE/FBE
Decker Construction Company $510,549.69 Columbus, OH Majority
Shelly and Sands, Inc. $562,474.55 Columbus, OH Majority
Columbus Asphalt Paving $567,261.20 Columbus, OH Majority
G&G Cement Contractors $768,343.40 Columbus, OH Majority

*City/State is from the Ohio Secretary of State web site, which may differ from the mailing address below.

The bid documents included SP-146 which states, "It is the City's intent to fully utilize the available funding provided to its Ramp Program within the approved Capital Improvements Budget. Therefore, the City reserves the right to increase or decrease the base contract amount, up to or down to a maximum of ($660,000.00). The total amount of the work and other incidentals will not exceed the total amount of the contract price (maximum of $660,000.00). The contract will be awarded to the lowest (determined by the base bid, not including additional funds to equal the maximum of $660,000.00), best, responsive, responsible bidder per Columbus City Code Section 329."
Award is to be made to ...