Legislation Details

File #: 2647-2026    Version: 1
Type: Ordinance Status: Second Reading
File created: 9/21/2026 In control: Public Utilities & Sustainability Committee
On agenda: 10/19/2026 Final action:
Title: To authorize the Director of the Department of Public Utilities to modify and increase the contract with Arcadis U.S. Inc. for the Jackson Pike Wastewater Treatment Plant (JPWTP) Power Systems Upgrade and Safety Improvements project; to make this ordinance contingent upon the Ohio Water Development Authority approving a loan for this project; to appropriate funds within the Water Pollution Control Loan Fund; to authorize an expenditure of up to $1,528,349.37 from the Water Pollution Control Loan Fund to pay for the project; and to declare an emergency. ($1,528,349.37)
Attachments: 1. ORD 2647-2026 Utilization Form, 2. ORD 2647-2026 SOS, 3. ORD 2647-2026 Accounting Template
Date Ver.Action ByActionResultAction DetailsMeeting Details
No records to display.
Explanation
1. BACKGROUND
This ordinance authorizes the Director of Columbus Water and Power to enter into a planned contract modification for professional engineering services with Arcadis U.S. Inc. for the JPWTP Power Systems Upgrade and Safety Improvements project, CIP #650257-100101, in an amount up to $1,528,349.37.

The original contract was for preliminary design services relating to arc flash hazards and coordination issues with electrical equipment at the Jackson Pike Wastewater Treatment Plant (JPWTP). That portion of the project evaluated electrical equipment that needs to be replaced or rehabilitated and provided recommendations for remediation.

The first modification was for detailed design services to provide detailed design documents for the construction portion of the project. The Step 2 services include bidding documents and assistance services.

This modification is the second of two planned modifications and will provide engineering services during construction, including submittal reviews, request for information responses and other technical field representation.

Community Planning Area: 99-Citywide

1.1 Amount of additional funds to be expended: $1,528,349.37
Original Contract Amount: $ 363,100.00 (ORD 2953-2021, PO308101)
Modification #1 : $ 716,000.00 (ORD 2934-2023, PO428391)
Modification #2 (current) $ 1,528,349.37
CONTRACT TOTAL : $ 2,607,449.00

1.2 Reason the need for additional goods or services could not be foreseen at the time the contract was initially awarded:
The contract was awarded with the intention of one design company performing all phases of the design work. The preliminary design services were completed by Arcadis in the original contract, with contract modifications planned to add funding for detailed design and for services during construction.

1.3. Reason other procurement processes are not used:
Ar...

Click here for full text