File #: 2207-2004    Version: 1
Type: Ordinance Status: Passed
File created: 12/1/2004 In control: Utilities Committee
On agenda: 2/14/2005 Final action: 2/16/2005
Title: To authorize the Director of Public Utilities to modify the contract with Hoffman Engineering Company, for Dublin Road Water Plant Miscellaneous Improvements, Auxiliary High Service Pump Station Electrical Renovation, for the Division of Water, and to authorize the expenditure of $7,820.00 from Waterworks Enlargement Voted 1991 Bonds Fund. ($7,820.00)
Attachments: 1. DRWP_VicMap.pdf, 2. HVAC Explanation.pdf
Date Ver.Action ByActionResultAction DetailsMeeting Details
2/16/20051 CITY CLERK Attest  Action details Meeting details
2/15/20051 MAYOR Signed  Action details Meeting details
2/14/20051 Columbus City Council ApprovedPass Action details Meeting details
2/14/20051 COUNCIL PRESIDENT Signed  Action details Meeting details
2/7/20051 Columbus City Council Read for the First Time  Action details Meeting details
1/25/20051 Utilities Drafter Sent to Clerk's Office for Council  Action details Meeting details
1/24/20051 Utilities Drafter Sent for Approval  Action details Meeting details
1/24/20051 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
1/21/20051 Auditor Reviewer Reviewed and Approved  Action details Meeting details
1/21/20051 CITY AUDITOR Reviewed and Approved  Action details Meeting details
1/20/20051 Utilities Drafter Sent for Approval  Action details Meeting details
1/19/20051 Finance Reviewer Reviewed and Approved  Action details Meeting details
1/19/20051 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
1/18/20051 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
1/18/20051 Utilities Drafter Sent for Approval  Action details Meeting details
1/3/20051 EBOCO Reviewer Reviewed and Approved  Action details Meeting details
12/27/20041 Utilities Drafter Sent for Approval  Action details Meeting details
12/21/20041 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
12/20/20041 Utilities Drafter Sent for Approval  Action details Meeting details
12/15/20041 UTILITIES DIRECTOR Reviewed and Disapproved  Action details Meeting details
12/14/20041 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
12/13/20041 Utilities Drafter Sent for Approval  Action details Meeting details
12/13/20041 Utilities Drafter Sent for Approval  Action details Meeting details
12/10/20041 Utilities Drafter Sent for Approval  Action details Meeting details
12/9/20041 Utilities Reviewer Reviewed and Approved  Action details Meeting details
12/1/20041 Utilities Drafter Sent for Approval  Action details Meeting details
Explanation
BACKGROUND:  The original contract provided for the design and preparation of contract documents for electrical renovation of the Dublin Road Water Plant Auxiliary High Service Pump Station.  This modification provides for additions and changes to the scope of work due to field conditions encountered during construction.  These include a cone valve control circuit renewal, pump motor leads, dresser couplings, ventilation system rehabilitation, heating system rehabilitation, heating system circulation fan, and SCADA and pump control logic modifications.
In bringing the building systems back online with the new electrical system, it was discovered that the existing ventilation system on the roof was inoperative and not in accordance with current code. The lower level louvers were without automatic operators so that the roof mounted exhaust fans would draw against a closed room unless the lower louvers were left open all the time. A new design and change order was prepared by the consultant, along with inspection, documentation, testing, and training.
While performing high elevation work during the winter, the contractor observed that the furnace heated air was stagnating at ceiling level. The conduits at upper heights were running hot, while the equipment at floor level was quite cold. An air circulating fan, appropriate to bring the hot air pooling at the ceiling down to floor level, and compatible with maintaining freedom of overhead crane movement, was designed and a change order prepared by the consultant, along with inspection, documentation, testing, and training.
 
 
CC  329.13 CONTRACT MODIFICATIONS:
1.      Amount of additional funds to be expended under this modification: $7,820.00.
2.      The extent of additional services could not be initially foreseen due to field conditions discovered during construction.
3.      The work under this contract modification is a continuation of work previously performed by the Consultant, therefore, no other processes were used for procurement of these services.
4.      The cost of this modification is based on material and labor, and was negotiated between the Consultant and the City, as documented by the Consultant's quotation letters, and verified by the Project Engineer.
 
CONTRACT AMOUNT:
Original contract amount                                  $43,900.00
Modification to Date                           $27,200.00
This modification                          $7,820.00
New contract amount                        $78,920.00
 
FISCAL IMPACT:  The last authorization for expenditures for this project occurred July 22, 2003 for Modification No. 1 in the amount of $27,200.00.  
 
CONTRACT COMPLIANCE NUMBER:      31-0910570
 
 
 
Title
 
To authorize the Director of Public Utilities to modify the contract with Hoffman Engineering Company, for Dublin Road Water Plant Miscellaneous Improvements, Auxiliary High Service Pump Station Electrical Renovation, for the Division of Water, and to authorize the expenditure of $7,820.00 from Waterworks Enlargement Voted 1991 Bonds Fund. ($7,820.00)   
 
 
 
 
Body
 
WHEREAS: Contract No. EL900718 was authorized by Ordinance No. 1818-99,  passed July 19, 1999, was executed December 14, 1999 and approved by the City Attorney on December 29, 1999, and
 
WHEREAS:  The original contract provided for the design and preparation of contract documents for electrical renovation of the Dublin Road Water Plant Auxiliary High Service Pump Station, and
 
WHEREAS:  It is necessary to provide for additions and changes to the scope of work due to field conditions encountered during construction, and
 
WHEREAS: It is necessary to modify Contract No. EL900718 to provide for Dublin Road Water Plant Miscellaneous Improvements, Auxiliary High Service Pump Station Electrical Renovation, and    
 
WHEREAS: This modification provides for an increase of $7,820.00 to this contract, and
 
WHEREAS: It is necessary to authorize the Director of Public Utilities to modify Contract No. EL900718, for Dublin Road Water Plant Miscellaneous Improvements, Auxiliary High Service Pump Station Electrical Renovation, for the preservation of public health, peace, property and safety now, therefore,
 
BE IT ORDAINED BY THE COUNCIL OF THE CITY OF COLUMBUS
 
Section 1.  The Director of Public Utilities be and is hereby authorized to modify Contract No. EL900718 with Hoffman Engineering Company in the amount of $7,820.00, for Dublin Road Water Plant Miscellaneous Improvements, Auxiliary High Service Pump Station Electrical Renovation, for the Division of Water, Department of Public Utilities, Contract No. 979, terms and conditions of which are on file in the office of the Division of Water.
 
Section 2.  That for the purpose of paying the cost thereof, the expenditure of $7,820.00 is hereby authorized from the Waterworks Enlargement Voted 1991 Bonds Fund, Fund 606, Department of Public Utilities, Division of Water, Dept./Division No. 60-09, Object Level Three 6682, Project No. 690278, OCA Code 642900.
 
Section 3.  The City Auditor is hereby authorized to transfer the unencumbered balance in a project account to the unallocated balance account within the same fund upon receipt of certification by the Director of the Department administering said project; that the project has been completed and the monies are no longer required for said project except that no transfer shall be made from a project account funded by monies from more than one source.
 
Section 4.  That this ordinance shall take effect and be in force from and after the earliest period allowed by law.