File #: 0504-2025    Version: 1
Type: Ordinance Status: Passed
File created: 2/19/2025 In control: Public Utilities & Sustainability Committee
On agenda: 3/31/2025 Final action: 4/3/2025
Title: To authorize the Director of the Department of Public Utilities to enter into a construction services contract modification with D & M Painting Corp. for the Rome-Hilliard West Tank Painting Improvements project; to authorize an amendment to the 2024 Capital Improvement Budget; to authorize the transfer of cash and appropriation between projects within the Water Bond Fund; and to authorize the expenditure of $28,501.81 for the project. ($28,501.81)
Attachments: 1. ORD 0504-2025 CT2447 Vicinity Map, 2. ORD 0504-2025 Accounting Template, 3. ORD 0504-2025 Utilization Plan

Explanation

1.  BACKGROUND

This ordinance authorizes the Director of Public Utilities to enter into a construction services modification contract with D & M Painting Corp. for the Rome-Hilliard West Tank Painting Improvements project, C.I.P. Number 690477-100020, in an amount up to $28,501.81.

 

The work consists of abrasive blasting and recoating of the entire exterior, interior wet ceiling and spot repairs of the interior dry areas of a 2-million-gallon capacity fluted column steel elevated water storage tank, and other such work as may be necessary to complete the contract, in accordance with the technical specifications, and City of Columbus Construction and Material Specifications as set forth in the Invitation For Bid (IFB).

                     

Modification No. 1 is for the additional costs in the project that exceeded the contingency due to lead paint being discovered on the exterior and interior dry.  The contractor also filed a claim for differing site conditions involving the material of coating in the interior wet.  The coating was presented to be more difficult to remove through abrasive blasting than typical coatings for this application.  Removal of this coating required additional time and material not included in the original bid.

 

The Community Planning Area is 36 - Far West.

 

UPDATED TIMELINE:  No additional time will be added to the contract.  All work shall still be completed within 180 calendar days of the date the Notice to Proceed was issued.

 

1.1 Amount of additional funds to be expended:  $28,501.81

Original Contract (PO445365; ORD 0676-2024)                                          $ 1,732,758.50                                          

Modification No. 1 (PO TBD; ORD 0504-2025)                                          $     28,501.81

CONTRACT TOTAL                                                                                                              $ 1,761,260.31

 

1.2. Reason other procurement processes are not used: 

This contract was awarded through the City’s IFB process.  Unexpected work conditions (the discovery that lead paint was previously used on the job) changed the cost of the job.  Another procurement process is not needed.

 

1.3. How cost of modification was determined:

Proposed pricing was based upon current contract job titles, rates of pay, and allowable expenses.  Negotiations between the vendor and the Public Utilities project management team resulted in the price to perform the extra work.

 

2.  ECONOMIC IMPACT/ADVANTAGES; COMMUNITY OUTREACH; PROJECT DEVELOPMENT; ENVIRONMENTAL FACTORS/ADVANTAGES OF PROJECT

There are currently 38 water tanks in the distribution system and 26 of them are maintained by the City of Columbus, Division of Water.  To keep these tanks in optimal condition, each year tank interiors or exteriors are identified to be recoated. 

 

This project provides painting improvements for the maintenance of a steel elevated water storage tank. These improvements will keep this tank in optimal condition and prolong its service life.  Regular maintenance inspections have determined that the Rome-Hilliard West tank exterior needs to be blasted and recoated at this time. The interior wet ceiling and spots of the interior dry area coating systems also need to be blasted and recoated.  The project will include various safety improvements such as fall protection tie-off lugs on roof and a rooftop handrail opening safety gate. Special consideration towards environmentally friendly operations will be implemented, one of which is the recycling of the Garnet abrasive blast media, which results in significantly reducing the volume of waste sent to the landfill.

 

3.  CONTRACT COMPLIANCE INFORMATION

D & M Painting Corp.’s contract compliance number is CC001949 and expired on 2/5/26.  D & M Painting Corp. will need to renew their contract compliance number prior to the finalization of the modification contract.  Searches in the Excluded Party List System (Federal) and the Findings for Recovery list (State) produced no findings against D & M Painting Corp.

 

4.  MINORITY AND WOMAN OWNED BUSINESS ENTERPRISE & SMALL LOCAL BUSINESS ENTERPRISE PROGRAM

This contract opportunity was submitted to the City’s Office of Diversity and Inclusion (ODI) for review and assignment of an MBE/WBE goal prior to bidding.  ODI determined there was not an opportunity for MBE/WBE participation in this contract and did not assign a goal.  This contract was not bid with a City of Columbus MBE/WBE Program goal and the requirements of the City’s MBE/WBE Program are not applicable to this contract.

D & M Painting Corp. does not have any subcontractors performing contract work on this project.  The projected MBE/WBE percentage is 0.0%.

 

5.  PRE-QUALIFICATION STATUS

D & M Painting Corp. has met code requirements with respect to pre-qualification, pursuant to relevant sections of Columbus City Code Chapter 329.

 

6.  FISCAL IMPACT

Funding in the amount of $28,501.81 is available and appropriated within the Water Bond Fund, Fund 6006.  An amendment to the 2024 Capital Improvement Budget is needed to align budget authority with the proper project.  A transfer of cash and appropriation between projects within the Water Bond Fund is needed to align cash and appropriation with the proper project.

 

Title

To authorize the Director of the Department of Public Utilities to enter into a construction services contract modification with D & M Painting Corp. for the Rome-Hilliard West Tank Painting Improvements project; to authorize an amendment to the 2024 Capital Improvement Budget; to authorize the transfer of cash and appropriation between projects within the Water Bond Fund; and to authorize the expenditure of $28,501.81 for the project.  ($28,501.81)

 

Body

WHEREAS, the Department of Public Utilities is engaged in the Rome-Hilliard West Tank Painting Improvements project; and

 

WHEREAS, Contract No. PO445365; was authorized by Ordinance No. 0676-2024, for the Rome-Hilliard West Tank Painting Improvements project; and

 

WHEREAS, the discovery that lead paint was used to previously paint a portion of the water tank has resulted in higher than anticipated costs to repaint the water tower; and

 

WHEREAS, it is necessary to authorize the Director of the Department of Public Utilities to enter into a construction services modification contract with D & M Painting Corp. for the Rome-Hilliard West Tank Painting Improvements project; and

 

WHEREAS, the 2024 Capital Improvements Budget must be modified to align budget authority with the proper project; and

 

WHEREAS, it is necessary to transfer cash and appropriation between projects within the Water Bond Fund, Fund 6006, to align cash and appropriation with the proper project; and

 

WHEREAS, it is necessary to expend funds to pay for this modification; NOW, THEREFORE,

 

BE IT ORDAINED BY THE COUNCIL OF THE CITY OF COLUMBUS:

 

SECTION 1.  That the 2024 Capital Improvements Budget authorized by Ordinance 1907-2024 be amended as follows to establish sufficient budget authority for this project:

 

Fund / Project Number / Project Name (Funding Source) / Current Authority / Revised Authority / Change

6006 / P690473-100024 / 2082 Fairwood Avenue Soil Remediation and Site Improvements (Voted Water Carryover) / $223,000.00 / $194,498.00 / ($28,502.00)

 

6006 / P690477-100020 / Rome-Hilliard West Tank Painting Improvements (Voted Water Carryover) / $2,131,478.00 / $2,159,980.00 / $28,502.00

 

SECTION 2.  That the transfer of $28,501.81, or so much thereof as may be needed, is hereby authorized within the Water Bond Fund, Fund 6006, per the account codes in the attachment to this ordinance.

 

SECTION 3.  That the Director of Public Utilities is hereby authorized to enter into a construction services modification contract for the Rome-Hilliard West Tank Painting Improvements project with D & M Painting Corp., 1500 Amity Ridge Road, Washington, PA 15301, in an amount up to $28,501.81, in accordance with the terms and conditions of the contract on file in the Department of Public Utilities.

 

SECTION 4.  That the expenditure of up to $28,501.81, or so much thereof as may be needed, is hereby authorized from the Water Bond Fund, Fund 6006, per the accounting codes in the attachment to this ordinance.

 

SECTION 5.  That funds are hereby deemed appropriated and expenditures and transfers authorized to carry out the purposes of this ordinance and the City Auditor shall establish such accounting codes as necessary.

 

SECTION 6.  That the City Auditor is authorized to make any accounting changes to revise the funding source for all contracts or contract modifications associated with this ordinance.

 

SECTION 7.  That the City Auditor is hereby authorized to transfer the unencumbered balance in a project account to the unallocated balance account within the same fund upon receipt of certification by the Director of the Department administering said project that the project has been completed and the monies are no longer required for said project.

 

SECTION 8.  That this ordinance shall take effect and be in force from and after the earliest period allowed by law.