File #: 0432-2025    Version: 1
Type: Ordinance Status: Passed
File created: 2/7/2025 In control: Public Utilities & Sustainability Committee
On agenda: 3/24/2025 Final action: 3/27/2025
Title: To authorize the Director of the Department of Public Utilities to enter into a professional services contract with AECOM Technical Services, Inc. for the Beechwood Road Area Water Line Improvements project; to authorize an amendment to the 2024 Capital Improvement Budget; to appropriate funds within the Water - Fresh Water Market Rate Fund; to make this ordinance contingent upon the Ohio Water Development Authority approving a loan for this project; and to authorize the expenditure of $433,492.64 from the Water - Fresh Water Market Rate Fund. ($433,492.64)
Indexes: MBE Participation, WBE Participation
Attachments: 1. ORD 0432-2025 C-2388 Vicinity Map (Beechwood), 2. ORD 0432-2025 Accounting Template.pdf, 3. 0432-2025 Utilization.pdf

Explanation   

1.  BACKGROUND

This ordinance authorizes the Director of Public Utilities to enter into a professional services contract with AECOM Technical Services, Inc. for the Beechwood Road Area Water Line Improvements, CIP 690236-100165, Contract 2388, in an amount up to $433,492.64.

 

The purpose of this project is to construct necessary improvements to the water distribution system in the Beechwood Road Area.  The improvements identified in the scope of work will replace or rehabilitate water lines that have high break histories and require frequent maintenance.  This project includes replacing or rehabilitating approximately 12,070 linear feet of 6-inch and 8-inch water lines. The streets include Beechwood Road, East Fulton Street, Ashton Road, Ashton Court, Astor Avenue, Colby Avenue, East Livingston Avenue, South Waverly Street, South Weyant Avenue, Byron Avenue, Browning Avenue, First and Second Alley North of East Mound Street, Brookside Drive, Dale Avenue, Eastmoor Boulevard, and South Kellner Road.

 

This project is located within the following Community Planning Areas:  Mid East (57)

 

TIMELINE: The duration of the design phase for this project is 14 months or until the scope of services is completed to the satisfaction of the City. 

 

ESTIMATED COST OF PROJECT:  The bid amount and proposed award amount is $433,492.64, including a 15% design contingency amount that will be utilized to fund needed and approved changes in the work.  No contract modifications are anticipated at this time; however, design exigency might later compel modification of this contract, if unforeseen difficulties are encountered.

 

Cost summary:

 

Original Contract                                                                                         $                           433,492.64

Future Anticipated Needs                                                                    $                          0.00

CONTRACT TOTAL                                                                   $                            433,492.64

 

2.  ECONOMIC IMPACT/ADVANTAGES; COMMUNITY OUTREACH; PROJECT DEVELOPMENT; ENVIRONMENTAL FACTORS/ADVANTAGES OF PROJECT

The goal of this project is to replace or rehabilitate the existing water lines that have a high break frequency.  Replacement of these water lines will improve water service, decrease burden on water maintenance operations, and reduce water loss.  The Neighborhood Liaison(s) will be contacted and informed of this project during the design phase.  Further community outreach may result through the Neighborhood Liaison Program.

 

3.  BID INFORMATION

This project was formally advertised on the Vendor Services and Bonfire websites from October 4, 2024 through November 1, 2024.  Six proposals were received:

 

 Name                     C.C. No.       Exp. Date                     City/State                     Status                     

HDR Engineering                          CC008851        3/11/26                     Columbus, OH                        MAJ

AECOM Technical Svcs, Inc.        CC010897        5/28/26                     Columbus, OH                      MAJ

Stantec Consulting Svcs, Inc.                          CC000462        7/26/25                     Columbus, OH                                    MAJ

VS Engineering, Inc.                      CC031373        11/7/26                    Columbus, OH                                     MBE

GHD                                                                                        CC031197         8/21/26                    Columbus, OH                                       MAJ

Osborn Engineering, Inc.                                    CC006417        10/12/25                   Columbus, OH                     MAJ

 

All proposals were deemed responsive.  The evaluation committee reviewed the proposals and recommended the contract for the Beechwood Road Area Water Line Improvements project be awarded to AECOM Technical Services, Inc.

 

AECOM Technical Services, Inc.’s certification was in good standing at the time of the bid award.

 

4.  CONTRACT COMPLIANCE INFORMATION

AECOM Technical Services, Inc.’s contract compliance number is CC010897 and expires 5/28/26. 

 

5.  MINORITY AND WOMAN OWNED BUSINESS ENTERPRISE & SMALL LOCAL BUSINESS ENTERPRISE PROGRAM

This contract was advertised with an anticipated City of Columbus MBE/WBE Program goal of 10% as assigned by the City’s Office of Diversity and Inclusion (ODI).  After ODI’s review of the Utilization Plan and other related information the contractor submitted with their bid response, ODI has approved an MBE/WBE Program goal of 10% for this contract. 

 

As part of their proposal, AECOM Technical Services, Inc. has proposed the following subcontractors to perform contract work:

 

Company Name                                         City/State                                     ODI Certification Status

Dynotec, Inc.                                                                                Columbus, Ohio                                              MBE  

Coldwater Consulting, LLC                                          Columbus, Ohio                                                                                    WBE                            

                                                                                                                                                                            

The certification of AECOM Technical Services, Inc. and the above companies was in good standing at the time the bid was awarded.

 

6.  FISCAL IMPACT

Funding for this contract will be obtained through the Ohio Water Development Authority Direct Loan Program.  City Council authorized this loan application and acceptance of loan funding via Ordinance 0652-2024, passed by Council on 3/25/24.  This loan is expected to be approved at the March Board meeting.  This ordinance is contingent upon the OWDA Board approving the loan application.

 

The Ohio Water Development Authority (OWDA) Direct Loan Program is a reimbursement program.  Purchase orders will need to be established to AECOM Technical Services, Inc.  for this contract.  Public Utilities will need to pay invoices directly to AECOM Technical Services, Inc.  and then submit reimbursement requests based upon these paid invoices to OWDA for OWDA to reimburse Public Utilities.  

The 2024 Capital Improvement Budget will need to be amended to align budget authority with the proper project.  Funds will need to be appropriated in the Water - Fresh Water Market Rate Fund, Fund 6014.

 

Title

To authorize the Director of the Department of Public Utilities to enter into a professional services contract with AECOM Technical Services, Inc. for the Beechwood Road Area Water Line Improvements project; to authorize an amendment to the 2024 Capital Improvement Budget; to appropriate funds within the Water - Fresh Water Market Rate Fund; to make this ordinance contingent upon the Ohio Water Development Authority approving a loan for this project; and to authorize the expenditure of $433,492.64 from the Water - Fresh Water Market Rate Fund.  ($433,492.64)

 

Body

WHEREAS, the Department of Public Utilities is engaged in the Beechwood Road Area Water Line Improvements project; and

 

WHEREAS, six proposals for the Beechwood Road Area Water Line Improvements project were received and opened on November 1, 2024; and

 

WHEREAS, the evaluation committee recommended AECOM Technical Services, Inc. be awarded the contract for this project; and

 

WHEREAS, Ordinance 0652-2024 authorized this contract to be funded by a loan to be obtained through the Ohio Water Development Authority Direct Loan Program; and

 

WHEREAS, this ordinance is contingent upon that loan being approved; and

 

WHEREAS, it is necessary to amend the 2024 Capital Improvement Budget to align budget authority for the project; and

 

WHEREAS, it is necessary to appropriate funds in the Water - Fresh Water Market Rate Fund, Fund 6014; and

 

WHEREAS, it is necessary to authorize the Director of the Department of Public Utilities to enter into a professional services contract with AECOM Technical Services, Inc. for the Beechwood Road Area Water Line Improvements project; and

 

WHEREAS, it is necessary to expend funds to pay for the services AECOM Technical Services, Inc. provides under this contract; NOW, THEREFORE, 

 

BE IT ORDAINED BY THE COUNCIL OF THE CITY OF COLUMBUS:

 

SECTION 1.  That the 2024 Capital Improvements Budget authorized by Ordinance 1907-2024 be amended as follows to establish sufficient budget authority for this project:

 

Fund / Project Number / Project Name (Funding Source) / Current Authority / Revised Authority / Change

6014 / P690236-100165 / Beechwood Road Area Water Line Improvements (OWDA Direct Loan) / $300,000.00 / $733,493.00 / $433,493.00 (To match loan amount)

 

SECTION 2.  That the appropriation of $433,492.64, or so much thereof as may be needed, is hereby authorized in the Water - Fresh Water Market Rate Fund, Fund 6014, per the accounting codes in the attachment to this ordinance.

 

SECTION 3.  That the Director of the Department of Public Utilities be and hereby is authorized to enter into a contract for professional engineering services for the Beechwood Road Area Water Line Improvements project, CIP No. 690236-100165, with AECOM Technical Services, Inc., 277 West Nationwide Boulevard, Columbus, Ohio 43215, in accordance with the terms and conditions of the contract on file in the Department of Public Utilities.

 

SECTION 4.  That the expenditure of $433,492.64, or so much thereof as may be needed, is hereby authorized to pay for this contract per the accounting codes in the attachment to this ordinance.

 

SECTION 5.  This ordinance is contingent upon the Ohio Water Development Authority's Board approving the loan for this project.

 

SECTION 6.  That funds are hereby deemed appropriated and expenditures and transfers authorized to carry out the purposes of this ordinance and the City Auditor shall establish such accounting codes as necessary.

SECTION 7.  That the City Auditor is authorized to make any accounting changes to revise the funding source for all contracts or contract modifications associated with this ordinance.

 

SECTION 8.  That the City Auditor is authorized to transfer the unencumbered balance in a project account to the unallocated balance account within the same fund upon receipt of certification by the Director of the Department administering said project that the project has been completed and the monies are no longer required for said project.

SECTION 9.  That this ordinance shall take effect and be in force from and after the earliest period allowed by law.