header-left
File #: 2273-2015    Version: 1
Type: Ordinance Status: Passed
File created: 9/8/2015 In control: Public Utilities Committee
On agenda: 10/26/2015 Final action: 10/29/2015
Title: To authorize the Director of Public Utilities to enter into an agreement with Korda/Nemeth Engineering, Inc. for professional engineering services for the Noe-Bixby Road Area Water Line Improvements Project for the Division of Water; to authorize a transfer and expenditure up to $270,535.33 within the Water Works Enlargement Voted Bonds Fund; and to amend the 2015 Capital Improvements Budget. ($270,535.33)
Attachments: 1. ORD 2273-2015 Information, 2. ORD 2273-2015 Sub ID, 3. ORD 2273-2015 map

Explanation

 

1.  BACKGROUND:  This legislation authorizes the Director of Public Utilities to enter into an agreement with Korda/Nemeth Engineering, Inc., for professional engineering services for the Noe-Bixby Road Area Water Line Improvements Project, in an amount up to $270,535.33, for Division of Water Contract No. 2053.

 

The purpose of this project is to construct necessary improvements to the water distribution system in the Noe-Bixby Road Area.  The improvements identified in the scope of work will replace or rehabilitate water lines that have high break histories and require frequent maintenance.  This project includes replacing or rehabilitating approximately 18,765 linear feet of 6-inch, 8-inch and 12-inch water lines within the project area.

 

The work is located in the Eastmoor/Walnut Ridge planning area (20).  The streets/roads include: Noe-Bixby Road, Barberry Hollow, Barberry Lane, Cherry Hill Lane, China Berry Drive, Plum Ridge, Beatrice Drive, Benson Drive, Calvin Drive, Dickens Drive, Lancelot Road, Lillian Lane, Little John Drive, McAllister Avenue, Robinhood Park, and Scarlet Street. These streets are mostly located in the residential area north of I-70, south of Broad Street and just west of I-270.

 

2. ECONOMIC IMPACT/ADVANTAGES; COMMUNITY OUTREACH; PROJECT DEVELOPMENT; ENVIRONMENTAL FACTORS/ADVANTAGES OF PROJECT:  The goal of this project is to replace or rehabilitate the existing 6-inch and 8-inch water lines that have a high break frequency.  Replacement of these water lines will decrease burden on water maintenance operations.  The new lines constructed under this project should eliminate the pattern of frequent water line breaks and reduce water loss.  The Neighborhood Liaison(s) will be contacted and informed of this project during the design phase.  Further community outreach may result through the Neighborhood Liaison Program.

 

3. BID INFORMATION:  The selection of the firm providing the professional engineering services has been performed in accordance with the procedures set forth in Columbus City Code, Section 329, "Awarding professional service contracts through requests for proposals."  The evaluation criteria for this contract included:  1. proposal quality and feasibility, 2. past performance, 3. environmentally preferable offeror, and 4. local workforce.

 

Requests for Proposals (RFP's) were received on June 5, 2015 from Korda/Nemeth Engineering, ms consultants, and American Structurepoint.

 

An evaluation committee reviewed the proposals and scored them based on the criteria mentioned above.  The Department of Public Utilities recommends that the contract be awarded to Korda/Nemeth Engineering, Inc.

 

The Contract Compliance Number for Korda/Nemeth Engineering, inc. is 31-0922991 (expires 3/13/17, MAJ).  Additional information regarding all bidders, description of work, contract time frame and detailed amounts can be found on the attached Information form.

Searches in the Excluded Party List System (Federal) and the Findings for Recovery list (State) produced no findings against Korda/Nemeth Engineering, Inc.

 

4. FISCAL IMPACT: A transfer of funds within the Water Works Enlargement Voted Bonds Fund will be necessary as well as an amendment to the 2015 Capital Improvements Budget.

 

 

Title

 

To authorize the Director of Public Utilities to enter into an agreement with Korda/Nemeth Engineering, Inc. for professional engineering services for the Noe-Bixby Road Area Water Line Improvements Project for the Division of Water; to authorize a transfer and expenditure up to $270,535.33 within the Water Works Enlargement Voted Bonds Fund; and to amend the 2015 Capital Improvements Budget.  ($270,535.33)

 

Body

 

WHEREAS, three technical proposals for professional engineering services for the Noe-Bixby Road Area Water Line Improvements Project were received on June 5, 2015; and

 

WHEREAS, the Department of Public Utilities recommends that the agreement be awarded to Korda/Nemeth Engineering, Inc.; and

 

WHEREAS, it is necessary for this Council to authorize the transfer and expenditure of funds within the Water Works Enlargement Voted Bonds Fund, for the Division of Water; and 

 

WHEREAS, it is necessary to authorize an amendment to the 2015 Capital Improvements Budget for the purpose of providing sufficient spending authority for the aforementioned project expenditure; and

 

WHEREAS, it has become necessary in the usual daily operation of the Division of Water, Department of Public Utilities, to authorize the Director of Public Utilities to enter into a professional engineering services agreement for the Noe-Bixby Road Area Water Line Improvements Project; for the preservation of the public health, peace, property and safety; now, therefore

 

BE IT ORDAINED BY THE COUNCIL OF THE CITY OF COLUMBUS:

 

SECTION 1.  That the Director of Public Utilities be and hereby is authorized to enter into a professional engineering services agreement for the Noe-Bixby Road Area Water Line Improvements Project with Korda/Nemeth Engineering, Inc., 1650 Watermark Drive, Columbus, Ohio 43215; for an expenditure up to $270,535.33; in accordance with the terms and conditions of the contract on file in the Office of the Division of Water.

 

SECTION 2.  That the City Auditor is hereby authorized to transfer $20,535.33 within the Department of Public Utilities, Division of Water, Dept/Div. No. 60-09, Water Works Enlargement Voted Bonds Fund, Fund No. 606, Object Level Three 6677, as follows:

Fund No. | Project No. | Project Name | OCA Code | Change

606 | 690501-100000 (carryover) | Hague Ave. Area WL Imp’s | 665010 | -$20,052.47

606 | 690331-100000 (carryover) | HCWP Lagoons Sludge Rmvl. | 606331 | -$481.05

606 | 690236-100045 (carryover) | Johnstown Rd. WL Imp’s | 663145 | -$1.81

606 | 690236-100078 (carryover) | Noe-Bixby Rd. Area WL Imp’s | 663678 | +$20,535.33

 

*There is already $250,000 cash in Fund 606, Project No. 690236-100078 (New Funding), Noe-Bixby Road Area Water Line Improvements.

 

SECTION 3.  That the 2015 Capital Improvements Budget is hereby amended as follows:

 

Fund No. | Project No. | Project Name | OCA Code | Change

606 | 690501-100000 (carryover) | Hague Ave. Area WL Imp’s | $1,340,053 | $1,320,000 | -$20,053

606 | 690331-100000 (carryover) | HCWP Lagoons Sludge Rmvl. | $482 | $0 | -$482

606 | 690236-100045 (carryover) | Johnstown Rd. WL Imp’s | $1 | $320,320 | +$320,319

(establish authority to match cash + rounding)

606 | 690236-100045 (carryover) | Johnstown Rd. WL Imp’s | $320,320 | $320,318 | -$2

606 | 690236-100078 (carryover) | Noe-Bixby Rd. Area WL Imp’s | $0 | $20,537 | +$20,537

 

SECTION 4.  That an expenditure up to $270,535.33 is hereby authorized for the Noe-Bixby Road Area Water Line Improvements Project within Dept/Div. 60-09, Water Works Enlargement Voted Bonds Fund, Fund No. 606, Project No. 690236-100078, OCA 663678, Object Level Three 6677, as follows:

 

New Funding:                     $250,000.00

Carryover: $20,535.33

 

SECTION 5.  That the funds necessary to carry out the purpose of this Ordinance are hereby deemed appropriated, and the City Auditor shall establish such accounting codes as necessary.

 

SECTION 6.  That the City Auditor is hereby authorized and directed to transfer any unencumbered balance in the project account to the unallocated balance within the same fund upon receipt of certification by the Director of the Department administering said project that the project has been completed and the monies no longer required for said project; except that no transfer shall be made from a project account by monies from more than one source.

 

SECTION 7.  That the City Auditor is authorized to establish proper project accounting numbers as appropriate.

 

SECTION 8.  That the City Auditor is authorized to make any accounting changes to revise the funding source for all contracts or contract modifications associated with this Ordinance.

 

SECTION 9.  That this Ordinance shall take effect and be in force from and after the earliest period allowed by law.