header-left
File #: 1969-2006    Version: 1
Type: Ordinance Status: Passed
File created: 10/27/2006 In control: Utilities Committee
On agenda: 11/20/2006 Final action: 11/22/2006
Title: To authorize the Director of Public Utilities to enter into a contract with Sauer Incorporated for the Hap Cremean Water Plant, Asbestos Hazard Abatement & Heating System Replacement, for the Division of Power and Water (pka the Division of Water), to authorize the expenditure of $3,711,750.00 from the Waterworks Enlargement Voted 1991 Bonds Fund, and to authorize the City Auditor to transfer funds within the Waterworks Enlargement Voted 1991 Bonds Fund, and to declare an emergency. ($3,711,750.00)
Attachments: 1. HCWP_VicMap.pdf, 2. Information to be included in Contracting Legislation 06-HCWP Asbestos - Boiler.pdf, 3. HCWPAsbestosBoilerBidTab.pdf, 4. HCWP Asbestos-Boiler Bid Evaluation Template-enlarged.pdf, 5. Final - HAP Cremean Advertisement - Sep 18 2006.pdf
Date Ver.Action ByActionResultAction DetailsMeeting Details
11/22/20061 CITY CLERK Attest  Action details Meeting details
11/21/20061 MAYOR Signed  Action details Meeting details
11/20/20061 Columbus City Council ApprovedPass Action details Meeting details
11/20/20061 COUNCIL PRESIDENT Signed  Action details Meeting details
11/6/20061 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
11/6/20061 Utilities Drafter Sent for Approval  Action details Meeting details
11/6/20061 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
11/6/20061 Utilities Drafter Sent to Clerk's Office for Council  Action details Meeting details
11/3/20061 EBOCO Reviewer Reviewed and Approved  Action details Meeting details
11/2/20061 Finance Reviewer Reviewed and Approved  Action details Meeting details
11/2/20061 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
11/2/20061 Utilities Drafter Sent for Approval  Action details Meeting details
11/2/20061 Auditor Reviewer Reviewed and Approved  Action details Meeting details
11/2/20061 CITY AUDITOR Reviewed and Approved  Action details Meeting details
11/2/20061 Utilities Drafter Sent for Approval  Action details Meeting details
11/1/20061 Utilities Drafter Sent for Approval  Action details Meeting details
11/1/20061 Finance Reviewer Reviewed and Approved  Action details Meeting details
10/31/20061 Utilities Reviewer Sent for Approval  Action details Meeting details
10/31/20061 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
10/27/20061 Utilities Drafter Sent for Approval  Action details Meeting details
10/27/20061 Utilities Drafter Sent for Approval  Action details Meeting details
10/27/20061 Utilities Drafter Sent for Approval  Action details Meeting details
Explanation
 
BACKGROUND:  The Hap Cremean Water Plant (HCWP) was originally constructed in the 1950's with a significant addition constructed in the 1970's. A recently completed asbestos survey identified asbestos containing materials at the facility. This project will accomplish the removal of asbestos from miscellaneous buildings and the replacement of the heating system for the main treatment building at the plant.  The insulation on the steam piping lines of the heating system are asbestos containing materials.
 
The procurement of this contract was conducted in accordance with Section 329.09.
 
Competitive bids were received and opened at the office of the Director of Public Utilities on October 25, 2006.  Of the three (3) bids received, the lowest responsive and responsible and best bidder was Sauer Incorporated.  The proposal submitted by the apparent low bidder, General Temperature Control is considered non-responsive due to failure to include a completed proposal bond, as required by Section 102.08 of the CMSC and as amended by SP-24 of the bid documents.
 
      BIDDER                                    AMOUNT
 
      General Temperature Control                  $3,675,000.00
Sauer Incorporated                        $3,711,750.00
Bruner Corporation                        $3,763,200.00
 
 
EMERGENCY:  Emergency legislation is being requested in order to execute the contract, review and approve the contractors proposed fabrication documents and begin equipment fabrication in time for the March 2007 boiler shut down.  The Boiler system is the primary heat source for the HCWP and can only be taken out of service from March thru October.  Emergency legislation is also requested in order to expedite the asbestos hazard abatement in the facility.
 
FISCAL IMPACT:  This project is included in the 2006 CIB and $3,300,000.00  is budgeted.  Funds are also being transfered within the CIB to fund the contract.
 
 
CONTRACT COMPLIANCE NUMBER: 25-0776180
 
 
Title
 
To authorize the Director of Public Utilities to enter into a contract with Sauer Incorporated for  the Hap Cremean Water Plant, Asbestos Hazard Abatement & Heating System Replacement, for the Division of Power and Water (pka the Division of Water), to authorize the expenditure of $3,711,750.00 from the Waterworks Enlargement Voted 1991 Bonds Fund,  and to authorize the City Auditor to transfer funds within the Waterworks Enlargement Voted 1991 Bonds Fund, and to declare an emergency.   ($3,711,750.00)
 
 
 
Body
 
WHEREAS, the Director of Public Utilities did receive and open bids on October 25, 2006 for the Hap Cremean Water Plant, Asbestos Hazard Abatement & Heating System Replacement for the Division of Power and Water  (pka the Division of Water), Department of Public Utilities, and
 
WHEREAS, a satisfactory low bid has been received, and
 
WHEREAS, The Hap Cremean Water Plant was originally constructed in the 1950's with a significant addition constructed in the 1970's, and
 
WHEREAS, A recently completed asbestos survey identified asbestos containing materials at the facility, including the insulation on the steam piping lines of the heating system. This project will accomplish the removal of asbestos from miscellaneous buildings and the replacement of the heating system for the main treatment building at the plant, and
 
WHEREAS, an emergency exists  in the usual daily operations of the Division of Power and Water (fka the Division of Water), Department of Public Utilities in that it is immediately necessary to authorize the Director of Public Utilities to enter into a Contract with Sauer Incorporated for  the Hap Cremean Water Plant, Asbestos Hazard Abatement & Heating System Replacement, for the Division of Power and Water (pka the Division of Water), to execute the contract, review and approve the contractors proposed fabrication documents and begin equipment fabrication in time for the March 2007 boiler shut down , and in order to expedite the asbestos hazard abatement in the facility, and for the preservation of public health, peace, property and safety, now, therefore;
 
BE IT ORDAINED BY THE COUNCIL OF THE CITY OF COLUMBUS
 
Section 1. That the Director of Public Utilities be and is hereby authorized to enter into a Contract with Sauer Incorporated, in the amount of $3,711,750.00 for the Hap Cremean Water Plant, Asbestos Hazard Abatement & Heating System Replacement, for the Division of Power and Water (pka the Division of Water), Department of Public Utilities, Contract No. 1047, Project 690490,on the basis of the lowest responsive and responsible and best bid received on October 25, 2006.
 
Section 2.  That for the purpose of paying the cost thereof, the expenditure of $3,711,750.00 is hereby authorized from Waterworks Enlargement Voted 1991 Bonds Fund, Fund No. 606, Department of Public Utilities, Division of Power and Water  (pka the Division of Water), Dept./Div No. 60-09, Object Level Three 6623, Project No. 690490, OCA Code 606490.
 
Section 3.  The City Auditor is hereby authorized to transfer the unencumbered balance in a project account to the unallocated balance account within the same fund upon receipt of certification by the Director of the Department administering said project; that the project has been completed and the monies are no longer required for said project except that no transfer shall be so made from a project account funded by monies from more than one source.
 
Section 4.  The City Auditor is hereby authorized and directed to appropriate and transfer funds from within the Waterworks Enlargement Voted 1991 Bonds Fund, Fund No. 606, Department of Public Utilities, Division of Power and Water  (pka the Division of Water), as follows:
 
FROM:            690359      South Wellfield Expansion                  $237,360.95
                              OCA Code 606428
 
690428      DRWP Treatment Capacity Increase            $1,174,389.05
                              OCA Code 606428
 
690492      DRWP Raw Water Intake                        $2,300,000.00
                              OCA Code 606492
 
TO:            690490      HCWP Asbestos Hazard Abatement & Heating System Replacement
                                      $3,711,750.00
                              OCA Code 606490
 
Section 5.  That the 2006 Capital Improvements Budget Ordinance No. 1108-2006 is hereby amended as follows:
 
CURRENT:  
 
690490      HCWP Asbestos Hazard Abatement & Heating System Replacement - $3,300,000
690492      DRWP Raw Water Intake - $2,300,000
 
AMENDED TO:
 
690490      HCWP Asbestos Hazard Abatement & Heating System Replacement - $3,711,750      (+$411,750)
690492      DRWP Raw Water Intake - $1,888,250                                    (-$411,750)
 
 
Section 6.  That for reasons stated in the preamble, hereto, which is hereby made a part hereof, this ordinance is declared to be an emergency measure and shall take effect and be in force from and after its passage and approval by the Mayor, or ten days after approval if the Mayor neither approves nor vetoes the same.