Title: To authorize the Director of Public Utilities to execute a construction contract with Beheler Excavating, Inc.; to provide for payment of inspection, material testing and related services to the Design and Construction Division for the Safford/Union Area Stormwater System and Water Line Improvements Projects, for the Divisions of Sewerage and Drainage & Power and Water (Water); to authorize the expenditure of $629,262.00 from the Storm Sewer Bonds Fund; to authorize the expenditure of $345,491.79 from the Storm Build America Bonds Fund; to authorize the transfer and expenditure of $923,746.21 within the Water Build America Bonds Fund; and to authorize an amendment to the 2011 Capital Improvements Budget. ($1,898,500.00)
Attachments: 1. 0312-2012 610761 Bid Tab, 2. 0312-2012 610761 QFF, 3. 0312-2012 Director's Legislation Information Sheet CIPs 610761-690236, 4. 0312-2012 R Sub-Contractors, 5. 0312-2012MAP
Explanation
1.  BACKGROUND:  This legislation authorizes the Director of Public Utilities to enter into a construction contract with Beheler Excavating, Inc., in the amount of $1,650,000.00; to encumber funds with the Design and Construction Division for inspection, testing, and prevailing wage coordination services in the amount of $248,500.00 all in connection with the Safford/Union Area Stormwater System and Water Line Improvements Projects.
This project includes $629,262.00 for Stormwater System Improvements as directed by the Project Engineer, which will be paid from the Storm Sewer Bonds Fund; $345,491.79 for Stormwater System Improvements as directed by the Project Engineer, which will be paid from the Storm Build America Bonds Fund and the Storm Sewer Bonds Fund; and $923,746.21 for Water Line Improvements as directed by the Project Engineer, which will be paid from the Water Build America Bonds Fund.  
 
2.  CONSTRUCTION CONTRACT AWARD:  The Director of Public Utilities publicly opened eight (8) bids on December 21, 2011.  These bids were received from: Beheler-$1,650,000.00, Underground Utilities - $1,833,434.67, Elite - $1,868,848.96, Eramo - $2,030,298.90, Savko - $2,130,612.76, Trucco - $2,239,277.48, Igel - $2,280,674.20, and Complete General - $2,345,567.72.
The lowest and best bid was from Beheler Excavating, Inc., for $1,650,000.00.  Additional information regarding each bidder, description of work, contract timeframe, detailed amounts and sub-contractors can be found on the attached Legislation Information Form.
Contract Compliance Information:  30-0160262, expires 02/22/2013, Majority
Searches in the Excluded Party List System (Federal) and the Findings for Recovery list (State) produced no findings against Beheler Excavating, Inc.
3.  FISCAL IMPACT:  There is sufficient cash for the Stormwater portion of this project in both the Storm Build America Bonds Fund and the Storm Sewer Bonds Fund from cancellations.  A transfer of funds within the Water Build America Bonds Fund and an amendment to the 2011 Capital Improvements Budget will also be necessary for both Stormwater and Water.
Title
To authorize the Director of Public Utilities to execute a construction contract with Beheler Excavating, Inc.; to provide for payment of inspection, material testing and related services to the Design and Construction Division for the Safford/Union Area Stormwater System and Water Line Improvements Projects, for the Divisions of Sewerage and Drainage & Power and Water (Water); to authorize the expenditure of $629,262.00 from the Storm Sewer Bonds Fund; to authorize the expenditure of $345,491.79 from the Storm Build America Bonds Fund; to authorize the transfer and expenditure of $923,746.21 within the Water Build America Bonds Fund; and to authorize an amendment to the 2011 Capital Improvements Budget. ($1,898,500.00)
Body
WHEREAS, eight (8) bid proposals were received and publicly opened in the offices of the Director of Public Utilities on December 21, 2011 for the construction of the Safford/Union Area Stormwater System and Water Line Improvements Projects; and
WHEREAS, it is necessary to authorize the Director of the Department of Public Utilities to award and execute a construction contract and to encumber and expend funds to provide for payment of inspection, testing and prevailing wage coordination services costs associated with the Safford/Union Area Stormwater System and Water Line Improvements Projects; and
 
WHEREAS, it is necessary for this Council to authorize the City Auditor to transfer funds within the Water Build America Bonds Fund; and
WHEREAS, it is necessary to authorize an amendment to the 2011 Capital Improvements Budget for purposes of providing sufficient funding and spending authority for the aforementioned project expenditure; and
WHEREAS, this project will mitigate street and yard flooding and improve water infrastructure along Union, Springmont, Safford, and Homewood Avenues between Highland and Whitethorne Avenues.; and
WHEREAS, in the usual daily operation of the Department of Public Utilities, Divisions of Sewerage and Drainage & Power and Water it is necessary to enter into a construction contract with Beheler Excavating, Inc. for the Safford/Union Area Stormwater System and Water Line Improvements Projects for the preservation of public health, peace, property and safety; now therefore,
BE IT ORDAINED BY THE COUNCIL OF THE CITY OF COLUMBUS:
SECTION 1.  That the Director of Public Utilities be, and hereby is, authorized to award and execute a contract for construction of the Safford/Union Area Stormwater System and Water Line Improvements Projects with the lowest and best bidder, Beheler Excavating, Inc., 14923 Toms Road, Butler, OH; in the amount of $1,650,000.00 in accordance with the terms and conditions of the contract on file in the Office of the Division of Sewerage and Drainage; and to obtain the necessary inspection, testing and prevailing wage coordination services from the Design and Construction Division; and to pay up to a maximum amount of $1,898,500.00.
SECTION 2.  That the City Auditor is hereby authorized and directed to appropriate the following funds:
Division:  Power and Water
Fund Name:  Water Build America Bonds Fund
Fund No.:  609
Dept./Div. No.:  60-09
OL3: 6629
Project No.      Project Name      OCA            Amount
609999-100000 (carryover)      Unallocated Balance      609999      $210,780.30
SECTION 3.  That the City Auditor is hereby authorized to transfer $246,231.71 within the Division of Power and Water, Dept/Div. No. 60-09, Water Build America Bonds Fund, Fund No. 609, Object Level One 06, Object Level Three 6629, as follows:
Fund No. | Project No. | Project Name | OCA Code | change
609 | 609999-100000 (carryover) | Unallocated Balance | 609999 | -$104,888.54
609 | 690359-100002 (carryover) | S. Wellfield Pump House | 693592 | -$62,500
609 | 690365-100000 (carryover) | Sullivant Ave. W.L. Clng | 693650 | -$75,220
609 | 690507-100000 (carryover) | HCWP Floc/Lime Basin | 606507 | -$3,623.17
609 | 690236-100007 (carryover) | Safford/Union W.L. Imp's | 692367 | +$246,231.71
SECTION 4.  That the 2011 Capital Improvements Budget is hereby amended as follows:
Proj. No. | Proj. Name | Current Authority | Revised Authority | Change
609 | 609999-100000 (carryover) | Unallocated Balance | $0 | $210,781 | +$210,781
(establish authority for entire amount being appropriated)
609 | 609999-100000 (carryover) | Unallocated Balance | $210,781 | $105,892 | -$104,889
609 | 690359-100002 (carryover) | S. Wellfield Pump House | $62,500 | $0 | -$62,500
609 | 690365-100000 (carryover) | Sullivant Ave. W.L. Clng | $2,856,772 | $2,781,552 | -$75,220
609 | 690507-100000 (carryover) | HCWP Floc/Lime Basin | $325,000 | $328,304 | +$3,304
(establish authority for cash)
609 | 690507-100000 (carryover) | HCWP Floc/Lime Basin | $328,304 | $324,680 | -$3,624
609 | 690236-100007 (carryover) | Safford/Union W.L. Imp's | $686,982 | $933,215 | +$246,233
 
SECTION 5.  That for the purpose of paying the cost of the construction contract, the following expenditure, or as much thereof as may be needed is hereby authorized as follows:  Division 60-15, Storm Sewer Bonds Fund No. 685, Project 610761-100000, Object Level Three 6621, OCA Code 685761, Amount $629,262.00.
SECTION 6.  That for the purpose of paying the cost of the construction contract, the following expenditure, or as much thereof as may be needed is hereby authorized as follows:  Division 60-15, Storm Build America Bonds Fund No. 676, Project 610761-100000, Object Level Three 6621, OCA Code 676761, Amount $218,756.79.
SECTION 7.  That for the purpose of paying the cost of inspection, testing and prevailing wage coordination services, the following expenditure, or as much thereof as may be needed is hereby authorized as follows:  Division 60-15, Storm Build America Bonds Fund No. 676, Project 610761-100000, Object Level Three 6687, OCA Code 676761, Amount $126,735.00.
SECTION 8.  That for the purpose of paying the cost of the construction contract, the cost of inspection, testing and prevailing wage coordination services, the following expenditure, or as much thereof as may be needed is hereby authorized as follows:  Division 60-09, Water Build America Bonds Fund, Fund No. 609, Project 690236-100007 (carryover), Object Level Three 6629, OCA Code 692367, Amount $923,746.21.
SECTION 9.  That the said construction company shall conduct the work to the satisfaction of the Director of Public Utilities and the Administrators of the Division of Sewerage and Drainage & Power and Water.
SECTION 10.  That the City Auditor is hereby authorized and directed to transfer any unencumbered balance in the project account to the unallocated balance within the same fund upon receipt of certification by the Director of the Department administering said project that the project has been completed and the monies no longer required for said project; except that no transfer shall be made from a project account by monies from more than one source.
SECTION 11.  That the City Auditor is authorized to establish proper project accounting numbers as appropriate.
SECTION 12. That the City Auditor is authorized to make any accounting changes to revise the funding source for all contracts or contract modifications associated with this ordinance.      
 
SECTION 13.  That this Ordinance shall take effect and be in force from and after the earliest period allowed by law.