File #: 1511-2006    Version: 1
Type: Ordinance Status: Passed
File created: 8/25/2006 In control: Public Service & Transportation Committee
On agenda: 10/2/2006 Final action: 10/4/2006
Title: To authorize the Public Service Director to enter into a contract with Dynalectric Company of Ohio for construction of the Standby Generator Project, Contract 2 project; to authorize the Public Service Director to enter into contracts with Columbus Gas of Ohio/Nisource for natural gas service modifications germane to the project; to authorize associated construction inspection costs; to authorize the expenditure of $756,136.70 or so much thereof as may be needed from the 1995, 1999, 2004 Voted Streets and Highways Fund for the Transportation Division; and to declare an emergency. ($756,136.70)
Date Ver.Action ByActionResultAction DetailsMeeting Details
10/4/20061 MAYOR Signed  Action details Meeting details
10/4/20061 CITY CLERK Attest  Action details Meeting details
10/2/20061 Columbus City Council ApprovedPass Action details Meeting details
10/2/20061 COUNCIL PRESIDENT Signed  Action details Meeting details
9/19/20061 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
9/19/20061 Service Reviewer Sent to Clerk's Office for Council  Action details Meeting details
9/15/20061 Auditor Reviewer Reviewed and Approved  Action details Meeting details
9/15/20061 CITY AUDITOR Reviewed and Approved  Action details Meeting details
9/15/20061 SERVICE DIRECTOR Reviewed and Approved  Action details Meeting details
9/15/20061 EBOCO Reviewer Reviewed and Approved  Action details Meeting details
9/15/20061 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
9/15/20061 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
9/15/20061 SERVICE DIRECTOR Reviewed and Approved  Action details Meeting details
9/15/20061 City Clerk's Office Sent back for Clarification/Correction  Action details Meeting details
9/15/20061 SERVICE DIRECTOR Reviewed and Approved  Action details Meeting details
9/14/20061 SERVICE DIRECTOR Reviewed and Approved  Action details Meeting details
9/13/20061 Finance Reviewer Reviewed and Approved  Action details Meeting details
9/13/20061 Finance Reviewer Reviewed and Approved  Action details Meeting details
9/13/20061 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
9/7/20061 SERVICE DIRECTOR Reviewed and Approved  Action details Meeting details
9/5/20061 Service Reviewer Reviewed and Approved  Action details Meeting details
8/25/20061 Service Drafter Sent for Approval  Action details Meeting details
Explanation
The Public Service Department, Transportation Division, is pursuing the acquisition and installation of standby electrical generators at several city facilities.  The ice storm event of December 2004 identified a gap in the Division's ability to provide consistent and necessary services due to the lack of power at the maintenance post serving the area(s) affected by that prolonged and widespread power outage.  This legislation authorizes the City to enter into a contract in an amount up to $688,251.00 for the Standby Generator Project, Contract 2 project and to pay construction inspection costs up to $61,463.70.  This improvement provides backup power to critical roadway maintenance facilities at 650 Nationwide Boulevard and 1820 East Seventeenth Avenue and the City's 3-1-1-call center at 2100 Alum Creek Drive in the event of a localized or city-wide power failure.  The project was let by the Transportation Division and was advertised in the City Bulletin and Dodge Reports and by the Builders Exchange.  Three bidders/suppliers requested bid documents, and one bid was received and tabulated on August 4, 2006 as follows:
 
bidder / amount bid
Dynalectric Company of Ohio / $688,251.00
 
Award is to be made to Dynalectric Company of Ohio, contract compliance number 13-3636476 (expires June 30, 2008), as the lowest, best, most responsive and most responsible bidder.
 
Columbia Gas is the natural gas supplier to each of the three sites.  In two locations the existing service line is capable of providing the volume required but the regulator is not properly sized.  A new gas line is required at 1820 East Seventeenth Avenue.  An agreement to change the service and the supplier's equipment is needed to operate the system.  These changes require that Columbia Gas/Nisource be compensated in the amount of $6,422.00 and this ordinance authorizes this expense.
 
This is the first in a series of five ordinances for installation of standby generators at the North, West, South and Central Outposts as well as the Traffic Maintenance, Roadway Maintenance, and Inspection Services facilities.  The back-up to the police command center is Transportation's Training facility, also to be supplied with standby power.  The 311 Call Center and the Traffic Management Center at 109 North Front Street are also locations served.  The contracts include the generators, automatic switching equipment and connections to natural gas lines.   
 
Fiscal Impact:  Funds for this expenditure in the amount of $756,136.70 ($688,251.00 + 61,463.70 + $6,422.00) are budgeted and available within the Transportation Division's 2005 Capital Improvement Budget in the 1995, 1999, 2004 Voted Streets and Highways Fund in the Facilities project.
 
Emergency action is requested to allow construction to commence on October 2, 2006.  The estimated Notice to Proceed date is September 25, 2006.  The contractor has been given 95 days to complete the construction of this project.
 
 
 
Title
To authorize the Public Service Director to enter into a contract with Dynalectric Company of Ohio for construction of the Standby Generator Project, Contract 2 project; to authorize the Public Service Director to enter into contracts with Columbus Gas of Ohio/Nisource for natural gas service modifications germane to the project; to authorize associated construction inspection costs; to authorize the expenditure of $756,136.70 or so much thereof as may be needed from the 1995, 1999, 2004 Voted Streets and Highways Fund for the Transportation Division; and to declare an emergency.  ($756,136.70)
 
 
 
Body
WHEREAS, bids were received on August 3, 2006, and tabulated on August 4, 2006, for the Standby Generator Project, Contract 2 project and a satisfactory bid has been received; and
 
WHEREAS, it is necessary to provide for construction inspection costs; and
 
WHEREAS, it is necessary that the Public Service Director enter into contracts with Columbia Gas/Nisource to provide sufficient natural gas service capacity to operate the standby generators and satisfy the cost connected therewith, and
 
WHEREAS, an emergency exists in the usual daily operation of the Transportation Division in that the contracts should be awarded immediately so that construction can commence not later than October 2, 2006, thereby preserving the public health, peace, property, safety and welfare; now, therefore
 
BE IT ORDAINED BY THE COUNCIL OF THE CITY OF COLUMBUS:
SECTION 1.  That the Public Service Director be and hereby is authorized to enter into a contract with Dynalectric Company of Ohio, 2300 International Street, Columbus, Ohio 43228-4621 for the construction of the Standby Generator Project, Contract 2 project for the Transportation Division at a cost not to exceed $688,251.00 and to pay construction inspection charges germane to the project at a cost not to exceed $61,463.70.
 
SECTION 2.  That the Public Service Director be and hereby is authorized to enter into a contract with Columbia Gas/Nisource to provide sufficient natural gas service capacity to operate the standby generators at a cost not to exceed $6,422.00.
 
SECTION 3.  That the expenditure of $756,136.70 or so much thereof as may be needed be and hereby is authorized from Fund 704, the 1995, 1999, 2004 Voted Streets and Highways Fund, Department No. 59-09, Transportation Division, Object Level One Code 06, Object Level Three Code 6620, OCA Code 644385 and Project 590130.
 
SECTION 4.  That for the reasons stated in the preamble hereto, which is hereby made a part hereof, this ordinance is hereby declared to be an emergency measure and shall take effect and be in force from and after its passage and approval by the Mayor or ten days after passage if the Mayor neither approves nor vetoes the same.