header-left
File #: 0133-2022    Version: 1
Type: Ordinance Status: Passed
File created: 1/5/2022 In control: Public Utilities Committee
On agenda: 2/7/2022 Final action: 2/10/2022
Title: To authorize the Director of Public Utilities to renew an existing engineering agreement with DLZ Ohio, Inc. for the Lower Olentangy Tunnel Phase 1 & 2; to appropriate, transfer, and expend up to $1,960,034.50 from the Sanitary Sewer PayGo Fund 6116; and to amend the 2021 Capital Improvements Budget for the Division of Sewerage and Drainage. ($1,960,034.50)
Attachments: 1. 00 DLZ Schedule 2A-1 SWIF CR#4 V1, 2. 0133-2022 Funding Template, 3. LOT Project map, 4. Director's Legislation Information Sheet (650724) #4

Explanation

 

1.                     BACKGROUND:  This legislation authorizes the Director of Public Utilities to renew an existing engineering agreement with DLZ Ohio, Inc. for the Lower Olentangy Tunnel Phase 1 & 2, CIP 650724-100000. Review of existing information, preliminary field investigations, preliminary geotechnical investigation and preliminary design report have been completed under the original contract. 

A large portion of the detailed design, final geotechnical investigation, survey, and easement preparation were completed under Renewal No. 1.

 

Completion of detailed design, production of specifications and bidding related services was completed with Renewal No. 2. 

 

Contract Renewal No. 3 included engineering services during construction for the first year. 

 

Contract Renewal No. 4 will include the continuation of engineering services during construction for the second year.  There will be a renewal each year to continue these services.

 

Planning Area: the project is located within the Downtown, Near North/University and the West Olentangy community planning areas.

 

Renewal Information:    

 

1.1 Amount of additional funds to be expended: $1,960,034.50

Original Contract                     $5,488,356.00

Renewal No. 1                     $5,402,729.00

Renewal No. 2                     $5,482,693.30

Renewal No. 3                     $1,979,602.00

Renewal No. 4                     $1,960,034.50

CURRENT PROPOSED TOTAL                                                               $20,313,414.80

 

1.2 Reasons additional goods/services could not be foreseen.

This renewal was anticipated

 

1.3 Reason other procurement processes are not used:

Substantial information and knowledge has been developed by the consultant through work performed during the first three years of work on this engineering agreement.  If the work to be performed under this Renewal was to be bid out separately, tasks already completed would be performed repetitively causing significant delays and incurring additional cost.  Also delays would put the City at risk of missing consent order deadlines.

 

1.4 How cost of modification was determined:

A scope of services, consistent with the original proposal and contract, was developed and fee was negotiated between the City and consultant.

 

2.                     PROJECT TIMELINE: Renewal No. 4 will fund construction services through 2022.

 

3.                     EMERGENCY DESIGNATION: An emergency designation is not requested at this time

 

4.                     CONTRACT COMPIANCE NO: 31-1268980 | MBR | 2/28/2023 | Vendor # 004939

 

5.   ECONOMIC IMPACT: The project was identified in the Integrated Plan and 2015 Wet Weather Management Plan (WWMP) Update Report which was developed with input from numerous stakeholder groups and submitted to the Ohio EPA.  The project will mitigate sewer overflows into the Olentangy River as described in the report. Short term economic impacts will be in terms of the prime and twelve sub consultants work on design of the project.

 

6.  FISCAL IMPACT: This ordinance requires the appropriation of, transfer within and the expenditure of up to $1,960,034.50 from the Sanitary Sewer PayGo Fund 6116. It also authorizes an amendment to the 2021 Capital Improvements Budget for the creation of sufficient authority for this project.

Title

 

To authorize the Director of Public Utilities to renew an existing engineering agreement with DLZ Ohio, Inc. for the Lower Olentangy Tunnel Phase 1 & 2; to appropriate, transfer, and expend up to $1,960,034.50 from the Sanitary Sewer PayGo Fund 6116; and to amend the 2021 Capital Improvements Budget for the Division of Sewerage and Drainage. ($1,960,034.50)

 

Body

 

WHEREAS, it is necessary to authorize a planned renewal of an existing engineering agreement with DLZ Ohio, Inc. for the Lower Olentangy Tunnel Phase 1 & 2, CIP 650724-100000; and

 

WHEREAS, the work for this project will include engineering services during construction for 2022; and

 

WHEREAS, it is necessary to authorize the appropriation, transfer, and the expenditure of up to $1,960,034.50 from the Sanitary Sewer PayGo Fund 6116; and

 

WHEREAS, it is necessary to amend the 2021 Capital Improvements Budget for purposes of creating and providing sufficient budget authority for the aforementioned expenditures; and

 

WHEREAS, it has become necessary in the usual daily operation the Division of Sewerage and Drainage, Department of Public Utilities, to authorize the Director of Public Utilities to renew an existing engineering agreement with DLZ Ohio, Inc. for the Lower Olentangy Tunnel Phase 1 &2, CIP 650724-100000 for the preservation of the public health, peace, property and safety; now, therefore

 

BE IT ORDAINED BY THE COUNCIL OF THE CITY OF COLUMBUS:

 

SECTION 1. That the Director of Public Utilities is hereby authorized to renew an existing engineering agreement with DLZ Ohio, Inc., 6121 Huntley Road, Columbus, OH 43231, for the Lower Olentangy Tunnel Phase 1 & 2 Project in accordance with the terms and conditions as shown on the contract on file in the office of the Division of Sewerage and Drainage.

 

SECTION 2. That the City Auditor is hereby authorized to appropriate and transfer within $1,960,034.50 from the Sanitary Sewer PayGo Fund 6116, per the account codes in the attachment to this ordinance.

 

SECTION 3. That the Director of Public Utilities is hereby authorized to expend up to $1,960,034.50 from the Sanitary Sewer PayGo Fund 6116 per the account codes in the attachment to this ordinance.

 

SECTION 4.  That the 2021 Capital Improvements Budget is amended per the attachment to this ordinance.

 

SECTION 5. That said company, DLZ Ohio, Inc., shall perform the work to the satisfaction of the Director of Public Utilities and the Administrator of the Division of Sewerage and Drainage.

 

SECTION 6.   That the City Auditor is hereby authorized to transfer any unencumbered balance in the project account to the unallocated balance within the same fund upon receipt of certification by the Director of the Department administering said project that the project has been completed and the monies are no longer required for said project; except that no transfer shall be made from a project by monies from more than one source.

 

SECTION 7.   That the City Auditor is authorized to establish proper project accounting numbers as appropriate.

 

SECTION 8.   That the City Auditor is authorized to make any accounting changes to revise the funding source for all contracts or contract modifications associated with this ordinance.

 

SECTION 9. That the funds necessary to carry out the purpose of this ordinance are hereby appropriated and the City Auditor shall establish such accounting codes as necessary.

 

SECTION 10.   That this ordinance shall take effect and be in force from and after the earliest period allowed by law.