File #: 2271-2006    Version: 1
Type: Ordinance Status: Passed
File created: 12/7/2006 In control: Utilities Committee
On agenda: 2/12/2007 Final action: 2/14/2007
Title: To authorize the Director of Public Utilities to enter into a final planned modification of the heat welding, asphalt repair, and concrete repair contracts with Decker Construction Company, for the Utility Cut and Restoration Project, for the Division of Power and Water and Division of Sewerage and Drainage, to authorize the expenditure of $560,000.00 from Water Systems Operating Fund and $530,000.00 from the Sewer Systems Operating Fund. ($1,090,000.00)
Attachments: 1. Information for Legislation.pdf
Date Ver.Action ByActionResultAction DetailsMeeting Details
2/14/20071 CITY CLERK Attest  Action details Meeting details
2/13/20071 MAYOR Signed  Action details Meeting details
2/12/20071 Columbus City Council ApprovedPass Action details Meeting details
2/12/20071 COUNCIL PRESIDENT Signed  Action details Meeting details
2/5/20071 Columbus City Council Read for the First Time  Action details Meeting details
1/30/20071 Utilities Drafter Sent to Clerk's Office for Council  Action details Meeting details
1/29/20071 Finance Reviewer Reviewed and Approved  Action details Meeting details
1/29/20071 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
1/26/20071 Utilities Drafter Sent for Approval  Action details Meeting details
1/25/20071 City Clerk's Office Sent back for Clarification/Correction  Action details Meeting details
1/24/20071 Utilities Drafter Sent for Approval  Action details Meeting details
1/24/20071 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
1/24/20071 Utilities Drafter Sent to Clerk's Office for Council  Action details Meeting details
1/23/20071 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
1/23/20071 Utilities Drafter Sent for Approval  Action details Meeting details
1/23/20071 Auditor Reviewer Contingent  Action details Meeting details
1/23/20071 CITY AUDITOR Reviewed and Approved  Action details Meeting details
1/22/20071 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
1/22/20071 Utilities Drafter Sent for Approval  Action details Meeting details
1/22/20071 EBOCO Reviewer Reviewed and Approved  Action details Meeting details
1/18/20071 Utilities Reviewer Sent for Approval  Action details Meeting details
1/17/20071 Utilities Drafter Sent for Approval  Action details Meeting details
1/16/20071 Utilities Drafter Sent for Approval  Action details Meeting details
1/16/20071 Utilities Reviewer Reviewed and Approved  Action details Meeting details
1/16/20071 Utilities Drafter Sent for Approval  Action details Meeting details
1/16/20071 Utilities Reviewer Reviewed and Approved  Action details Meeting details
1/12/20071 Utilities Drafter Sent for Approval  Action details Meeting details
1/12/20071 Utilities Drafter Sent for Approval  Action details Meeting details
12/7/20061 Utilities Drafter Sent for Approval  Action details Meeting details
 
BACKGROUND:  The Department of Public Utilities entered into three contracts with Decker Construction Company for the Utility Cut and Restoration Project, which includes heat welding, asphalt repairs, and concrete repairs.  These contracts were the result of Director's bids received in March 2005.  Decker Construction Company was the only bidder for the heat welding and asphalt repairs, and was the lowest responsive, responsible, and best bidder for concrete repairs.  The original contracts were for a period of one year with an option to renew for two one-year extensions. Since the Department is pleased with their performance over the last year, we would like to modify the original contracts to enter into a third year, for a grand total of $1,090,000.00.  The Contract Compliance Number for Decker Construction Company is 31-0983557.  They do not have MBE/FBE status.
 
1.      The amount of additional funds needed for these contracts is $1,090,000.00.  The original contracts were established for $560,000.00.  The total cost of the original contracts, the first modification, the second modification, the third modification, and this modification is $2,960,000.00.  Modifications represent funding added during the contract period for increased cost related to the services provided.  The need for increased funding is directly related to system repairs over and above those originally anticipated.  The contract will not exceed three years, as originally specified, and will be rebid late in 2007.
 
2.      The need for additional funds was known at the time of the initial contract, as this is an annual expenditure.  This legislation is to encumber the funds budgeted for fiscal year 2007 for the Division of Power and Water and the Division of Sewerage and Drainage.
 
3.      As mentioned above, the initial agreement allowed us to contract with the vendor for a total of three years.  Since the Department has been pleased with their performance over the last year we would like to continue these contracts with the vendor.
 
4.      The cost of this service is based on a quote from the vendor.
FISCAL IMPACT: The Divisions of Power and Water and Sewerage and Drainage allocated $560,000.00 and $530,000.00, respectively for these services in the 2007 budget.  
 
2006 encumbrances for Power and Water and Sewerage and Drainage are $560,000.00 and $600,000.00 respectively.
 
2005 encumbrances for Power and Water and Sewerage and Drainage are $560,000.00 and $200,000.00 respectively.
 
 
Title
 
To authorize the Director of Public Utilities to enter into a final planned modification of the heat welding, asphalt repair, and concrete repair contracts with Decker Construction Company, for the Utility Cut and Restoration Project, for the Division of Power and Water and Division of Sewerage and Drainage, to authorize the expenditure of $560,000.00 from Water Systems Operating Fund and $530,000.00 from the Sewer Systems Operating Fund.  ($1,090,000.00)
 
 
 
Body
 
WHEREAS, the Department of Public Utilities has contract number EL005375 (heat welding), EL005373 (asphalt) and EL005323 (concrete) with Decker Construction Company, for the Utility Cut and Restoration Project, and
 
WHEREAS, the initial terms of the agreement included the option to extend the contracts for two additional one-year extensions, and
 
WHEREAS, the Department has been pleased with their performance over the last year and would like to modify and increase the contracts to enter the third year, for the preservation of public health, peace, property and safety; now, therefore,
 
BE IT ORDAINED BY THE COUNCIL OF THE CITY OF COLUMBUS:
 
Section 1.  That the Public Utilities Director be and is hereby authorized to modify and increase the contracts with Decker Construction Company, for the third year of the Utility Cut and Restoration Project, for the Divisions of Power and Water and Sewerage and Drainage, Department of Public Utilities.
 
Section 2.  That the expenditure of $1,090,000.00 or as much thereof as may be needed is hereby authorized from Object Level One 03, Object Level Three 3375, Fund Names and Numbers, Departments, OCA Codes and amounts listed below, to pay the cost thereof.
 
Fund Name                  Fund No.            Dept No.      OCA Code            Amount
 
Water Works Operating                       600                                  60-09               602722                     $  10,000
                                                         602730            $550,000
 
Sewer Systems Operating                      650                                   60-05               605089            $530,000
 
Section 3.  That this Ordinance shall take effect and be in effect and be in force from and after the earliest period allowed by law.