Title: To amend the 2012 Capital Improvement Budget; to authorize the City Auditor to transfer funds between projects within the Streets and Highways Bond Funds; to authorize the Director of the Department of Public Service to enter into a design guaranteed maximum reimbursement agreement with Wagenbrenner Development, Inc. pursuant to Section 186 of the Columbus City Charter, for the design of public infrastructure improvements in connection with the Miscellaneous Economic Development - Weinland Park (Columbus Coated Fabrics) Phase 3B project in an amount up to $700,000.00; to authorize the expenditure of up to $700,000.00 from the Streets and Highways G.O. Bonds Fund and to declare an emergency. ($700,000.00)
Explanation
 
1.  BACKGROUND
On August 29, 2008, the City entered into the Columbus Coated Fabrics Economic Development Agreement (EDA) with Wagenbrenner Development, Inc. under the authorization of Ordinance No. 1456-2007, passed by its Council on March 19, 2008, through which the City agreed to fund up to $12.85 million for the design and construction of improved public roadways and utilities in and around the former Columbus Coated Fabrics site.
 
This ordinance authorizes the Director of the Department of Public Service to enter into a design guaranteed maximum reimbursement agreement with Wagenbrenner Development, Inc., for an amount up to $700,000.00 for the design of public infrastructure improvements for Miscellaneous Economic Development - Weinland Park (Columbus Coated Fabrics) Phase 3B.
 
The scope of public infrastructure improvements for Miscellaneous Economic Development - Weinland Park (Columbus Coated Fabrics) Phase 3B consists of roadway resurfacing and the removal and replacement of curb and sidewalk along 11th Avenue from approximately 650' east of High Street to Grant Avenue.  Curb extensions will be added at appropriate intersections in accordance with the Weinland Park Community Mobility Plan and drainage structures will be added, where required, to maintain positive drainage.  The first alleys to the north and south of 11th Avenue between 4th Street and Grant Avenue will be reconstructed.  Traffic signals will be replaced and converted to utilize mast arm signal poles.  New street lighting and street trees will be installed.
 
2. CONTRACT COMPLIANCE INFORMATION
The contract compliance number for Wagenbrenner Development, Inc. is 26-3039980.  The expiration date is 1/18/2015.
3.  FISCAL IMPACT
The Department of Development will contribute up to $700,000.00 for this design guaranteed maximum reimbursement agreement.  This expense is budgeted within the Misc Econ Dev Cols Coated project 440104-100002 and is available within the Streets and Highways G.O. Bonds Fund 704.
 
4.  EMERGENCY DESIGNATION
The Department of Public Service is requesting this ordinance to be considered an emergency measure in order to allow for immediate execution of this design guaranteed maximum reimbursement agreement, which is necessary to facilitate the design of these improvements to maintain the project schedule and meet community commitments; thereby immediately preserving the public health, peace, property, safety and welfare.
 
 
Title
 
To amend the 2012 Capital Improvement Budget;  to authorize the City Auditor to transfer funds between projects within the Streets and Highways Bond Funds; to authorize the Director of the Department of Public Service to enter into a design guaranteed maximum reimbursement agreement with Wagenbrenner Development, Inc. pursuant to Section 186 of the Columbus City Charter, for the design of public infrastructure improvements in connection with the Miscellaneous Economic Development - Weinland Park (Columbus Coated Fabrics) Phase 3B project in an amount up to $700,000.00; to authorize the expenditure of up to $700,000.00 from the Streets and Highways G.O. Bonds Fund  and to declare an emergency. ($700,000.00)
 
Body
 
WHEREAS, the City entered into the Columbus Coated Fabrics Economic Development Agreement (EDA) with Wagenbrenner Development, Inc. on August 29, 2008, under the authorization of Ordinance No. 1456-2007, passed by its Council on March 19, 2008, through which the City agreed to fund up to $12.85 million for the design and construction of improved public roadways and utilities in and around the former Columbus Coated Fabrics site; and
 
WHEREAS, the Miscellaneous Economic Development - Weinland Park (Columbus Coated Fabrics) Phase 3B project is located adjacent to the former Columbus Coated Fabrics site; and
 
WHEREAS, public infrastructure improvements for this project include roadway resurfacing and the removal and replacement of curb and sidewalk along 11th Avenue from approximately 650' east of High Street to Grant Avenue.  Curb extensions will be added at appropriate intersections in accordance with the Weinland Park Community Mobility Plan and drainage structures will be added, where required, to maintain positive drainage.  The first alleys to the north and south of 11th Avenue between 4th Street and Grant Avenue will be reconstructed.  Traffic signals will be replaced and converted to utilize mast arm signal poles.  New street lighting and street trees will be installed; and
 
WHEREAS, the Department of Public Service has identified the need to enter into a design guaranteed maximum reimbursement agreement with Wagenbrenner Development, Inc. for the Miscellaneous Economic Development - Weinland Park (Columbus Coated Fabrics) Phase 3B project; and
 
WHEREAS, this ordinance authorizes the Director of the Department of Public Service to enter into a design guaranteed maximum reimbursement agreement with Wagenbrenner Development, Inc., in an amount up to $700,000.00 for the design of public infrastructure improvements in connection with the Miscellaneous Economic Development - Weinland Park (Columbus Coated Fabrics) Phase 3B project; and
 
WHEREAS, an emergency exists in the usual daily operation of the Department of Public Service, in that it is immediately necessary to authorize said design guaranteed maximum reimbursement agreement and the expenditure of such funds to maintain the project schedule and meet community commitments; thereby immediately preserving the public health, peace, property, safety and welfare; now, therefore,
 
BE IT ORDAINED BY THE COUNCIL OF THE CITY OF COLUMBUS:
 
SECTION 1. That the 2012 C.I.B. authorized by ordinance 0368-2012 be amended as follows to provide sufficient budget authority for this expenditure:
 
Fund / Project / Project Name /Current Budget / Change / Revised Budget
704 / 440104-100002 / Misc Econ Dev Cols Coated (Voted 2008) / $3,175,000 / ($700,000) / $2,475,000
704 / 440104-100012 / Misc. Economic Development - Misc. Econ. Dev. - Weinland Park (Cols Coated) - 11th Ave (Voted 2008) / $0 / $700,000 / $700,000
 
SECTION 2 That the City Auditor is hereby authorized transfer of cash and appropriation within Fund 704, The Streets and Highways G.O. Bonds Fund be authorized as follow:
 
Transfer from:
Fund / Project / Project Name / O.L. 01-03 Codes / OCA / Amount
704 / 59-01 / 440104-100002 / Misc Econ Dev Cols Coated / 06-6600 / 592104 / $700,000.00
      
Transfer to:
Fund / Project / Project Name / O.L. 01-03 Codes / OCA / Amount
704 / 59-01 / 440104-100012 / Misc. Econ. Dev. - Weinland Park (Cols Coated) - 11th Ave/ 06-6600 / 710412  / $700,000.00
 
SECTION 3.  That the Director of the Department of Public Service be and hereby is authorized to enter into a design guaranteed maximum reimbursement agreement with Wagenbrenner Development, Inc., 575 West First Avenue, Suite 100, Columbus, Ohio  43215, pursuant to Section 186 of the Columbus City Charter for design of public infrastructure improvements to be constructed in connection with Miscellaneous Economic Development - Weinland Park (Columbus Coated Fabrics) Phase 3B project at a cost up to $700,000.00.
 
 
SECTION 4.   That the sum of up to $700,000.00 is authorized to be expended for this design guaranteed maximum reimbursement agreement as follows:
 
Fund / Dept-Div / Project / Project Name / O.L. 01-03 Codes / OCA Code / Amount
704 / 59-01 / 440104100012 / Misc. Econ. Dev. - Weinland Park (Cols Coated) - 11th Ave / 06-6682 / 710412 / $700,000.00
SECTION 5.  That the funds necessary to carry out the purpose of this ordinance are hereby deemed appropriated, and the City Auditor shall establish such accounting codes as necessary.
 
SECTION 6.  That the City Auditor is authorized to make any accounting changes to revise the funding source for all contracts or contract modifications associated with this ordinance.
 
SECTION 7.  That the City Auditor is hereby authorized to transfer the unencumbered balance in a project account to the unallocated balance account within the same fund upon receipt of certification by the Director of the Department administering said project that the project has been completed and the monies are no longer required for said project.
 
SECTION 8.  That for the reasons stated in the preamble hereto, which is hereby made a part hereof, this ordinance is hereby declared to be an emergency measure and shall take effect and be in force from and after its passage and approval by the Mayor, or ten days after passage if the Mayor neither approves nor vetoes the same.