Explanation
1. BACKGROUND
This ordinance authorizes the Director of Columbus Water and Power to enter into a professional engineering services contract awarded through the City’s Request for Proposal process with Arcadis U.S., Inc., for the Sewer System Capacity Model Update 2026, CIP 650460-100003, in an amount up to $1,344,755.28.
Columbus Water and Power (CWP), Division of Water Reclamation (DWR), has identified the need to provide additional Professional Engineering Services to refine the system-wide sanitary and combined sewer collection system model, perform model applications including capacity evaluation and sewer system operations, flow monitoring with data management/analysis, provide support to Blueprint Columbus / 2015 Integrated Plan and Wet Weather Management Plan Update.
This project will continue development of the City's Sewer System Capacity Model (SSCM). SSCM plays a vital role in evaluating capacity deficiencies and devising economical solutions to those deficiencies. This project is necessary to ensure continued compliance with Ohio EPA SSO and CSO Consent Orders and to continue the City's commitment to eliminating sanitary sewer overflows (SSO's) and minimizing Water-in-Basement occurrences (WIB's). It is anticipated that this project will update the current SSCM with the most current collection system configuration; upgrade portions of its method of calculation to increase its accuracy; enhance its usability and operations; and apply the SSCM Update to new development, performance, and operational conditions.
Community Planning Area: 99 - Citywide
TIMELINE:
The contract is expected to begin in December 2026 and receive annual modifications in 2027, 2028, 2029, 2030.
ESTIMATED COST OF PROJECT:
The original contract amount will be $1,344,755.00. The proposed award amount is $1,344,755.28, including a 20% contingency amount that will be utilized to fund needed and approved changes in the work. Four modifications are anticipated at this time;
Original Contract (current) $ 1,344,755.28
Future Mod 1 (estimate) $ 1,000,000.00
Future Mod 2 (estimate) $ 1,000,000.00
Future Mod 3 (estimate) $ 1,000,000.00
Future Mod 4 (estimate) $ 1,000,000.00
Estimated contract total $ 5,344,755.28
2. ECONOMIC IMPACT/ADVANTAGES; COMMUNITY OUTREACH; PROJECT DEVELOPMENT; ENVIRONMENTAL FACTORS/ADVANTAGES OF PROJECT
This project will continue the development of the City's Sewer System Capacity Model (SSCM). The SSCM plays a vital role in evaluating capacity deficiencies and devising economical solutions to those deficiencies. This project is necessary to ensure continued compliance with the SSO and CSO Consent Orders and continue the City's commitment to eliminating sanitary sewer overflows (SSO's) and minimizing Water-in-Basement occurrences (WIB's). It is anticipated that this project will update the current SSCM with the most current collection system configuration; upgrade portions of its method of calculation to increase its accuracy; enhance its usability and operations; and apply the SSCM Update to new development, performance, and operational conditions.
3. BID INFORMATION
This project was formally advertised on the Vendor Services and Bonfire websites and opened 8/28/26. One proposal was received:
Name C.C. No. Exp. Date City/State Status
Arcadis U.S., Inc. CC-009409 1/27/27 Columbus, OH MAJ
An evaluation committee reviewed the proposals and recommended that the Sewer System Capacity Model Update 2026 project be awarded to Arcadis U.S., Inc.
Arcadis U.S., Inc.'s certification was in good standing at the time of the contract award.
4. CONTRACT COMPLIANCE INFORMATION
Arcadis U.S., Inc. Company’s contract compliance number is CC-009409 and expires on 1/21/27
As part of their proposal, Arcadis U.S., Inc. has proposed the following two subcontractors to perform contract work:
Company Name City/State ODI Certification Status
Coldwater Consulting, LLC Columbus, Ohio WBE
DLZ Ohio, Inc. Columbus, Ohio MBE
The certification of the above-listed companies was in good standing at the time the contract was awarded.
6. FISCAL IMPACT
A transfer of cash and appropriation and an expenditure of up to $1,344,755.28 from the Sanitary Bond Fund, Fund 6109, is needed to pay for the project.
7. EMERGENCY DESIGNATION
Emergency designation is requested for this ordinance. It is imperative that Arcadis U.S., Inc. continue performing DWR/SSES Scope Tasks without any delay/break. Continued support for DWR/SSES: CIP Projects, Blueprint, Plan Review Section, 2015 Integrated and 2005 Wet Weather Management Plan is needed immediately.
Title
To authorize the Director of Columbus Water and Power to enter into a professional engineering services contract with Arcadis U.S., Inc. for the Sewer System Capacity Model 2026 project; to authorize a transfer of cash and appropriation; to authorize an expenditure up to $1,344,755.28 from the Sanitary Bond Fund, and to declare an emergency. ($1,344,755.28)
Body
WHEREAS, Columbus Water and Power is engaged in the Sewer System Capacity Model Update 2026 project; and
WHEREAS, a Request for Proposals (RFP) was formally advertised on the Vendor Services and Bonfire websites and opened 8/28/26; and
WHEREAS, one proposal for the Sewer System Capacity Model Update 2026 project was received in response to the RFP; and
WHEREAS, the evaluation committee reviewed the proposal and recommended the contract be awarded to Arcadis U.S., Inc.; and
WHEREAS, it is necessary to authorize a transfer of cash and appropriation within the Sanitary Bond Fund, Fund 6109; and
WHEREAS, it is necessary to authorize the Director of Columbus Water and Power to enter into a professional services contract with Arcadis U.S., Inc. for the Sewer System Capacity Model Update 2026 project; and
WHEREAS, an emergency exists in the usual daily operation of Columbus Water and Power in that it is immediately necessary to authorize the Director of Columbus Water and Power to execute the contract for professional engineering services with Arcadis U.S., Inc. for the Sewer System Capacity Model Update 2026 so that the contracted services can begin promptly. The timely authorization of the contract is necessary to allow the vendor to begin the refining of the system-wide sanitary and combined sewer collection system model. This will prevent the need for additional time and resources, thereby preserving the public health, peace, property, safety, and welfare; and NOW, THEREFORE,
BE IT ORDAINED BY THE COUNCIL OF THE CITY OF COLUMBUS:
SECTION 1. That the Director of Columbus Water and Power is hereby authorized to enter into a professional engineering services agreement for the Sewer System Capacity Model Update 2026 project with Arcadis U.S., Inc. 7575 Huntington Park Drive, Suite 130, Columbus, OH 43235, for an expenditure up to $1,344,755.28, in accordance with the terms and conditions of the contract on file in Columbus Water and Power.
SECTION 2. That the transfer of cash and appropriation of $1,344,755.28, or so much thereof as may be needed, is hereby authorized in the Sanitary Bond Fund, Fund 6109, per the accounting codes in the attachment to this ordinance.
SECTION 3. Funds are hereby deemed appropriated and expenditures and transfers authorized to carry out the purposes of this ordinance and the City Auditor shall establish such accounting codes as necessary.
SECTION 4. That the City Auditor is authorized to make any accounting changes to revise the funding source for all contracts or contract modifications associated with this ordinance.
SECTION 5. That the City Auditor is hereby authorized to transfer the unencumbered balance in a project account to the unallocated balance account within the same fund upon receipt of certification by the Director of the Department administering said project that the project has been completed and the monies are no longer required for said project.
SECTION 6. That for the reasons stated in the preamble hereto, which is made a part hereof, this Ordinance is declared to be an emergency measure and shall take effect and be in force from and after its passage and approval by the Mayor, or ten (10) days after passage if the Mayor neither approves nor vetoes this Ordinance.