Explanation
This ordinance authorizes the Director of Public Utilities to enter into contract with TZT Manufacturing and Contracting Inc for the Jackson Pike Wastewater Treatment Plant Sludge Control Building HVAC Replacement. The HVAC system in the Sludge Control Building has been repaired over a period of three (3) years and needs to be replaced. Bids were opened on November 12, 2003 and three (3) bids were received. The tabulation below:
TZT Manufacturing and Contracting $96,000.00
Pete Miller Inc $168,168.00
Bruner Corporation $288,782.00
SUPPLIER: TZT Manufacturing and Contracting Inc (31-1292609)
FISCAL IMPACT: $116,000.00 is needed and budgeted for this project. The amount requested includes contingency money.
Title
To authorize the Director of Public Utilities to enter into contract with TZT Manufacturing and Contracting Inc for the Sludge Building HVAC Replacement for the Division of Sewerage and Drainage, to authorize the expenditure of $116,000.00 from the Sewerage System Operating Fund. ($116,000.00)
Body
WHEREAS, the Jackson Pike Wastewater Treatment Plant Sludge Building has a need to have the HVAC system replaced, and
WHEREAS, the Director of Public Utilities opened bids on November 12, 2003, and
WHEREAS, TZT Manufacturing and Contracting Inc was the lowest, responsive and responsible bidder and is recommended for contract award, now therefore,
BE IT ORDAINED BY THE COUNCIL OF THE CITY OF COLUMBUS:
Section 1. That the Director of Public Utilities be and is hereby authorized to enter into contract with TZT Manufacturing and Contracting Inc. for the Sludge Building HVAC Replacement for the Division of Sewerage and Drainage.
Section 2. That the expenditure of $116,000.00 or so much thereof as may be needed, be and the same hereby is authorized from the Sewerage System Operating Fund, Fund No. 650, OCA 604819, Object Level 1: 06, Object Level 03: 6624.
Section 3. That this Ordinance shall take effect and be in force from and after the earliest period allowed by law.