Title: To authorize the Director of Columbus Water & Power to enter into a professional services contract with Stantec Consulting Services, Inc. for the Oakland Park Avenue Area Water Line Improvements project; to authorize the Director of Columbus Water & Power to apply for and accept a loan from the Ohio Water Development Authority Direct Loan Program for the Oakland Park Avenue Area Water Line Improvements project; to make this ordinance contingent upon approval of a loan from the Ohio Water Development Authority; to appropriate funds within the Water - Fresh Water Market Rate Fund; and to authorize the expenditure of up to $479,045.10 from the Water - Fresh Water Market Rate Fund. ($479,045.10)
Indexes: MBE Participation
Attachments: 1. ORD 3177-2026 Accounting Template, 2. ORD 3177-2026 SOS Stantec, 3. ORD 3177-2026 Utilization form 2A-1
Date Ver.Action ByActionResultAction DetailsMeeting Details
No records to display.

Explanation   

1.  BACKGROUND

This ordinance authorizes the Director of Columbus Water & Power to enter into a professional services contract through the City’s RFP process with Stantec Consulting Services, Inc. for the Oakland Park Avenue Area Water Line Improvements Project, CIP 690236-100185, in an amount up to $479,045.10.

 

The purpose of this project is to construct necessary improvements to the water distribution system in the Oakland Park Avenue Area. The improvements identified in the scope of work will replace or rehabilitate water lines that have high break histories and require frequent maintenance. This project includes replacing or rehabilitating approximately 10,675 linear feet of 2-inch, 6-inch, and 8-inch water lines, transferring existing services, and replacing private lead service lines. The streets include Glenmont Avenue, Chatham Road, Piedmont Road, and Oakland Park Avenue.

 

This project is located within the following Community Planning Area: Clintonville - 39

 

TIMELINE: The duration of the design phase for this project is 14 months. It is estimated that the end of this agreement will occur in April 2028. The contract shall remain in effect until the City has approved and accepted the work.

 

ESTIMATED COST OF PROJECT:  The negotiated amount and proposed award amount is $479,045.10, including a 15% construction contingency amount that will be utilized to fund needed and approved changes in the work. No contract modifications are anticipated at this time; however, design exigency might later compel modification of this contract, if unforeseen difficulties are encountered.

 

Cost summary:

Original Contract                                               $479,045.10

                     Future Anticipated Needs                          $         0.00

                     CONTRACT TOTAL                                               $479,045.10

 

2. ECONOMIC IMPACT/ADVANTAGES; COMMUNITY OUTREACH; PROJECT DEVELOPMENT; ENVIRONMENTAL FACTORS/ADVANTAGES OF PROJECT

The goal of this project is to replace or rehabilitate the existing water lines that have a high break frequency. Replacement of these water lines will improve water service, decrease burden on water maintenance operations, and reduce water loss. The Neighborhood Liaison(s) will be contacted and informed of this project during the design phase. Further community outreach may result through the Neighborhood Liaison Program.

 

3.  BID INFORMATION

This project was formally advertised on the Vendor Services and Bonfire websites from July 24, 2026, through August 28, 2026.  Six proposals were received:

 

Name                                             Contract Compliance   Exp. Date      City/State              Status

Moody Engineering, LLC                            CC012301                                5-1-2027                          Columbus, OH                      MBE

HDR Engineering, Inc.                                         CC008851                                                  2-19-2028                          Columbus, OH                     MAJ

Stantec Consulting Services, Inc.       CC000462                                                   7-1-2027                          Columbus, OH                     MAJ

AECOM Technical Services, Inc.     CC010897                               5-26-2028      Columbus, OH                       MAJ

American Structurepoint, Inc.                            CC007019                                                  6-10-2027      Columbus, OH                        MAJ

GAI Consultants, Inc.                                                 CC046598                                                  9-16-2027                          Columbus, OH                      MAJ

 

Note: This RFP included 3 projects, and the top 3 ranked firms were selected for these projects. All proposals were deemed responsive. The evaluation committee reviewed the proposals and recommended the contract for the Oakland Park Avenue Area Water Line Improvements project to be awarded to Stantec Consulting Services, Inc.

 

4.  CONTRACT COMPLIANCE INFORMATION

Stantec Consulting Services, Inc.’s contract compliance number is CC000462 and expires 7/1/2027. 

 

As part of their proposal, Stantec Consulting Services, Inc., has proposed the following subconsultants to perform contract work:

 

Name                                                      Contract Compliance                     Exp. Date         City/State         Status

Garcia Surveyors, Inc.                                                                           CC020187                                                 8/19/2027                     Columbus, OH                      MBE

DHDC Engineering Consulting Services, Inc.                     CC006280                                           4/21/2028                     Columbus, OH   MBE

 

The certifications of Stantec Consulting Services, Inc. and all subconsultants, were in good standing at the time the bid was awarded.

 

5.  FISCAL IMPACT

Funding for the construction contract will be obtained through the Ohio Water Development Authority (OWDA) Direct Loan Program. City Council authorized this loan application and acceptance of loan funding via Ordinance 0341-2026, passed by Council on 3/2/2026. Ordinance 0341-2026 also authorized the Director of Columbus Water & Power to add or to subtract from the anticipated loans listed in that ordinance. 690236-100185 was listed in that ordinance without a project name. Even though Ordinance 0341-2026 stated projects can be added to or subtracted from the list without further City Council approval, OWDA requires an ordinance specifically listing Council’s approval for each project. This ordinance will request that approval. This loan is expected to be approved at the OWDA January 2027 Board meeting. This ordinance is contingent upon the OWDA Board approving the loan application.  Columbus Water & Power will inform the Auditor’s Office when this loan is approved.

The OWDA Direct Loan Program is a reimbursement program. Purchase orders will need to be established to Stantec Consulting Services, Inc. for this contract. Columbus Water & Power will need to pay invoices directly to Stantec Consulting Services, Inc. and then submit reimbursement requests based upon these paid invoices to OWDA for OWDA to reimburse Columbus Water & Power.  

Funds will need to be appropriated in the Water - Fresh Water Market Rate Fund, Fund 6014.

 

Title

To authorize the Director of Columbus Water & Power to enter into a professional services contract with Stantec Consulting Services, Inc. for the Oakland Park Avenue Area Water Line Improvements project; to authorize the Director of Columbus Water & Power to apply for and accept a loan from the Ohio Water Development Authority Direct Loan Program for the Oakland Park Avenue Area Water Line Improvements project; to make this ordinance contingent upon approval of a loan from the Ohio Water Development Authority; to appropriate funds within the Water - Fresh Water Market Rate Fund; and to authorize the expenditure of up to $479,045.10 from the Water - Fresh Water Market Rate Fund. ($479,045.10)

 

Body

WHEREAS, Columbus Water & Power is engaged in the Oakland Park Avenue Area Water Line Improvements project; and

 

WHEREAS, six proposals for the Oakland Park Avenue Area Water Line Improvements project were received and opened on August 28, 2026; and

 

WHEREAS, the evaluation committee recommended Stantec Consulting Services, Inc. be awarded the contract for this project; and

 

WHEREAS, Ordinance 0341-2026 authorized this contract to be funded by a loan to be obtained through the Ohio Water Development Authority Direct Loan Program; and

 

WHEREAS, the Oakland Park Avenue Area Water Line Improvements Project was not specifically listed as a project to be loan funded on Ordinance 0341-2026 and this ordinance will ask for authorization to loan fund it; and

 

WHEREAS, a loan application has been submitted to OWDA to finance this project; and

 

WHEREAS, the loan is scheduled to be approved by the Ohio Water Development Authority Board at their January 2027 Board meeting; and

 

WHEREAS, this ordinance is contingent upon the loan being approved; and

 

WHEREAS, it is necessary to appropriate funds in the Water - Fresh Water Market Rate Fund, Fund 6014; and

 

WHEREAS, it is necessary to expend funds from the Water - Fresh Water Market Rate Fund, Fund 6014, to pay for the services Stantec Consulting Services, Inc. provides under this contract; and

 

WHEREAS, it has become necessary in the usual daily operation of Columbus Water & Power to authorize the Director to enter into a professional services contract with Stantec Consulting Services, Inc. for the Oakland Park Avenue Area Water Line Improvements project; NOW THEREFORE,

 

BE IT ORDAINED BY THE COUNCIL OF THE CITY OF COLUMBUS:

 

SECTION 1.  That City Council authorizes the Director of Columbus Water & Power to submit loan applications and accept loan funding for the Oakland Park Avenue Area Water Line Improvements project, and this ordinance is contingent upon that loan being approved.

 

SECTION 2.  That the appropriation of $479,045.10, or so much thereof as may be needed, is hereby authorized in the Water - Fresh Water Market Rate Fund, Fund 6014, per the accounting codes in the attachment to this ordinance.

 

SECTION 3.  That the Director of Columbus Water & Power be and hereby is authorized to enter into a contract for professional engineering services for the Oakland Park Avenue Area Water Line Improvements project, CIP 690236-100185, with Stantec Consulting Services, Inc., 1500 Lake Shore Dr., Suite 100 Columbus, Ohio 43204; in accordance with the terms and conditions of the contract on file at Columbus Water & Power.

 

SECTION 4.  That the expenditure of $479,045.10, or so much thereof as may be needed, is hereby authorized to pay for this contract per the accounting codes in the attachment to this ordinance.

 

SECTION 5.  Funds are hereby deemed appropriated and expenditures and transfers authorized to carry out the purposes of this ordinance and the City Auditor shall establish such accounting codes as necessary.

 

SECTION 6.  That the City Auditor is authorized to make any accounting changes to revise the funding source for all contracts or contract modifications associated with this ordinance.

 

SECTION 7.  That the City Auditor is authorized to transfer the unencumbered balance in a project account to the unallocated balance account within the same fund upon receipt of certification by the Director of the Department administering said project that the project has been completed and the monies are no longer required for said project.

SECTION 8.  That this ordinance shall take effect and be in force from and after the earliest period allowed by law.