Title: To authorize the Director of Public Utilities to modify the contract with ms consultants, inc., for Professional Engineering Services for the Hap Cremean Water Plant Lagoons Nos. 1, 2, and 3 Sludge Removal, for the Division of Water, and to authorize the expenditure of $850,556.01 from Waterworks Enlargement Voted 1991 Bonds Fund, and to declare an emergency. ($850,556.01)
Attachments: 1. HCWP_VicMap.pdf, 2. Information to be included in Contracting Legislation 05-046.pdf, 3. lagoon_mods_scope-061005.pdf, 4. Cost By Task.pdf, 5. RFP Evaluation.pdf, 6. mod cost by task.pdf
Date Ver.Action ByActionResultAction DetailsMeeting Details
7/14/20051 ACTING CITY CLERK Attest  Action details Meeting details
7/13/20051 MAYOR Signed  Action details Meeting details
7/11/20051 Columbus City Council ApprovedPass Action details Meeting details
7/11/20051 COUNCIL PRESIDENT Signed  Action details Meeting details
6/22/20051 Utilities Drafter Sent to Clerk's Office for Council  Action details Meeting details
6/21/20051 Utilities Drafter Sent for Approval  Action details Meeting details
6/21/20051 Auditor Reviewer Reviewed and Approved  Action details Meeting details
6/21/20051 CITY AUDITOR Reviewed and Approved  Action details Meeting details
6/21/20051 Utilities Drafter Sent for Approval  Action details Meeting details
6/21/20051 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
6/20/20051 Finance Reviewer Reviewed and Approved  Action details Meeting details
6/20/20051 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
6/14/20051 EBOCO Reviewer Reviewed and Approved  Action details Meeting details
6/14/20051 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
6/14/20051 Utilities Drafter Sent for Approval  Action details Meeting details
6/13/20051 Utilities Drafter Sent for Approval  Action details Meeting details
6/13/20051 Utilities Reviewer Reviewed and Approved  Action details Meeting details
6/13/20051 Utilities Drafter Sent for Approval  Action details Meeting details
6/13/20051 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
6/13/20051 Utilities Drafter Sent for Approval  Action details Meeting details
Explanation
 
BACKGROUND:  :  Residual production, transportation and disposal of sludge is a continual part of the water treatment process. The lime softening sludge lagoons at the Hap Cremean Water Plant are necessary to provide storage for emergency situations, such as loss of pumping capabilities, and to allow for maintenance of basins and pumping equipment.  At the start of this project, all three (3) lagoons were filled to capacity.  Consequently, the integrity of the embankments around the lagoons had been compromised. This contract provides professional engineering services for geotechnical evaluation of the embankments, and for the design and preparation of contract documents for the physical removal of the sludge and improvements to the embankments.  The original contract provided for engineering design for the first two phases of the sludge removal, construction administration services for the first phase of sludge removal, and geotechnical investigations.  The construction work for the first phase of sludge removal has been substantially completed and the construction work for the second phase of sludge removal has been bid.  This contract modification will provide for construction administration services for the second phase of sludge removal, engineering design and construction administration services for the third phase of the work which consists of embankment stabilization and earthen internal baffle construction, and additional geotechnical investigations.  
 
CC  329.16 CONTRACT MODIFICATIONS:
1.      Amount of additional funds to be expended under this modification: $850,556.01  
2.      The services identified to be included in this contract modification were identified in the original contract however costs for these services were not identified at that time.  It was not possible to accurately estimate the costs to perform these tasks until the first phase of the work was completed.         
3.      The work under this contract modification is a continuation of work previously performed by the Consultant; therefore, no other processes were used for procurement of these services.
4.      The cost of this modification is based on material and labor, and was negotiated between the Consultant and the City, as documented by the Consultant's quotation letters, and verified by the Project Engineer.
 
CONTRACT AMOUNT:
Original contract amount                        $387,743.74
Modification No.1                           $850,556.01
New contract amount                        $1,238,299.75
 
FISCAL IMPACT:  The original authorization for expenditures for this project occurred June 2, 2003 in the amount of $387,743.74.  $3,460,784.00 was budgeted in the 2004 C.I.B. and the project is being funded from current monies.
 
EMERGENCY:  Emergency legislation is being requested so that the Construction Administration can proceed concurrently with the second phase of construction.  The second phase of construction has been bid and is currently in the legislation approval process as proposed Ordinance No. 1022-2005.
 
CONTRACT COMPLIANCE NUMBER: 34-6546916
 
Title
 
To authorize the Director of Public Utilities to modify the contract with ms consultants, inc., for Professional Engineering Services for the Hap Cremean Water Plant Lagoons Nos. 1, 2, and 3 Sludge Removal, for the Division of Water, and to authorize the expenditure of $850,556.01 from Waterworks Enlargement Voted 1991 Bonds Fund, and to declare an emergency. ($850,556.01)
 
Body
 
WHEREAS: Contract No. EL-003473 was authorized by Ordinance No. 0825-03,  passed June 2, 2003, was executed June 18, 2003 and approved by the City Attorney on June 27, 2003, to provide for engineering design services for the Hap Cremean Water Plant Lagoons Nos. 1, 2, and 3 Sludge Removal, and
 
WHEREAS, The original contract provided for engineering and construction work to be performed in three phases and anticipated the original contract would be modified to cover engineering services for additional phases of work, and
 
WHEREAS, The construction work for the first phase of sludge removal has been substantially completed and the construction work for the second phase of sludge removal has been bid.  This contract modification will provide for construction administration services for the second phase of sludge removal, engineering design  and construction administration services for the third phase of the work which consists of embankment stabilization and earthen internal baffle construction and additional geotechnical investigations, and
 
WHEREAS: This modification provides for an increase of $850,556.01 to this contract, and
 
WHEREAS, an emergency exists in the usual daily operations of the Division of Water, Department of Public Utilities in that it is immediately necessary to authorize the Director of Public Utilities to modify Contract No. EL-003473, for the Hap Cremean Water Plant Lagoon No. 1  Sludge Removal and Lagoon Modifications, for the Division of Water, so that the Construction Administration can proceed concurrently with the second phase of construction, and so as to allow the financial transaction to be posted in the City's accounting system as soon as possible, and for the immediate preservation of public health, peace, property and safety, now, therefore;
 
BE IT ORDAINED BY THE COUNCIL OF THE CITY OF COLUMBUS
 
Section 1. That the Director of Public Utilities be and is hereby authorized to modify Contract No EL-003473 with ms consultants, inc. in the amount of $850,556.01 for Professional Engineering Services necessary for Hap Cremean Water Plant  Lagoons Nos. 1, 2, and 3 Sludge Removal for the Division of Water, Department of Public Utilities, Project No. 690331, Contract No. 1030, terms and conditions of which are on file in the office of the Division of Water.
 
Section 2. That for the purpose of paying the cost thereof, the expenditure of $850,556.01  is hereby authorized from Waterworks Enlargement Voted 1991 Bonds, Fund No. 606, Department of Public Utilities, Division of Water, Dept./Division No. 60-09, Object Level Three 6682, Project No. 690331, OCA Code 606331.
 
Section 3. That the City Auditor is hereby authorized to transfer the unencumbered balance in a project account to the unallocated balance account within the same fund upon receipt of certification by the Director of the Department administering said project; that the project has been completed and the monies are no longer required for said project except that no transfer shall be so made from a project account funded by monies from more than one source.
 
Section 4.  The City Auditor is hereby authorized and directed to transfer funds from within the Waterworks Enlargement Voted 1991 Bonds Fund, Fund No. 606, Department of Public Utilities, Division of Water, as follows:
 
FROM:            690379      DRWP Chlorine Storage Improvements            $850,556.01
                              OCA Code 642900
 
 
TO:            690331      HCWP Lagoons Nos. 1, 2, and 3 Sludge Removal      $850,556.01
                              OCA Code 606331
 
Section 5.  That Section  1, Public Utilities/Water 60-09 or Ordinance 1059-2004 is hereby amended as follows:
 
      PROJECT                                                      TOTAL
NUMBER                  PROJECT NAME                        BUDGET
 
      690331      HCWP Lagoons Nos. 1, 2, and 3 Sludge Removal            $850,556       *(1)*
 
      690379      DRWP Chlorine Storage Improvements                  $850,556      *(2)*
 
Section 6.  That for reasons stated in the preamble, hereto, which is hereby made a part hereof, this ordinance is declared to be an emergency measure and shall take effect and be in force from and after its passage and approval by the Mayor, or ten days after approval if the Mayor neither approves nor vetoes the same.
 
      2004 Original Budget                  2004 Amended Budget            Comments
 
*(1)*      $3,460,784                        $4,311,340                  Authority Increased
*(2)*      $4,933,518                        $4,082,962                  Authority Reduced