File #: 3157-2026    Version: 1
Type: Ordinance Status: Consent
File created: 11/4/2026 In control: Public Service & Transportation Committee
On agenda: 11/23/2026 Final action:
Title: To authorize the Director of Public Service to enter into a contract modification with Evans, Mechwart, Hambleton & Tilton, Inc. in connection with the Signals - General Engineering 2025 project; to authorize the expenditure of up to $150,000.00 from the Street Construction Maintenance and Repair Fund for the project; and to declare an emergency. ($150,000.00)
Attachments: 1. Acct Temp 3157-2026, 2. SoS EMHT
Date Ver.Action ByActionResultAction DetailsMeeting Details
No records to display.

Explanation

1.  BACKGROUND

This ordinance authorizes the Director of Public Service to modify a professional services contract with Evans, Mechwart, Hambleton & Tilton, Inc. (EMH&T), for the Signals - General Engineering 2025 contract to add funds in the amount of $150,000.00 for payment of services.

 

Ordinance 1645-2025 authorized the Director of Public Service to enter into a professional services contract, in the amount of $500,000.00, for the additional resources that are necessary to perform various professional engineering, survey, and technical expertise for the department to complete capital budget commitments, including traffic signal facilities design and associated tasks for the Department.

 

This modification is necessary to update and complete the design process for replacing one traffic signal at the corner of North 4th Street and Chittenden Avenue.  Several ongoing projects are currently upgrading the traffic signals along the North 4th Street corridor.  Adding the work requested in this modification will allow for the replacement of one of the remaining signalized intersections with obsolete poles, unaddressed in other projects, and provide the opportunity to upgrade safety measures for the intersection. It will be more cost-efficient to modify the existing contract than to bid this part of the work. 

 

1.1  Amount of additional funds to be expended: $150,000.00

The original contract amount:                                                                  $500,000.00                     (PO527169, Ord. 1645-2025)

The total of modification 4:                                                                  $150,000.00                     (This Ordinance)

 

The contract amount including all modifications:   $650,000.00

 

1.2  Reasons additional goods/services could not be foreseen: 

Additional services are required to extend construction plan development to this adjacent intersection within the Near North/University Community corridor. Incorporating this location allows the project to systematically replace obsolete signal infrastructure and implement modern safety upgrades using a vendor already mobilized and experienced in this specific area.

 

1.3  Reason other procurement processes are not used:

The design needs to begin immediately to be able to update infrastructure to accompany the new bicycle facilities along the N. 4th St. corridor to go to construction in 2028 with a knowledgeable, experienced, fiscally responsible vendor.  Advertising and obtaining a new contract would delay construction to 2029 or beyond.

 

1.4  How cost of modification was determined:

The cost was determined based on the remaining unallocated funds on the original contract and fee proposal for the vendor to prepare the construction plans.

 

2. CONTRACT COMPLIANCE

Evans, Mechwart, Hambleton & Tilton, Inc.’s contract compliance number is CC004214 and expires 10/17/2027.

 

3. FISCAL IMPACT:

Funding for this contract is budgeted, available and appropriated within Fund 2265, the Street Construction Maintenance and Repair Fund.

 

4. EMERGENCY DESIGNATION

Emergency action is requested to ensure funds are encumbered in the year for which they were budgeted.                     

 

Title

To authorize the Director of Public Service to enter into a contract modification with Evans, Mechwart, Hambleton & Tilton, Inc. in connection with the Signals - General Engineering 2025 project; to authorize the expenditure of up to $150,000.00 from the Street Construction Maintenance and Repair Fund for the project; and to declare an emergency. ($150,000.00)

 

Body

WHEREAS, contract no. PO527169 with Evans, Mechwart, Hambleton & Tilton, Inc., in the amount of $500,000.00, was authorized by ordinance no. 1645-2025; and

 

WHEREAS, it has become necessary to modify the contract in an amount up to $150,000.00 and provide additional funds for the Signals - General Engineering 2025 project; and

 

WHEREAS, it is necessary to authorize an expenditure of up to $150,000.00 from the Street Construction Maintenance and Repair Fund for this contract; and

 

WHEREAS, an emergency exists in the usual daily operation of the Department of Public Service in that it is immediately necessary to enter into a contract modification with Evans, Mechwart, Hambleton & Tilton, Inc. to prevent delays in future construction project schedules, to ensure funds are encumbered in the year for which they were budgeted and to preserve the safety of the traveling public, all for the immediate preservation of the public health, peace, property, safety, and welfare; and now, therefore

 

BE IT ORDAINED BY THE COUNCIL OF THE CITY OF COLUMBUS:

 

SECTION 1.  That the Director of Public Service be, and hereby is, authorized to enter into a contract modification with Evans, Mechwart, Hambleton & Tilton, Inc., 5500 New Albany Road, Columbus, Ohio 43054, for the Signals - General Engineering 2025 project in the amount of $150,000.00, or so much thereof as may be needed, in accordance with the plans and specifications on file in the Department of Public Service, which are hereby approved.

SECTION 2.  That the expenditure of $150,000.00, or so much thereof as may be needed, is hereby authorized in Fund 2265 (Street Construction Maintenance and Repair Fund), Dept-Div 5913 (Traffic Management), in Object Class 06 (Capital Outlay) per the accounting codes in the attachment to this ordinance.

 

SECTION 3.  Funds are hereby deemed appropriated and expenditures and transfers authorized to carry out the purposes of this ordinance and the City Auditor shall establish such accounting codes as necessary.

 

SECTION 4.  That the City Auditor is authorized to make any accounting changes to revise the funding source for all contracts or contract modifications associated with this ordinance.

 

SECTION 5.  That the City Auditor is hereby authorized to transfer the unencumbered balance in a project account to the unallocated balance account within the same fund upon receipt of certification by the Director of the Department administering said project that the project has been completed and the monies are no longer required for said project.

 

SECTION 6.  That for the reasons stated in the preamble hereto, which is hereby made a part hereof, this ordinance is hereby declared to be an emergency measure and shall take effect and be in force from and after its passage and approval by the Mayor or ten days after passage if the Mayor neither approves nor vetoes the same.