header-left
File #: 0733-2009    Version: 1
Type: Ordinance Status: Passed
File created: 5/12/2009 In control: Health, Housing & Human Services Committee
On agenda: 6/1/2009 Final action: 6/3/2009
Title: To authorize the Finance and Management Director to modify a contract on behalf of the Facilities Management Division with General Maintenance and Engineering Company for roof repairs at the Columbus Health Department, 240 Parsons Avenue; to authorize the expenditure of $6,693.00 from the Health General Obligation Bonds Fund; and to declare an emergency. ($6,693.00)
Date Ver.Action ByActionResultAction DetailsMeeting Details
6/3/20091 MAYOR Signed  Action details Meeting details
6/3/20091 CITY CLERK Attest  Action details Meeting details
6/1/20091 Columbus City Council ApprovedPass Action details Meeting details
6/1/20091 COUNCIL PRESIDENT Signed  Action details Meeting details
5/18/20091 Finance Drafter Sent for Approval  Action details Meeting details
5/18/20091 Auditor Reviewer Reviewed and Approved  Action details Meeting details
5/18/20091 CITY AUDITOR Reviewed and Approved  Action details Meeting details
5/18/20091 Finance Drafter Sent for Approval  Action details Meeting details
5/18/20091 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
5/18/20091 Finance Drafter Sent to Clerk's Office for Council  Action details Meeting details
5/15/20091 EBOCO Reviewer Sent for Approval  Action details Meeting details
5/15/20091 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
5/14/20091 Finance Drafter Sent for Approval  Action details Meeting details
5/14/20091 Finance Reviewer Reviewed and Approved  Action details Meeting details
5/14/20091 Finance Reviewer Reviewed and Approved  Action details Meeting details
5/14/20091 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
5/14/20091 Finance Drafter Sent for Approval  Action details Meeting details
5/13/20091 HEALTH DIRECTOR Reviewed and Approved  Action details Meeting details
5/12/20091 Finance Drafter Sent for Approval  Action details Meeting details
5/12/20091 Finance Reviewer Reviewed and Approved  Action details Meeting details
5/12/20091 Finance Drafter Sent for Approval  Action details Meeting details
5/12/20091 Finance Drafter Sent for Approval  Action details Meeting details
5/12/20091 Finance Drafter Sent for Approval  Action details Meeting details
Explanation
 
BACKGROUND:  This ordinance authorizes the Finance and Management Director to modify a contract on behalf of the Facilities Management Division with General Maintenance and Engineering Company for roof repairs at the Columbus Health Department, 240 Parsons Avenue.  Ordinance No. 0122-2009, passed February 2, 2009, authorized the renovation of the roof at the Columbus Health Department.  The original contract was formally bid (SO025748).  The term of the contract is September 1, 2008 through August 31, 2009.  The contract was bid with three renewal options.
 
This modification will authorize repairs to the North Dorm roof and the breezeway roof. The work shall include, but is not limited to, tuckpointing and caulking on the south side of the north wing, preparation for the new drain line, installation of a new roof drain in the breezeway roof, installation of a new 2" PVC drain line, replacement of missing roof tile, a metal ridge cap and clean up.  These repairs are necessary in order to eliminate leaks occurring throughout the facility. Failure to make these necessary repairs will cause permanent structural damage to the building, necessitating more expensive repairs.
 
EMERGENCY ACTION is requested to repair the roof and to prevent further structural damage.
 
FISCAL IMPACT:  The total amount of this request is $6,693.00.  Funding is available in the Health General Obligation Bonds Fund.
 
General Maintenance and Engineering Company, Contract Compliance #31-4188545, Expiration date March 19, 2010.  
 
Title
 
To authorize the Finance and Management Director to modify a contract on behalf of the Facilities Management Division with General Maintenance and Engineering Company for roof repairs at the Columbus Health Department, 240 Parsons Avenue; to authorize the expenditure of $6,693.00 from the Health General Obligation Bonds Fund; and to declare an emergency.  ($6,693.00)
 
Body
 
WHEREAS, the Facilities Management Division has a contract for roof maintenance at various City-owned facilities; and
 
WHEREAS, Bid SO025748 was awarded to General Maintenance and Engineering Company in 2006; and
 
WHEREAS, it is necessary to modify the existing contract with General Maintenance and Engineering Company to repair the roof and to prevent further structural damage at the Columbus Health Department, 240 Parsons Avenue; and
 
WHEREAS, an emergency exists in the usual daily operation of the Columbus Health Department in that it is immediately necessary to enter into a contract with General Maintenance and Engineering Company for the immediate preservation of the public health, peace, property, safety and welfare; now, therefore,
 
BE IT ORDAINED BY THE COUNCIL OF THE CITY OF COLUMBUS:
 
SECTION 1.  That the Finance and Management Director is hereby authorized to modify a contract with General Maintenance and Engineering Company for roof repairs at the Columbus Health Department, 240 Parsons Avenue.
 
SECTION 2.  That the expenditure of $6,693.00, or so much thereof that may be necessary in regard to the action authorized in SECTION 1, be and is hereby authorized and approved as follows:
 
Division:  50-01
Fund:  706
Project:  570053
OCA:  501713
Object Level 1:  06
Object Level 3:  6620
Amount:  $6,693.00
 
SECTION 3.  That the City Auditor is authorized to make any accounting changes to revise the funding source for all contracts or contract modifications associated with this ordinance.
 
SECTION 4.  That for reasons stated in the preamble hereto, which is hereby made a part thereof, this ordinance is hereby declared an emergency measure and shall take effect and be in force from and after its passage and approval by the Mayor, or ten days after passage if the Mayor neither approves nor vetoes the same.