File #: 1867-2024    Version: 1
Type: Ordinance Status: Consent
File created: 6/21/2024 In control: Public Utilities & Sustainability Committee
On agenda: 7/22/2024 Final action:
Title: To authorize the Director of the Department of Public Utilities to enter into a construction contract with Ironsite, Inc. for the Livingston Noe Bixby Culvert Removal project; to authorize the transfer of cash and appropriation between projects within the Storm Bond Fund; to authorize the expenditure of up to $361,139.98 from the Storm Bond Fund for the project. ($361,139.98)
Indexes: MBE Participation, WBE Participation
Attachments: 1. Ord. 1867-2024 Utilization Form, 2. ORD 1867-2024 Accounting Template
Explanation
1. BACKGROUND
This ordinance authorizes the Director of Public Utilities to enter into a construction contract via the City’s Invitation For Bid process with Ironsite, Inc. for the Livingston Noe Bixby Culvert Removal project, CIP #611724-100000, in an amount up to $359,139.98 and to encumber funds with the Department of Public Service for prevailing wage services in an amount up to $2,000.00, for a total expenditure of $361,139.98.

This project will improve the safety of an abandoned roadway in which the aging and failing culvert was not previously removed. The culvert is currently unstable and eroding the sub-surface soil adjacent to the culvert due to formation of a significant hole in the culvert’s sidewall. The project will stabilize the area and prevent further soil erosion from entering a tributary to Big Walnut Creek. The structural stability of daylighting this channel will prevent collapse of the culvert in the event any persons should attempt to walk over or through the failing structure.

Work to be performed includes clearing and grubbing while taking considerations to protect specified trees; excavation and demolition of an existing 72-inch by 110-inch stone box culvert which has been observed to have an approximately 5-foot deep hole through its side where soil has eroded; regarding of a dirt channel and side slopes without disturbing the sanitary sewer line below the existing culvert; placing topsoil and re-establishing cover with seeding and mulching; planting 31 trees; and adding erosion control matting.

The Community Area is "58 - Far East".

TIMELINE: Contract work is required to be completed in a manner acceptable to the City within 180 days from the date that a Notice to Proceed (NTP) is given by the City.

ESTIMATED COST OF PROJECT: The bid amount and proposed award amount is $359,139.98, including a 15% construction contingency amount that will be utilized to fund needed and approved changes in the work. No contract ...

Click here for full text