Explanation
1. BACKGROUND
This ordinance authorizes the Director of Public Service to enter into contract with Dugan & Meyers, LLC for the Misc Econ Dev - Confluence Village Garage project and to provide payment for construction, construction administration and inspection services.
This project consists of construction of a new parking garage in the Astor Park area, located off Columbus Crew Way, opposite the new Lower.com Field. The parking garage will include 677 spaces and will serve residents, workers, and visitors to the Astor Park area. There will be two entrances with a total of 5 lanes for entry and exit, located at the northeast and southwest corners. The garage will be 5 stories with 3 parking bays and center bay ramping. The garage will include openings for direct connection to the adjacent residential buildings, constructed under a separate contract. Garage utilities will include underground stormwater detention, electrical for lighting and electric vehicle charging, and a sanitary service. Fire protection will include a remote Fire Department Connection, located along the north side of the proposed Cahill Drive. Construction will include concrete crash walls, perforated metal exterior, tension mesh exterior, and glass vertical circulator with dual elevators in the southeast corner, and other work as may be necessary to complete the contract in accordance with the plans and specifications set forth in the Bid Submittal Documents.
The estimated Notice to Proceed date is October 25, 2021. The project was let by the Office of Support Services through Vendor Services and Bid Express. Four bids were received on September 9, 2021, (all majority) and tabulated as follows:
Company Name Bid Amount City/State Majority/MBE/FBE
Dugan & Meyers LLC $20,977,000.00 Cincinnati, OH MAJ
cps construction group, inc $21,878,800.00 Cranberry Township, PA MAJ
Elford, Inc. $21,945,000.00 Columbus, OH MAJ
...
Click here for full text