File #: 1847-2024    Version: 1
Type: Ordinance Status: Second Reading
File created: 6/18/2024 In control: Public Utilities & Sustainability Committee
On agenda: 7/22/2024 Final action:
Title: To authorize the Director of the Department of Public Utilities to enter into a professional engineering services contract with CDM Smith Inc., for the Water Reuse Study Project; to authorize a transfer of cash and appropriation between projects within the Water Bond Fund; and to authorize an expenditure of $1,959,242.00 from the Water Bond Fund. ($1,959,242.00)
Indexes: MBE Participation, WBE Participation
Attachments: 1. Ord 1847-2024 Accounting Template, 2. ORD 1847-2024Utilization Reporting Form_2024-06-04
Explanation
1. BACKGROUND
This ordinance authorizes the Director of Public Utilities to enter into a professional engineering services contract awarded through the City’s Request for Proposal process with CDM Smith, for the Water Reuse Study Project, CIP #691800-100001, in an amount up to $1,959,242.00 for the Division of Water.

The population of the Central Ohio area is expected to grow by more than 700,000 people within the next 25 years, which will increase demand on the City of Columbus’s potable water supply system. To help the City meet these increased potable water demands, the Department of Public Utilities (DPU) is evaluating the non-potable water reuse to supply water to existing and future industrial/commercial users, which in turn will reduce the demand on the potable water supply system. Examples of industrial/commercial users include data centers, industrial cooling, irrigation, and manufacturing. The design professional shall perform studies and produce technical memoranda related to Non-Potable Reuse that provides the explanation necessary to understand the existing conditions, establish design criteria, identify and evaluate possible alternatives, and recommend a conceptual implementation approach.
The Community Planning Area is “99-Citywide”

TIMELINE & FUTURE MODIFICATION(S):
The Notice to Proceed is anticipated to occur in the third quarter of 2024. The Draft Study Report is due 12 months after the Notice to Proceed and the Final Study Report is anticipated 4 months after the Draft Report is accepted.

ESTIMATED COST OF PROJECT:
The amount of the initial contract and anticipated future contract modifications is listed below

Cost summary:
Initial Contract (current) $ 1,959,242.00
CONTRACT TOTAL $ 1,959,242.00

2. ECONOMIC IMPACT/ADVANTAGES; COMMUNITY OUTREACH; PROJECT DEVELOPMENT; ENVIRONMENTAL FACTORS/ADVANTAGES OF PROJECT
The use of non-potable water to supply water to existing and future industrial/commercial users ...