Title: To authorize the Director of the Public Utilities Department to enter into a professional services contract with EMH&T for the Circuit 79 Street Lighting Improvements project; to authorize an amendment to the 2023 Capital Improvement Budget; to authorize the transfer of cash and appropriation between projects within the Electricity Bond Fund; and to authorize an expenditure of up to $127,961.81 from the Electricity Bond Fund. ($127,961.81)
Indexes: MBE Participation
Attachments: 1. ORD 0077-2024 Accounting Form, 2. ORD 0077-2024 Utilization Form
Explanation
1. BACKGROUND
This ordinance authorizes the Director of Public Utilities to enter into a contract with EMH&T Incorporated (EMH&T), for professional services for the design of the Circuit 79 Street Lighting Improvements project, CIP #670897-100000, in an amount up to $127,961.81.

This project consists of a new design to completely replace all streetlight material for approximately 46 lights on Circuit 079 including: poles, luminaires, cable, conduit, pull boxes, and other associated material as required. The existing lights are underground poles but subject to frequent maintenance and failure. The intent is to completely remove all existing Circuit 079 materials and install a new underground 3-wire streetlight circuit utilizing post top poles and LED luminaires. The design process will develop a new street lighting circuit layout based on the measurement of light intensity using current Division of Power specifications. The upgrade to LED lighting is more energy efficient and will result in an energy consumption savings for the City of Columbus.

The Community Area is 57 - Near East, with work occurring on streets south of I-670 and east of Saint Clair Avenue.

TIMELINE: Assuming approval of contract legislation by January 29, 2024, the Notice To Proceed (NTP) would be issued around March 11, 2024 based on typical project schedules and timelines.

ESTIMATED COST OF PROJECT: The bid amount and proposed award amount is $127,961.81, including a 10% design contingency amount that will be utilized to fund needed and approved changes in the work. No contract modifications are anticipated at this time.

Original Contract $ 127,961.81
Future Anticipated Needs $ 0.00
CONTRACT TOTAL $ 127,961.81

2. ECONOMIC IMPACT/ADVANTAGES; COMMUNITY OUTREACH; PROJECT DEVELOPMENT; ENVIRONMENTAL FACTORS/ADVANTAGES OF PROJECT
The project will design the replacement of existing street lighting material on exi...