A. Background: This legislation authorizes the Director of Public Utilities to enter into a engineering agreement with the Stantec Consulting Services, Inc., for Construction Administration / Inspection Services in connection with the Combined Sewer Overflow (CSO) Regulator Sluice Gate Modifications Project. This project will address restrictions in the existing combined sewer system in preparation of the OSIS Augmentation and Relief Sewer (OARS) and reduces the Sanitary Sewer Overflows (SSO) from DSR-83. This project is being performed as part of the City's OEPA approved Combined Sewer Long Term Control Plan - Interim (2010) Plan Update, dated March 7, 2008. The existing sluice gates at 15 CSO regulators (Hudson, Doe, Frambes, Indianola, King, Third, First, Henry, Chestnut, Spring, Long, Broad, Liberty, Whittier, and Moler) will be removed and the orifices at 4 regulators (Broad, Long, Chestnut and Henry) will be enlarged in order to increase flow to the wastewater treatment plants. In addition, the weir at DSR-83 will be raised approximately 2.84 ft., the sludge manhole at the Whittier Street Storm Tanks will be raised 2.75 ft. and backflow prevention will be installed at manholes in order to reduce overflows and increase the in-line storage upstream . Construction work must be completed within 365 days of the Notice to Proceed.
Stantec will provide Construction Administration/Inspection Services for CIP 650737 - CSO Regulator Sluice Gate Modifications. The detailed scope of work includes both engineering and inspection services during construction as defined u in Request for Proposals for Professional Engineering Services - Construction Administration Services 2011-2013.
The work to be performed under CIP 650737 consists of various elements involved in the modification of fifteen (15) existing combined sewer overflows located in various regulator structures in the Ohio State University Campus and Downtown Columbus area, modification o...
Click here for full text