header-left
File #: 0875-2012    Version: 1
Type: Ordinance Status: Passed
File created: 4/16/2012 In control: Recreation & Parks Committee
On agenda: 4/30/2012 Final action: 5/2/2012
Title: To authorize and direct the Director of Recreation and Parks to enter into contract with Jones Stuckey LTD, Inc. for professional services related to the Alum Creek Trail - Airport Drive and Easton Extension Design; to authorize the expenditure of $398,360.00 and a contingency of $16,296.00 for a total of $413,156.00 from the Voted Recreation and Parks Bond Fund; and to declare an emergency. ($413,156.00)
Explanation
Background:
Proposals were received by the Recreation and Parks Department on March 2, 2012 for the Alum Creek Trail - Airport Drive & Easton Extension Design as follows:
Status
Jones Stuckey MAJ
CEC MAJ
DLZ MBE
Floyd Browne MAJ
Korda MAJ
Leslie Thompson MBE
Michael Baker MAJ
RW Armstrong MAJ
Shaffer Pomeroy MAJ
Stantec MAJ

The scope of work shall be to provide complete engineering services to prepare construction plans and specifications for the construction of two separate extensions of a trail along the Alum Creek corridor at Airport Drive and Easton. Plan preparation includes stream crossings, right-of-way, permits, and hydraulic analysis. Firms must demonstrate full qualifications in the following: non-complex roadway design, right-of-way, level 2 bridge design, environmental and cultural resources, soils/geotechnical and other related qualifications.

Principal Parties:
Jones Stuckey LTD, Inc.
David Jones (contact)
2323 W. Fifth Avenue, Suite 160
Columbus, OH 43204
Phone: (614) 486-0401
Contract Compliance #310723296
Contract Compliant through 1/6/13
30+ Columbus Employees

Subcontractors Listed in Proposal:
CTL Engineering (ASN)
Lawhon & Associates (FBE)
Dynotec, Inc. (MBE)


Fiscal Impact: $413,156.00

Title
To authorize and direct the Director of Recreation and Parks to enter into contract with Jones Stuckey LTD, Inc. for professional s...

Click here for full text