File #: 2051-2003    Version: 1
Type: Ordinance Status: Passed
File created: 9/2/2003 In control: Utilities Committee
On agenda: 10/6/2003 Final action: 10/8/2003
Title: To authorize the Finance Director to enter into a contract with Manufacturers Representatives, Inc., for zinc metering pumps with peristaltic tube pumps, for the Division of Water, and to authorize the expenditure of $21,570.00 from Water Systems Operating Fund. ($21,570.00)
Date Ver.Action ByActionResultAction DetailsMeeting Details
10/8/20031 CITY CLERK Attest  Action details Meeting details
10/7/20031 MAYOR Signed  Action details Meeting details
10/6/20031 Columbus City Council ApprovedPass Action details Meeting details
10/6/20031 COUNCIL PRESIDENT Signed  Action details Meeting details
9/29/20031 Columbus City Council Read for the First Time  Action details Meeting details
9/18/20031 Utilities Drafter Sent for Approval  Action details Meeting details
9/18/20031 CITY ATTORNEY Reviewed and ApprovedPass Action details Meeting details
9/18/20031 Utilities Drafter Sent to Clerk's Office for Council  Action details Meeting details
9/17/20031 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
9/17/20031 Utilities Drafter Sent for Approval  Action details Meeting details
9/17/20031 Auditor Reviewer Reviewed and Approved  Action details Meeting details
9/17/20031 CITY AUDITOR Reviewed and Approved  Action details Meeting details
9/16/20031 EBOCO Reviewer Reviewed and Approved  Action details Meeting details
9/15/20031 Utilities Drafter Sent for Approval  Action details Meeting details
9/12/20031 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
9/12/20031 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
9/10/20031 Utilities Drafter Sent for Approval  Action details Meeting details
9/9/20031 Utilities Drafter Sent for Approval  Action details Meeting details
9/8/20031 Utilities Drafter Sent for Approval  Action details Meeting details
9/5/20031 Utilities Drafter Sent for Approval  Action details Meeting details
9/5/20031 Utilities Drafter Sent for Approval  Action details Meeting details
9/2/20031 Utilities Drafter Sent for Approval  Action details Meeting details
Explanation

The Purchasing Office received and opened bid number SA000475BGB for zinc metering pumps with peristaltic tube pumps on July 17, 2003. These pumps are needed by the Hap Cremean Water Plant to meter the zinc we apply in the water treatment process. Only two bids were received and the Purchasing Office deemed them both complete.

The lowest bid was from Ohio Transmission and Pump, however, they do not meet specifications. They bid a pump that does not give the flexibility of using different input ranges and it does not accept any computer RS232 serial inputs with the ability to handle up to 16 pumps on a single communication data highway network. Additionally, the pump has a stainless steel enclosure, which will not resist the corrosive nature of the liquid acid that we will be pumping. Therefore, we are recommending award of this contract go to Manufacturers Representatives, Inc., as the next lowest responsive, responsible, and best bidder to meet specifications, for a total of $21,570.00. The Contract Compliance Number for Manufacturers Representatives, Inc. is 31-1575392. They do not have MBE/FBE status. Two companies of the 64 solicited had MBE/FBE status.

FISCAL IMPACT: The Division of Water allocated $30,000.00 for these pumps in the 2003 Budget. There were no purchases for these types of pumps in the last two years.



Title

To authorize the Finance Director to enter into a contract with Manufacturers Representatives, Inc., for zinc metering pumps with peristaltic tube pumps, for the Division of Water, and to authorize the expenditure of $21,570.00 from Water Systems Operating Fund. ($21,570.00)


Body

WHEREAS, the Purchasing Office did receive and open bid number SA000475BGB for the purchase of zinc metering pumps with peristaltic tube pumps on July 17, 2003, and

WHEREAS, the lowest bidder did not meet our specifications by bidding a pump that does not give the flexibility of using different input ranges,...