File #: 1292-2010    Version: 1
Type: Ordinance Status: Passed
File created: 9/7/2010 In control: Utilities Committee
On agenda: 11/1/2010 Final action: 11/4/2010
Title: To authorize the Director of Public Utilities to enter into a professional engineering services agreement with Stantec Consulting Services Inc., for the Lower Olentangy River Ecosystem Restoration Project (5th Ave. Dam); to transfer within the G.O. Bond Fund for the expenditure of $422,984.34; and to amend the 2010 Capital Improvements Budget, for the Division of Sewerage and Drainage; and to declare an emergency. ($422,984.23)
Attachments: 1. Director's Legislation Information Sheet Contract Mod 2.pdf, 2. Map 650706.pdf, 3. Sub-Contractor WIF 650706-100000 5th Ave. Dam.pdf
Date Ver.Action ByActionResultAction DetailsMeeting Details
11/4/20101 CITY CLERK Attest  Action details Meeting details
11/3/20101 MAYOR Signed  Action details Meeting details
11/1/20101 Columbus City Council ApprovedPass Action details Meeting details
11/1/20101 COUNCIL PRESIDENT Signed  Action details Meeting details
10/19/20101 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
10/19/20101 Utilities Drafter Sent for Approval  Action details Meeting details
10/19/20101 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
10/19/20101 Utilities Drafter Sent to Clerk's Office for Council  Action details Meeting details
10/18/20101 Utilities Drafter Sent for Approval  Action details Meeting details
10/18/20101 EBOCO Reviewer Sent for Approval  Action details Meeting details
10/15/20101 Utilities Drafter Sent for Approval  Action details Meeting details
10/15/20101 Auditor Reviewer Reviewed and Approved  Action details Meeting details
10/15/20101 CITY AUDITOR Reviewed and Approved  Action details Meeting details
10/14/20101 Finance Reviewer Reviewed and Approved  Action details Meeting details
10/14/20101 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
10/13/20101 Finance Reviewer Reviewed and Approved  Action details Meeting details
10/7/20101 Utilities Drafter Sent for Approval  Action details Meeting details
10/6/20101 Utilities Reviewer Sent for Approval  Action details Meeting details
10/6/20101 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
9/20/20101 Utilities Reviewer Sent for Approval  Action details Meeting details
9/20/20101 UTILITIES DIRECTOR Reviewed and Disapproved  Action details Meeting details
9/17/20101 Utilities Drafter Sent for Approval  Action details Meeting details
9/16/20101 Utilities Reviewer Reviewed and Approved  Action details Meeting details
9/16/20101 Utilities Reviewer Reviewed and Approved  Action details Meeting details
9/9/20101 Utilities Drafter Sent for Approval  Action details Meeting details
9/8/20101 Utilities Drafter Sent for Approval  Action details Meeting details
Explanation

1. BACKGROUND: This legislation authorizes the Director of Public Utilities to enter into an agreement with Stantec Consulting Services Inc., in the amount of $422,984.23 for professional engineering services for the Lower Olentangy River Ecosystem Restoration Project (5th Ave. Dam), CIP No, 650706, for the Division of Sewerage and Drainage. This project primarily involves the modification or removal of the 5th Ave. Dam and restoration of 10,560 linear feet of the Olentangy River.

This project includes preliminary engineering (field surveys, structural and floodplain analyses, report, etc.), design engineering (preparation of construction documents, easements, maintenance plan, etc.), and construction inspection services (administration, inspection) for the removal of the Fifth Avenue Dam and construction of in-stream and riparian restoration features along the Olentangy River in the vicinity and upstream of the dam.
Work completed thus far (Phase I), covered by the original contract and contract mod 1, includes field survey, hydrographic survey, geomorphic assessment, sediment sampling and survey, structural analyses, floodplain evaluations, and preparation of a report.

Work to be completed as part of this contract modification (Phase II) includes a mussel survey, which is time sensitive. Additionally it requires preparing detail construction documents, easements, permitting, maintenance plan, etc. Phase III: Contract modification required. It is anticipated the consultant will perform construction administration/inspection services and post project inspection/ maintenance services.

A. Amount of additional funds to be expended: $422,984.23

Original Contract - $200,000.00 (Utilized EPA 319 Grant Funds)
Modification No. 1 - $ 73,460.80 (Utilized EPA 319 Grant Funds)
Current Modification No. 2 - $422,984.23
Future Modifications Phase III - $200,000.00