Explanation
1. BACKGROUND:
A. Need. This legislation authorizes the Director of Public Utilities to enter into a construction contract with The Righter Company for the North West Alum Creek Sanitary Renovations Project for the Division of Sewerage and Drainage. This project was a result of a consent order project as contained in the Wet Weather Management Plan. Work to be completed by this contract consists of the replacement of approximately 24' of 12-inch diameter, 18' of 15-inch diameter and 42' of 20-inch diameter sanitary relief sewer, installation of 1 new manhole, reconstruction of 7 manholes, replacement of 4 flap gates and such other work as may be necessary to complete the contract in accordance with the plans and specifications. The work under this contract shall be completed in a manner acceptable to the City within 90 calendar days after the effective date of the Notice to Proceed.
The contract was advertised in the City Bulletin; seven bids were received, and opened on March 25, 2009 as follows:
Name C.C. No City/State MAJ/MBE/FBE
Walters Excavating 20-4134866 Laurelville, OH Maj
The Righter Company Inc. 31-0889208 Columbus, OH Maj
Complete General Const. 31-4366382 Columbus, OH Maj
John Eramo & Sons 31-0724866 Hilliard, OH Maj
McDaniels Const. Co. 31-1145406 Columbus, OH MBE
Tata Excavating 31-0717926 Columbus, OH Maj
George J. Igel 31-4214570 Columbus, OH Maj
The Engineer's construction cost estimate was $127,056.00
The apparent low bidder, Walters Excavating, was determined to be non-responsive due to missing required documentation. The Righter Company was the second low bidder and therefore the City of Columbus has deferred to the Righter Company as the low bidder.
Award is recommended to the lowest and best bidder.
B. Contract Compliance No.: 31-0889208 (MAJ) (Expires 04/07/2011)
C. Emergency Designation: No emergency designation is requested for t...