File #: 0135-2010    Version: 1
Type: Ordinance Status: Passed
File created: 1/13/2010 In control: Public Service & Transportation Committee
On agenda: 2/8/2010 Final action: 2/10/2010
Title: To authorize the Director of Public Service to enter into agreement with the Director of the Ohio Department of Transportation for 3 projects including a West Broad Street (U.S. 40) Urban Paving project, East Broad Urban Paving project and a Polaris Parkway Urban Paving Project; to amend the 2009 C.I.B; to authorize the transfer of cash and appropriation within the Gov'l Build America Bonds Fund; to authorize the expenditure of $966,107.00 within the Gov'l Build America Bonds Fund for the Division of Design and Construction; and to declare an emergency. ($966,107.00)
Date Ver.Action ByActionResultAction DetailsMeeting Details
2/10/20101 CITY CLERK Attest  Action details Meeting details
2/9/20101 MAYOR Signed  Action details Meeting details
2/8/20101 Columbus City Council ApprovedPass Action details Meeting details
2/8/20101 COUNCIL PRESIDENT PRO-TEM Signed  Action details Meeting details
1/28/20101 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
1/28/20101 Service Drafter Sent to Clerk's Office for Council  Action details Meeting details
1/27/20101 Service Drafter Sent for Approval  Action details Meeting details
1/27/20101 SERVICE DIRECTOR Reviewed and Approved  Action details Meeting details
1/27/20101 Service Drafter Sent for Approval  Action details Meeting details
1/27/20101 Finance Reviewer Reviewed and Approved  Action details Meeting details
1/27/20101 Finance Reviewer Reviewed and Approved  Action details Meeting details
1/27/20101 FINANCE DIRECTOR Reviewed and Disapproved  Action details Meeting details
1/27/20101 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
1/27/20101 Service Drafter Sent for Approval  Action details Meeting details
1/27/20101 CITY AUDITOR Reviewed and Approved  Action details Meeting details
1/27/20101 CITY AUDITOR Reviewed and Approved  Action details Meeting details
1/27/20101 Service Drafter Sent for Approval  Action details Meeting details
1/26/20101 Service Drafter Sent for Approval  Action details Meeting details
1/26/20101 Service Reviewer Reviewed and Approved  Action details Meeting details
Explanation
1. BACKGROUND
This ordinance authorizes The Director of Public Service to enter into agreements with the Ohio Department of Transportation (ODOT) for 3 roadway improvement projects. They are as follows:

The first project will perform partial depth repairs, plane and resurface pavement with asphalt concrete, and replace pavement marking and loop detectors. Overall Project Limits extend on US 40 (Broad Street) from the US 42 interchange in Madison County to east of Galloway Road in Franklin County (approximately 12 miles). The portion of the project which is located in Columbus is from west of Doherty Road to east of Galloway Road (approximately 0.4 miles). (MAD/FRA-40-7.84/0.00 PID 76356)

This is an Ohio Department of Transportation resurfacing project and there is no new curb ramps, sidewalks or bike paths associated with the City of Columbus portion of this project to be constructed. All existing bus stops will be preserved and/or maintained and maintenance of traffic plans take into account active bus stops for the project throughout construction.

The second project will perform partial depth rehabilitation, plane and resurface pavement with asphalt concrete, and replace pavement marking and loop detectors. Project Limits extend on East Broad Street (SR-16) from the West Columbus Corporation Line at Gould Road to the East Columbus Corporation Line east of Napolean Avenue. Project length is 1.03 miles. (FRA-16-4.32 PID 79360)

98 ADA curb ramps will be added or reconstructed in these project limits as part of this project.
This is an Ohio Department of Transportation resurfacing project and there are no new sidewalks or bike paths associated with the City of Columbus portion of this project to be constructed. All existing bus stops will be preserved and/or maintained and maintenance of traffic plans take into account active bus stops for the project throughout construction.

The third project proposes to resurface DEL-750 (Pola...

Click here for full text