Explanation
BACKGROUND: The original contract provided for engineering design and Modification No. 1 provided for construction administration services for a separate chlorine storage feed system. Upon further consideration regarding safety concerns following the events of September 11, 2001, the Department of Public Utilities decided to redesign this system to utilize a different disinfection chemical in lieu of gaseous chlorine. In addition to the disinfection facility redesign services; this contract includes design services for a chlorine scrubber installation which is a temporary measure as the Dublin Road Water Plant is being redesigned to utilize a different disinfection chemical in lieu of gaseous chlorine. Improvements to incorporate a chlorine gas scrubber system at the Dublin Road Water Plant will provide compliance with all applicable codes, as well as increase safety. The first project modification was anticipated and identified in the original authorizing legislation. This contract modification was not previously anticipated and was a result of unexpected events, changing the direction of the design. This modification provides for additional engineering design for a new disinfection chemical to be utilized at the Dublin Road Water Plant.
CC 329.16 CONTRACT MODIFICATIONS:
1. Amount of additional funds to be expended under this modification: $1,107,000.00.
2. The extent of additional services provided are needed due to the expansion of the original scope of services to provide redesign of the disinfection facility to utilize a different disinfection chemical in lieu of gaseous chlorine. Design of a temporary chlorine scrubber installation and to provide for miscellaneous design changes for the Dublin Road Water Plant to be performed in conjunction with this project.
3. The work under this contract modification is a continuation of work previously performed by the Consultant; therefore, no other processes were used for procureme...
Click here for full text