header-left
File #: 1013-2005    Version: 1
Type: Ordinance Status: Passed
File created: 5/25/2005 In control: Utilities Committee
On agenda: 7/18/2005 Final action: 7/20/2005
Title: To authorize the Director of Public Utilities to modify the contract with Malcolm Pirnie, Inc., for Professional Engineering Services for the Dublin Road Water Plant Chlorine Storage Improvements, for the Division of Water, and to authorize the expenditure of $1,107,000.00 from Waterworks Enlargement Voted 1991 Bonds Fund. ($1,107,000.00)
Attachments: 1. DRWP_VicMap.pdf, 2. MP Mod#1.pdf, 3. MP ModSched.pdf, 4. MP-Chlorine.pdf, 5. CL2EVAL.pdf, 6. Information to be included in Contracting Legislation 05-039.pdf
Date Ver.Action ByActionResultAction DetailsMeeting Details
7/20/20051 MAYOR Signed  Action details Meeting details
7/20/20051 ACTING CITY CLERK Attest  Action details Meeting details
7/18/20051 Columbus City Council Taken from the TablePass Action details Meeting details
7/18/20051 Columbus City Council ApprovedPass Action details Meeting details
7/18/20051 COUNCIL PRESIDENT Signed  Action details Meeting details
7/11/20051 Columbus City Council Tabled to Certain DatePass Action details Meeting details
6/27/20051 Columbus City Council Read for the First Time  Action details Meeting details
6/16/20051 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
6/16/20051 Utilities Drafter Sent to Clerk's Office for Council  Action details Meeting details
6/15/20051 CITY AUDITOR Reviewed and Approved  Action details Meeting details
6/15/20051 Utilities Drafter Sent for Approval  Action details Meeting details
6/14/20051 Auditor Reviewer Reviewed and Approved  Action details Meeting details
6/13/20051 Finance Reviewer Reviewed and Approved  Action details Meeting details
6/13/20051 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
6/13/20051 Utilities Drafter Sent for Approval  Action details Meeting details
6/10/20051 Utilities Drafter Sent for Approval  Action details Meeting details
6/8/20051 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
6/2/20051 EBOCO Reviewer Reviewed and Approved  Action details Meeting details
6/1/20051 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
6/1/20051 Utilities Drafter Sent for Approval  Action details Meeting details
5/31/20051 Utilities Drafter Sent for Approval  Action details Meeting details
5/31/20051 Utilities Reviewer Sent for Approval  Action details Meeting details
5/27/20051 Utilities Reviewer Reviewed and Approved  Action details Meeting details
5/26/20051 Utilities Drafter Sent for Approval  Action details Meeting details
5/25/20051 Utilities Drafter Sent for Approval  Action details Meeting details
Explanation

BACKGROUND: The original contract provided for engineering design and Modification No. 1 provided for construction administration services for a separate chlorine storage feed system. Upon further consideration regarding safety concerns following the events of September 11, 2001, the Department of Public Utilities decided to redesign this system to utilize a different disinfection chemical in lieu of gaseous chlorine. In addition to the disinfection facility redesign services; this contract includes design services for a chlorine scrubber installation which is a temporary measure as the Dublin Road Water Plant is being redesigned to utilize a different disinfection chemical in lieu of gaseous chlorine. Improvements to incorporate a chlorine gas scrubber system at the Dublin Road Water Plant will provide compliance with all applicable codes, as well as increase safety. The first project modification was anticipated and identified in the original authorizing legislation. This contract modification was not previously anticipated and was a result of unexpected events, changing the direction of the design. This modification provides for additional engineering design for a new disinfection chemical to be utilized at the Dublin Road Water Plant.

CC 329.16 CONTRACT MODIFICATIONS:
1. Amount of additional funds to be expended under this modification: $1,107,000.00.
2. The extent of additional services provided are needed due to the expansion of the original scope of services to provide redesign of the disinfection facility to utilize a different disinfection chemical in lieu of gaseous chlorine. Design of a temporary chlorine scrubber installation and to provide for miscellaneous design changes for the Dublin Road Water Plant to be performed in conjunction with this project.
3. The work under this contract modification is a continuation of work previously performed by the Consultant; therefore, no other processes were used for procureme...

Click here for full text