File #: 0302-2005    Version: 1
Type: Ordinance Status: Passed
File created: 2/8/2005 In control: Utilities Committee
On agenda: 3/7/2005 Final action: 3/9/2005
Title: To authorize the Director of Public Utilities to modify an existing contract for the Division of Electricity with ABB, Inc. for the Italian Village Substation; to authorize the expenditure of $82,663.00 from the Voted 1995 and 1999 Street Lighting and Electricity Distribution Improvements Fund; and to declare an emergency. ($82,663.00)
Date Ver.Action ByActionResultAction DetailsMeeting Details
3/9/20051 CITY CLERK Attest  Action details Meeting details
3/8/20051 MAYOR Signed  Action details Meeting details
3/7/20051 Columbus City Council ApprovedPass Action details Meeting details
3/7/20051 COUNCIL PRESIDENT Signed  Action details Meeting details
2/23/20051 Utilities Drafter Sent to Clerk's Office for Council  Action details Meeting details
2/22/20051 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
2/17/20051 Utilities Drafter Sent for Approval  Action details Meeting details
2/17/20051 Auditor Reviewer Reviewed and Approved  Action details Meeting details
2/17/20051 CITY AUDITOR Reviewed and Approved  Action details Meeting details
2/17/20051 Utilities Drafter Sent for Approval  Action details Meeting details
2/16/20051 Finance Reviewer Reviewed and Approved  Action details Meeting details
2/16/20051 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
2/15/20051 Utilities Drafter Sent for Approval  Action details Meeting details
2/14/20051 EBOCO Reviewer Reviewed and Approved  Action details Meeting details
2/14/20051 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
2/9/20051 Utilities Reviewer Reviewed and Approved  Action details Meeting details
2/9/20051 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
2/9/20051 Utilities Drafter Sent for Approval  Action details Meeting details
2/8/20051 Utilities Drafter Sent for Approval  Action details Meeting details
2/8/20051 Utilities Reviewer Reviewed and Approved  Action details Meeting details
2/8/20051 Utilities Drafter Sent for Approval  Action details Meeting details
2/8/20051 Utilities Reviewer Reviewed and Approved  Action details Meeting details
2/8/20051 Utilities Drafter Sent for Approval  Action details Meeting details
Explanation

BACKGROUND: This ordinance authorizes the Public Utilities Director to modify an existing contract with ABB, Inc. for the Division of Electricity for the Italian Village Substation.

Amount of additional funds to be expended: $82,663.00
Current Contract Amount: $6,906,910

Reasons additional goods/services could not be foreseen:
The Columbus Department of Development Building Services Division's review of the permit drawings determined that there is a 6" water line through the site that was not previously identified. This water line necessitates that the Gas Insulated Switchgear (GIS) building be located with the setback required by a City Street Easement. Therefore, the building must be moved 15' north from the location specified in the original bid proposal, thus requiring additional bus/trench at a cost of $69,876.

Another change in the scope of work requires the installation of a 5-ton air conditioning unit, at a cost of $8,937, to provide a conditioned environment not to exceed 85 degrees for the proper operation of equipment to be housed in the GIS building. This service was not included in the original specifications.

It is also requested that the contract be modified to add one additional city employee to attend witness testing of 138KV GIS Switchgear and transformer testing at a cost of $3,850.00.

Reason other procurement processes are not used: ABB, Inc. was awarded the original contract for the Italian Village Substation project based upon the lowest bid received March 3, 2004. It would not be feasible to bid this work separately and would cause a delay in the project.

How cost of modification was determined: The cost of the design changes were determined through negotiations with the contractor and the cost of the witness testing is at the cost established in the existing contract.

Contract Compliance Number: 363100018

Emergency action is requested in order to avoid delays in the constr...

Click here for full text