File #: 0759-2019    Version: 1
Type: Ordinance Status: Passed
File created: 3/6/2019 In control: Recreation & Parks Committee
On agenda: 4/1/2019 Final action: 4/3/2019
Title: To authorize the Director of Recreation and Parks to enter into contract with Korda Nemeth Engineering for professional services for design and engineering for a cable barrier at the Greenlawn Dam; to authorize the transfer of $46,840.00 within the Recreation and Parks Voted Bond Fund; to amend the 2018 Capital Improvements Budget Ordinance 1010-2018; to authorize the expenditure of $46,840.00 from the Recreation and Parks Bond Fund; and to declare an emergency. ($46,840.00)
Attachments: 1. Greenlawn Cable Barrier
Explanation

Background: This ordinance authorizes the Director of the Recreation and Parks Department to enter into contract with Korda Nemeth Engineering for professional services for design and engineering for a cable barrier at the Greenlawn Dam.

This project will provide for the design of a river wide safety cable with highly visible floating buoys and anchorages for the safety of the public and improved maintenance capabilities. The barrier line and anchorages will allow for CRPD maintenance staff to easily and safely maintain the cable barrier with improved anchorages, robust cables, and high floating buoys. The cable barrier will be designed with improved and high visibility buoys providing advanced warning to Scioto River kayakers and canoeists of the downstream danger of the Greenlawn Dam.

The costs for this service contract will be $46,840.00.

Vendors were Prequalified in accordance with City Code Section 329.26(b). Four of the Prequalified Vendors were selected to submit technical proposals, in accordance with City Code Section 329.28 on 12/12/2018 and were received by the Recreation and Parks Department on 1/10/2019. Request for proposals were sent to the following companies:

Company Status
Korda Nemeth Engineering MAJ
OHM Advisors MAJ
Environmental Design Group MAJ
Arcadis MAJ

After reviewing the proposals that were submitted, it was recommended that Korda Nemeth Engineering be selected to do the work. The firm was chosen based on their qualifications, experience with structures, assembled team, and project approach.

Principal Parties:
Korda Nemeth Engineering ...