File #: 0238-2026    Version: 1
Type: Ordinance Status: Consent
File created: 1/20/2026 In control: Public Utilities & Sustainability Committee
On agenda: 2/23/2026 Final action:
Title: To authorize the Director of the Department of Public Utilities to enter into a contract with Northeast-Western Energy Systems USA LLC for a service, maintenance and support contract for the Division of Sewerage and Drainage under the City’s sole source procurement provision; and to authorize the expenditure of up to $522,400.00 from the Sewerage and Drainage Operating Fund. ($522,400.00)
Attachments: 1. ORD 0238-2026 Sole Source Form, 2. ORD 0238-2026 Proposal, 3. ORD 0238-2026 Sole Source Letter, 4. ORD 0238-2026 Financial Coding, 5. ORD 0238-2026 Norteast-Western Energy Systems Ohio SOS
Explanation

BACKGROUND: This legislation authorizes the Director of the Department of Public Utilities to enter into a service contract with Northeast-Western Energy Systems USA LLC for the two large biogas cogeneration engines at the Jackson Pike Water Reclamation Plant in an amount of up to $522,400.00. The engines are being installed as part of a CIP project and will need on-going support, maintenance and repair to maintain peak performance. This long term service contract supports the equipment during the payback period.
This contract will provide for a ten year service contract with Northeast-Western Energy Systems USA LLC (NES) to perform routine maintenance and repair for Jenbacher engines, including but not limited to oil and coolant changes, vibration analysis, emissions testing, minor overhauls, major overhauls and purchasing of additional mechanical components. The contract will also include field services, remote engineering support and remote monitoring services by the vendor, including life cycle historical data, live access to current alarms, operation conditions and remote start and stop capabilities. Additionally, Northeast-Western Energy Systems USA LLC is the sole source provider in the northeastern United States for Jenbacher parts, warranty, factory authorized maintenance and repair as provided under this contract.
If unforeseen issues or difficulties are encountered that would require additional funding, a modification would be required.

SOLE SOURCE PROCUREMENT: Northeast-Western Energy Systems USA LLC is the only factory authorized provider in the northeastern United States for Jenbacher parts, warranty and factory authorized maintenance. A proposal was received for the services that will be provided.
CONTRACT AMOUNTS/TIMELINE
This Contract will remain in force for one (1) year from the construction completion date (estimated to be March 2026) by the City of Columbus with the option to renew annually for nine (9) additional one (1) yea...