Explanation
BACKGROUND: Ordinance 0591-2004 passed 5/17/04 for the Division of Water to enter into a contract with Blue Heron Consulting for management analysis of our Water and Sewer Information Management System (WASIMS). This contract is currently in process. A stipulation of the contract was that we pay for travel costs for the company to come to our site. The vendor estimated $7,000.00 for two weeks of work, however, we would like to set up additional funds since it may take the company longer to perform the required duties. The Contract Compliance Number for Blue Heron Consulting is 16-1573553. They do not have certified MBE/FBE status.
1. The Division needs an additional $8,000.00. The original contract was established for $75,000.00. The total amount of the original contract and the modification is $83,000.00.
2. The need for additional funds was foreseen at the time of the initial contract, but we were unsure as to how much longer the company might need. The company may only need an additional week, but we are establishing additional funds in case any unanticipated instances arise.
3. It is in the City's best interest to not formally bid this service as we have already contracted with the vendor to provide the services needed and bringing in a new vendor would not be feasible.
4. The cost of this service is based on the time needed to actually finish the required duties of the original contract.
It is requested that this Ordinance be handled in an emergency manner, as the company will be performing the duties from the original contract once it has been certified by the Auditor's Office. Emergency legislation will allow us to pay the vendor on time for the additional travel costs needed.
FISCAL IMPACT: The Division of Water has allocated $100,000.00 for these services in the 2004 Budget. Seventy-five thousand has already been encumbered under the original contract, so we have adequate funds to cover this modification.
$50,000.00...