File #: 1322-2008    Version: 1
Type: Ordinance Status: Passed
File created: 8/7/2008 In control: Utilities Committee
On agenda: 9/22/2008 Final action: 9/25/2008
Title: To authorize the Director of Public Utilities to modify and increase the professional engineering services contract with Stantec Consulting Services, Inc. (fka R.Z. Zande & Associates, Inc.), to provide for redesign of the Griggs Booster Station Project; for the Division of Power and Water; to amend the 2008 Capital Improvements Budget; and to authorize a transfer and expenditure of $110,000.00 within the Water Works Enlargement Voted Bonds Fund. ($110,000.00)
Attachments: 1. ORD1322-2008 Legis. Info. Form.pdf, 2. ORD1322-2008 map.pdf
Date Ver.Action ByActionResultAction DetailsMeeting Details
9/25/20081 CITY CLERK Attest  Action details Meeting details
9/23/20081 MAYOR Signed  Action details Meeting details
9/22/20081 Columbus City Council ApprovedPass Action details Meeting details
9/22/20081 COUNCIL PRESIDENT Signed  Action details Meeting details
9/15/20081 Columbus City Council Read for the First Time  Action details Meeting details
9/4/20081 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
9/4/20081 EBOCO Reviewer Sent for Approval  Action details Meeting details
9/4/20081 Utilities Drafter Sent to Clerk's Office for Council  Action details Meeting details
9/3/20081 Auditor Reviewer Reviewed and Approved  Action details Meeting details
9/3/20081 CITY AUDITOR Reviewed and Approved  Action details Meeting details
9/3/20081 Utilities Drafter Sent for Approval  Action details Meeting details
9/2/20081 Finance Reviewer Reviewed and Approved  Action details Meeting details
9/2/20081 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
9/2/20081 Utilities Drafter Sent for Approval  Action details Meeting details
8/29/20081 Finance Reviewer Reviewed and Approved  Action details Meeting details
8/28/20081 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
8/28/20081 Utilities Drafter Sent for Approval  Action details Meeting details
8/25/20081 EBOCO Reviewer Sent for Approval  Action details Meeting details
8/22/20081 Utilities Drafter Sent for Approval  Action details Meeting details
8/20/20081 Utilities Drafter Sent for Approval  Action details Meeting details
8/20/20081 Utilities Reviewer Reviewed and Approved  Action details Meeting details
8/20/20081 Utilities Drafter Sent for Approval  Action details Meeting details
8/20/20081 Utilities Reviewer Sent for Approval  Action details Meeting details
8/20/20081 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
8/18/20081 Utilities Reviewer Reviewed and Approved  Action details Meeting details
8/13/20081 Utilities Drafter Sent for Approval  Action details Meeting details
8/12/20081 Utilities Reviewer Reviewed and Approved  Action details Meeting details
8/7/20081 Utilities Drafter Sent for Approval  Action details Meeting details
Explanation

BACKGROUND: This Ordinance authorizes the Director of Public Utilities to modify and increase the professional engineering services contract with Stantec Consulting Services, Inc. (fka R.Z. Zande & Associates, Inc.) for a redesign of the Griggs Booster Station Project, Division of Power and Water Contract No. 1012.

1. Amount of additional funds to be expended: $110,000.00
Original Contract Amount: $ 118,000.00
Modification 1 (current) $ 110,000.00
Amount of original contract and 1 modification: $ 228,000.00

2. Reasons additional goods/services could not be foreseen:
The Division of Power and Water (DOPW) purchased land in 2003 to facilitate the construction of a new booster station. This land was immediately adjacent to an existing biofilter positioned on the Upper Scioto West sewer tunnel. This biofilter is situated in an easement obtained by the Division of Sewerage and Drainage (DOSD). After the biofilter facility was built, DOSD discovered that for ease of maintenance, 360-degree access to the filter was needed and the current easement did not provide that. Thus, the Sewer Maintenance Operations Center (SMOC) began using and continues to have a need for the property purchased by DOPW to maintain the biofilter.

During the final design of the booster station DOSD-SMOC personnel expressed concern about the location of the proposed booster station with regards to maintenance of the existing biofilter. In addition, the booster station site did not permit proper handling of the stormwater runoff from the booster station based upon newly adopted stormwater regulations.

Through numerous discussions between DOPW and DOSD it was determined it would be in the best interest of both Divisions to relocate the booster station away from the biofilter. This would allow DOSD to have 360-degree access for ease of maintenance and allow DOPW adequate room to address storm drainage and future maintenance.

This relocation also ...