File #: 0963-2019    Version: 1
Type: Ordinance Status: Passed
File created: 3/28/2019 In control: Public Utilities Committee
On agenda: 5/6/2019 Final action: 5/9/2019
Title: To authorize the Director of Public Utilities to enter into a construction contract with The Righter Company, Inc. for the Southerly Wastewater Treatment Plant (SWWTP) Water Meter Vault Improvements Project for the Division of Sewerage and Drainage; to authorize the transfer $319,976.00 and an expenditure of up to $579,480.00 from the Sanitary Sewer General Obligation (G.O.) Bond Fund 6109; and to amend the 2018 Capital Improvement Budget. ($579,480.00)
Attachments: 1. Ord 0963-2019 Subcontractor Utilization Form Water Vault, 2. Ord 0963-2019 DAX Financial Form Water Meter Vault
Explanation

1. BACKGROUND: This legislation authorizes the Director of Public Utilities to enter into a construction contract with The Righter Company, Inc. for the Southerly Wastewater Treatment Plant (SWWTP) Water Meter Vault Improvements Project, Contract SCP 09SO, CIP 650260-103008. The work for this project consists of replacement of the water meter and water meter vault at the north plant entrance, new backflow preventer at the north plant entrance, removal of backflow preventer at Tunnel W and West Pre-aeration Control Building, miscellaneous site work, associated electrical work, and other such work as may be necessary to complete the contract, in accordance with the drawings, technical specifications, and City of Columbus Construction and Material Specifications as set forth in this Invitation For Bid (IFB).

2. PROJECT TIMELINE: All work shall be substantially complete within 150 calendar days of the Notice to Proceed (NTP), with final completion to occur within 180 calendar days. The City anticipates issuing an NTP on or about July 1, 2019.

3. PROCUREMENT INFORMATION: In accordance with the procedures set forth in the overall provisions of Section 329 Columbus City Code one bid was received and opened on March 14, 2019 at the Department of Public Utilities, 910 Dublin Road facility. The bidder information is listed below:

Name C.C. No Expires Vendor # City/State Status
The Righter Company 31-0889208 01/19/20 004433 Columbus, OH MAJ

The Engineer's construction cost estimate was $419,066.00

The Righter Company, Inc. was selected based on the Bid Tabulation and Quality Factor Form review.

4. CONTRACT COMPLIANCE NO.: 31-0889208 | Exp. 01/19/2020 | MAJ | Vendor#: 004433

5. EMERGENCY DESIGNATION: An emergency designation is not requested for this legislation.

6. ECONOMIC...