Title: To authorize the Director of Public Utilities to modify the contract with Hoffman Engineering Company, for Dublin Road Water Plant Miscellaneous Improvements, Auxiliary High Service Pump Station Electrical Renovation, for the Division of Water, and to authorize the expenditure of $7,820.00 from Waterworks Enlargement Voted 1991 Bonds Fund. ($7,820.00)
Attachments: 1. DRWP_VicMap.pdf, 2. HVAC Explanation.pdf
Date Ver.Action ByActionResultAction DetailsMeeting Details
2/16/20051 CITY CLERK Attest  Action details Meeting details
2/15/20051 MAYOR Signed  Action details Meeting details
2/14/20051 Columbus City Council ApprovedPass Action details Meeting details
2/14/20051 COUNCIL PRESIDENT Signed  Action details Meeting details
2/7/20051 Columbus City Council Read for the First Time  Action details Meeting details
1/25/20051 Utilities Drafter Sent to Clerk's Office for Council  Action details Meeting details
1/24/20051 Utilities Drafter Sent for Approval  Action details Meeting details
1/24/20051 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
1/21/20051 Auditor Reviewer Reviewed and Approved  Action details Meeting details
1/21/20051 CITY AUDITOR Reviewed and Approved  Action details Meeting details
1/20/20051 Utilities Drafter Sent for Approval  Action details Meeting details
1/19/20051 Finance Reviewer Reviewed and Approved  Action details Meeting details
1/19/20051 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
1/18/20051 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
1/18/20051 Utilities Drafter Sent for Approval  Action details Meeting details
1/3/20051 EBOCO Reviewer Reviewed and Approved  Action details Meeting details
12/27/20041 Utilities Drafter Sent for Approval  Action details Meeting details
12/21/20041 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
12/20/20041 Utilities Drafter Sent for Approval  Action details Meeting details
12/15/20041 UTILITIES DIRECTOR Reviewed and Disapproved  Action details Meeting details
12/14/20041 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
12/13/20041 Utilities Drafter Sent for Approval  Action details Meeting details
12/13/20041 Utilities Drafter Sent for Approval  Action details Meeting details
12/10/20041 Utilities Drafter Sent for Approval  Action details Meeting details
12/9/20041 Utilities Reviewer Reviewed and Approved  Action details Meeting details
12/1/20041 Utilities Drafter Sent for Approval  Action details Meeting details
Explanation
BACKGROUND: The original contract provided for the design and preparation of contract documents for electrical renovation of the Dublin Road Water Plant Auxiliary High Service Pump Station. This modification provides for additions and changes to the scope of work due to field conditions encountered during construction. These include a cone valve control circuit renewal, pump motor leads, dresser couplings, ventilation system rehabilitation, heating system rehabilitation, heating system circulation fan, and SCADA and pump control logic modifications.
In bringing the building systems back online with the new electrical system, it was discovered that the existing ventilation system on the roof was inoperative and not in accordance with current code. The lower level louvers were without automatic operators so that the roof mounted exhaust fans would draw against a closed room unless the lower louvers were left open all the time. A new design and change order was prepared by the consultant, along with inspection, documentation, testing, and training.
While performing high elevation work during the winter, the contractor observed that the furnace heated air was stagnating at ceiling level. The conduits at upper heights were running hot, while the equipment at floor level was quite cold. An air circulating fan, appropriate to bring the hot air pooling at the ceiling down to floor level, and compatible with maintaining freedom of overhead crane movement, was designed and a change order prepared by the consultant, along with inspection, documentation, testing, and training.


CC 329.13 CONTRACT MODIFICATIONS:
1. Amount of additional funds to be expended under this modification: $7,820.00.
2. The extent of additional services could not be initially foreseen due to field conditions discovered during construction.
3. The work under this contract modification is a continuation of work previously performed by the Consultant, therefore, no other processe...