File #: 1675-2018    Version: 1
Type: Ordinance Status: Passed
File created: 6/7/2018 In control: Public Service & Transportation Committee
On agenda: 7/9/2018 Final action: 7/12/2018
Title: To amend the 2018 Capital Improvements Budget; to authorize the transfer of funds between projects within the Build America Bonds Fund and projects within the Streets and Highways Bond Fund; to authorize the Director of Public Service to enter into a contract modification with Evans, Mechwart, Hambleton & Tilton in connection with the Roadway Improvements - Design Manual project; to authorize the expenditure of up to $75,000.00 from the Streets and Highways Bond Fund and the Build America Bonds Fund for this project; and to declare an emergency. ($75,000.00)
Attachments: 1. ORD 1675-2018 Design Manual mod 1
Explanation
1. BACKGROUND
This legislation authorizes the Director of Public Service to modify a professional services contract with EMH&T (Evans, Mechwart, Hambleton & Tilton) to add funds for the Roadway Improvements - Design Manual project.
Ordinance 2906-2016 authorized the Director of Public Service to enter into a professional services contract with EMH&T (Evans, Mechwart, Hambleton & Tilton) for the Roadway Improvements - Design Manual project. This manual will organize existing City of Columbus Department of Public Service design standards, policies, recommended practices and standard drawings into one comprehensive formal document. The manual will give the Department of Public Service design and review personnel a reference document to ensure that a clear, complete, and concise study or set of plans are developed. The manual will provide a centralized source for consultants to utilize for plan and study preparation and development. In addition, the document will provide the Department of Public Service personnel a reference document which will assure design consistency with consultant designs. The end result of this project will be a logically sound, clear, and organized design manual in electronic format.

Ordinance 2906-2016 encumbered $250,000 for the project. During negotiations with the consultant it was decided the project should be completed in two phases, so the contract was implemented for $149,687.47 to do phase 1. This ordinance is for a planned contract modification to authorize the Director of Public Service to increase the contract in the amount of up to $175,312.53 to implement phase 2 and complete the project.

The original contract amount: $149,687.47 (PO041131, Ord. 2906-2016)
The total of Modification No. 1: $175,312.53 (This Ordinance)

The contract amount including all modifications: $325,000.00

Searches in the System for Award Management (Federal) and the Findings for Recovery list (State) prod...