File #: 1987-2023    Version: 1
Type: Ordinance Status: Passed
File created: 6/26/2023 In control: Public Service & Transportation Committee
On agenda: 7/24/2023 Final action: 7/26/2023
Title: To authorize the Director of Public Service to enter into a contract modification with Decker Construction Company for the Roadway - Utility Cut and Repair 2022 project; to authorize the expenditure of up to $325,000.00 for the contract from the Street Construction Maintenance and Repair Fund. ($325,000.00)
Attachments: 1. ORD 1987-2023
Explanation
1. BACKGROUND
This legislation authorizes the Director of Public Service to renew and modify an existing contract with Decker Construction Company for the Roadway - Utility Cut and Repair 2022 project in an amount up to $325,000.00.
The Department of Public Service is responsible for maintaining the City's roadway system in a safe manner. The contract work includes performing various backfill and pavement restorations for excavations from deposited permits at various locations around the City of Columbus on an on-call basis.

Ordinance 2948-2022 authorized the Director of Public Service to enter into a contract with Decker Construction Company for the Roadway - Utility Cut and Repair 2022 project and to provide for construction administration and inspection services. Language included in the contract reserved the right to extend the contract and funding with the concurrence of the contractor. This is the first contract modification of two. The work performed to date for this project consists of various backfill, pavement restoration for excavation from deposited permits throughout the city on an on-call basis.

The original contract, which expires October 31, 2023, and subsequent modifications reserved the right to extend the contract and funding on a year-to-year bases until October 31, 2025, as stated in the bid documents. With this ordinance, the City is reserving the right to modify the original contract term and future modifications to extend the contract to expire October 31, 2027.

The original contract amount, no inspection: $325,000.00 (PO357970, Ord. 2948-2022)
The total of Modification No. 1, no inspection: $325,000.00 (This Ordinance)
The contract amount including all modifications: $650,000.00