header-left
File #: 0119-2009    Version: 1
Type: Ordinance Status: Passed
File created: 1/20/2009 In control: Safety Committee
On agenda: 2/9/2009 Final action: 2/10/2009
Title: To authorize the Finance and Management Director to enter into a contract on behalf of the Office of Construction Management with Advanced Engineering Consultants, Ltd. for professional architectural/engineering services for a new generator for Fire Station No. 24, to authorize the expenditure of $9,750.00 from the Safety Voted Bond Fund, and to declare an emergency. ($9,750.00)
Date Ver.Action ByActionResultAction DetailsMeeting Details
2/10/20091 MAYOR Signed  Action details Meeting details
2/10/20091 CITY CLERK Attest  Action details Meeting details
2/9/20091 Columbus City Council ApprovedPass Action details Meeting details
2/9/20091 COUNCIL PRESIDENT Signed  Action details Meeting details
1/23/20091 EBOCO Reviewer Sent for Approval  Action details Meeting details
1/23/20091 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
1/23/20091 Finance Drafter Sent for Approval  Action details Meeting details
1/23/20091 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
1/23/20091 Finance Drafter Sent to Clerk's Office for Council  Action details Meeting details
1/22/20091 Finance Drafter Sent for Approval  Action details Meeting details
1/22/20091 Finance Reviewer Reviewed and Approved  Action details Meeting details
1/22/20091 Finance Reviewer Reviewed and Approved  Action details Meeting details
1/22/20091 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
1/22/20091 Finance Drafter Sent for Approval  Action details Meeting details
1/22/20091 Auditor Reviewer Reviewed and Approved  Action details Meeting details
1/22/20091 CITY AUDITOR Reviewed and Approved  Action details Meeting details
1/22/20091 Finance Drafter Sent for Approval  Action details Meeting details
1/21/20091 Finance Drafter Sent for Approval  Action details Meeting details
1/21/20091 SAFETY DIRECTOR Reviewed and Approved  Action details Meeting details
1/20/20091 Finance Drafter Sent for Approval  Action details Meeting details
Explanation

BACKGROUND: This legislation authorizes the Finance and Management Director to enter into a contract on behalf of the Office of Construction Management with Advanced Engineering Consultants, Ltd. for professional architectural/engineering services for the design of an appropriate generator for Fire Station No. 24, 1585 Morse Road. Fire Station No. 24 currently has a generator. However, the current generator does not supply power to the life safety systems. A new generator will ensure the continued operation of Fire Station No. 24 during power outages. Services are to include a detailed evaluation and assessment of Fire Station No. 24 for stand-by power. Associated services will include construction administration, design plans to establish a pre-determined level of stand-by power, identify access for building systems, required specification for full integration, a cost estimate and generator compatibility.

Requests for Statements of Qualifications were available on October 24, 2008 and responses were to be submitted on or before November 11, 2008. The City received five statements from the following firms:

Advanced Engineering Consultants, Ltd. (FBE), Kramer Engineers, CDP Engineers, Karpinski Engineering, and Star Consultants, Inc. (AS1). Star Consultants, Inc. was disqualified. Star Consultants, Inc. listed projects under past performance, which they did not perform. A five-person committee evaluated the proposals, consisting of one member from the Equal Business Opportunity Commission Office, one member from the Columbus Fire Division, and three members from the Office of Construction Management. The scores were as follows:

Advanced Engineering Consultants, Ltd. (FBE) 630 points
Kramer Engineers 621 points
CDP Engineers 522 points
Karpinski Engineering 454 points
Star Consultants, Inc. (AS1) 0 points

Advanced Engineering Consultants, Ltd. was the highest-ranked firm. They received the...

Click here for full text