Explanation
1. BACKGROUND: This legislation authorizes the Director of Public Utilities to enter into a construction contract with Kalkreuth Roofing and Sheet Metal, Inc., in the amount of $69,632.50, for the Hap Cremean Water Plant (HCWP) Roof Restoration 2011 Project, Division of Power and Water Contract Number 1178.
This project consists of furnishing all materials, equipment, and labor necessary to provide for the removal of the existing ballast and membrane roof and install a high performance roof system on the south laboratory building at the Hap Cremean Water Treatment Plant.
This project is necessary as the roof is leaking into the the laboratory building and if not repaired it may impact the ability of the HCWP staff to complete OEPA mandated testing and monitoring of the water treatment process. The HCWP is an essential and integral component in the Columbus area water supply and treatment infrastructure. Adequate supply of water is essential to economic growth and development.
There were no public meetings held regarding this work. The HCWP is a secure facility and is not a publically accessible building.
The project specifications require that the roofing project utilize a modified bitumen membrane incorporating a combination of 28% post industrial and 11% pre consumer recycled content. The roofing surface is specified to be supplied as a white, elastomeric, urethane coating with an Energy Star approval rating.
2. CONSTRUCTION CONTRACT AWARD: The Director of Public Utilities publicly opened five bids on August 24, 2011. Bids were received from: Kalkreuth Roofing and Sheet Metal, Inc. - $69,632.50; Chemcote Roofing Co. - $86,848.24; General Maintenance & Engineering - $67,611.95 (non-responsive); Smith Roofing/Sheet Metal - $75,468.75 (non-responsive); and Harold J. Becker Co. - $83,806.25 (non-responsive).
Although General Maintenance & Engineering submitted the lowest bid, they did not return the entire bid submittal docume...