Legislation Details

File #: 2662-2026    Version: 1
Type: Ordinance Status: Second Reading
File created: 9/21/2026 In control: Public Utilities & Sustainability Committee
On agenda: 10/19/2026 Final action:
Title: To authorize the Director of Finance and Management, on behalf of the Office of Construction Management, to enter into a design agreement with Abbot Studios, for the Department of Public Service’s Georgesville Refuse Station & SWACO Transfer Station project; to authorize an expenditure up to $2,542,767.69 within the Refuse Collection Voted Capital Fund, the Streets & Highways Voted Capital Fund, and the Streets and Highways Non-Bond Fund; and to declare an emergency. ($2,542,767.69)
Attachments: 1. ORD 2662-2026 Funding, 2. ORD 2662-2026 Abbot's SOS
Date Ver.Action ByActionResultAction DetailsMeeting Details
No records to display.
Explanation

1. BACKGROUND: This Ordinance authorizes the Director of Finance and Management, on behalf of the Office of Construction Management, to enter into a design agreement, with Abbot Studios Architects + Planners + Designers, LLC (hereinafter “Abbot Studios”), for design services for the Georgesville Refuse Station & SWACO Transfer Station project, in the amount of $2,542,767.69.

The project involves design services at the following key facilities located at 1550 Georgesville Rd, Columbus, Ohio 43228:

• Refuse Station: ~ 20,000 S.F., one story, including office spaces, toilets, locker rooms, conference/break room, and vehicle maintenance bay.

• Transfer Station: ~ 15,000 S.F. compactor, one story, including tipping floors, small break room, toilets, and locker rooms for men and women.

The scope includes space planning, design, engineering services, construction administration services, special inspections, and closeout.

This is a joint project with the Solid Waste Authority of Central Ohio (hereinafter “SWACO”). SWACO has contributed $1,255,686.02 for their share and has been deposited into the Streets and Highways Non-Bond Fund - Fund No. 7766.

2. BID INFORMATION: The selection of the firm providing the consulting services has been performed in accordance with the procedures set forth in Columbus City Code, Section 329, "Awarding professional service contracts through requests for proposals (RFP)." The project was let by the Office of Construction Management through Vendor Services and Bonfire. Four hundred seventy-seven (477) vendors were solicited.

Three (3) Requests for Proposals were opened on April 4, 2025:

Vendor: City/State
Abbot Studios Columbus/OH
DLZ Architecture, Inc. Columbus/OH
Star Consultants Columbus/O...

Click here for full text