Explanation
1. BACKGROUND:
A. Need. This legislation authorizes the Director of Public Utilities to enter into a construction contract with Kenmore Construction Co., Inc., for the Southerly Wastewater Treatment Plant Corrosion Prevention and Protective Coating Systems project for the Division of Sewerage and Drainage.
The proposed contract with Kenmore Construction Co., Inc. is for Contract S80, Corrosion Prevention and Protective Coating Systems Phase 1 at the Southerly Wastewater Treatment Plant (SWWTP). This contract Work consists of surface preparation and painting of process piping and equipment, pipe demolition, pipe insulation, repair of concrete expansion joints and cracks, asbestos removal, replacement of corroded telephone and electrical panels and other miscellaneous work for the designated areas of the Southerly Wastewater Treatment Plant. All work shall be performed in accordance with the project provisions, specifications and drawings.
The contract was advertised in the City Bulletin, and bids were received on February 9, 2011, as follows:
1. Kenmore Construction Co., Inc. | MAJ | $2,021602.00
2. The Righter Company, Inc. | MAJ | $2,341,350.00
The Engineer's construction cost estimate was $1,923,424.00.
Award is recommended to the lowest Responsive and Responsible and Best Bidder.
B. Contract Compliance No.: 34-0802152 | MAJ | Expires August 4, 2011
This company is not debarred according to the Federal excluded parties listing or prohibited from being awarded a contract to the Auditor of State unresolved findings for recovery certified search.
C. Emergency Designation: Emergency designation is not requested.
2. FISCAL IMPACT:
This ordinance authorizes the Director of Public Utilities to transfer within and expend $2,021,602.00 in funds from the Sanitary Sewer Super Build America Bond (Super B.A.B.s), Fund 669; and to amend to the 2011 Capital Improvements Budgets to establish sufficient budget authority to co...
Click here for full text