Explanation
1. BACKGROUND
This legislation authorizes the Director of Public Service to modify and increase the professional engineering services contract for the Resurfacing - General Engineering Contracts 2008 #4 with Prime Engineering and Architecture, in the amount of $125,000.00.
This contract has been used for various projects that spent down the total value. Once it was determined to use Prime Engineering for the Roadway Improvements -Riverview Drive from Olentangy River Road -West Terminus project, it was necessary to modify the contract rather than a start a separate procurement effort due to the planned construction funding schedule.
The contract will be needed during the construction of the Roadway Improvements - Riverview Drive from Olentangy River Road -West Terminus project.
The construction plans for the Roadway Improvements -Riverview Drive from Olentangy River Road -West Terminus project were completed in 2004 then placed on the shelf as construction funding was not available. The project has been programmed in the Capital Improvement plan for construction in 2013.
In order to construct this project, the plans must be revised to today's specifications and account for any changes in the field conditions. The original consultant went out of business which requires the City to use a different consultant to perform these updates. Prime Engineering was selected as the City already has a contract with them which will allow the completion of the plan updates to meet the 2013 construction requirement.
The original contract was $250,000 authorized by ordinance 0563-2008(EL008483).
Ordinance 0293-2010 authorized modification #1 to remove the 2 year timeframe for the contract.
Modification #2 in the amount of $50,000.00 authorized by ordinance 0046-2011 for design of curb ramps constructed in association 2011 resurfacing projects.
The Amount of this Modification #3 is $125,000.00.
The total contract amount including this modif...