header-left
File #: 1840-2008    Version: 1
Type: Ordinance Status: Passed
File created: 11/11/2008 In control: Utilities Committee
On agenda: 12/8/2008 Final action: 12/10/2008
Title: To authorize the Director of Public Utilities to enter into an agreement with EMH&T, Inc. for professional engineering services for the Lazelle Road 2 MG Storage Tank Project; to authorize the transfer of $1,278.30 within the Water Works Enlargement Voted Bonds Fund; to authorize the appropriation and transfer of $157,276.70 from the Water System Reserve Fund to the Water Works Enlargement Voted Bonds Fund; and to authorize the expenditure of $158,555.00 from the Water Works Enlargement Voted Bonds Fund; for the Division of Power and Water. ($158,555.00)
Attachments: 1. ORD1840-2008 Legis. Info. Form.pdf, 2. ORD1840-2008 map.pdf
Date Ver.Action ByActionResultAction DetailsMeeting Details
12/10/20081 CITY CLERK Attest  Action details Meeting details
12/9/20081 MAYOR Signed  Action details Meeting details
12/8/20081 Columbus City Council ApprovedPass Action details Meeting details
12/8/20081 COUNCIL PRESIDENT Signed  Action details Meeting details
12/1/20081 Columbus City Council Read for the First Time  Action details Meeting details
11/20/20081 Utilities Drafter Sent to Clerk's Office for Council  Action details Meeting details
11/19/20081 Utilities Drafter Sent for Approval  Action details Meeting details
11/19/20081 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
11/18/20081 Utilities Drafter Sent for Approval  Action details Meeting details
11/18/20081 Utilities Reviewer Sent for Approval  Action details Meeting details
11/18/20081 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
11/18/20081 Utilities Drafter Sent for Approval  Action details Meeting details
11/18/20081 Utilities Drafter Sent for Approval  Action details Meeting details
11/18/20081 Auditor Reviewer Reviewed and Approved  Action details Meeting details
11/18/20081 CITY AUDITOR Reviewed and Approved  Action details Meeting details
11/17/20081 Utilities Drafter Sent for Approval  Action details Meeting details
11/17/20081 Finance Reviewer Reviewed and Approved  Action details Meeting details
11/17/20081 Finance Reviewer Reviewed and Approved  Action details Meeting details
11/17/20081 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
11/14/20081 Utilities Reviewer Reviewed and Approved  Action details Meeting details
11/13/20081 Utilities Drafter Sent for Approval  Action details Meeting details
11/12/20081 Utilities Drafter Sent for Approval  Action details Meeting details
11/12/20081 Utilities Reviewer Reviewed and Approved  Action details Meeting details
11/11/20081 Utilities Drafter Sent for Approval  Action details Meeting details
Explanation

1. BACKGROUND: This legislation authorizes the Director of Public Utilities to enter into an agreement with EMH&T, Inc. in the amount of $158,555.00, for professional engineering services for the Lazelle Road 2 Million Gallon (MG) Storage Tank Project.

This project consists of designing a 2 MG hydropillar water tank including a mixing system. The tank will be located on an existing tank site owned by the City of Columbus. The site design shall meet all City of Columbus stormwater requirements, which will include an approved CC Drawing. The consultant will prepare the design specifications for the project and review all construction submittals.

2. BID INFORMATION: The selection of the firm providing the professional engineering services has been performed in accordance with the procedures set forth in Columbus City Code, Section 329.14, "Awarding professional service contracts through requests for proposals." The evaluation criteria for this contract included: 1. proposal quality, 2. project schedule, 3. environmentally preferable offeror, and 4. local workforce.

Requests for Proposals (RFP's) were received on September 15, 2008 from EMH&T, Inc., Chester Engineers, and Poggemeyer Design Group, Inc.

Upon review of the technical proposals, the bidders were ranked using the criteria mentioned above and EMH&T, Inc. was the firm selected to perform the services for this project. Their Contract Compliance Number is 31-0685594 (expires 11/2/09, Majority). Additional information regarding each bidder, description of work, contract time frame and detailed amounts can be found on the attached Legislation Information Form.

3. FISCAL IMPACT: This legislation includes a transfer of funds within the Water Works Enlargement Voted Bonds Fund and a transfer of funds from the Water System Reserve Fund to the Water Works Enlargement Voted Bonds Fund as a temporary measure until such time as the proceeds from a bond sale can be made available....