Explanation
October 14, 2005 05-073-606
BACKGROUND: This contract provides for Main Line Valve Replacement Part II. The large number of valves broken closed in the older sections of the distribution system has made it impossible to maintain the required levels of disinfection throughout the grid. The work required to replace these broken valves is beyond the capabilities of our current staffing level and contractual services are required. Competitive bids were received and opened for this project at the office of the Director of Public Utilities on September 14, 2005. Two (2) bids were received on this project. The most responsive and responsible bid was submitted by Bale Contracting Inc., 1247 Stimmel Road, Columbus, Ohio, 43223. Contract to be awarded to same.
CONTRACT COMPLIANCE NUMBER: 31-0996994
FISCAL IMPACT: The 2005 C.I.B. is being amended and funds are being transferred to provide the funding for this project.
BIDDERS AMOUNT
Bale Contracting Inc. $2,047,224.30
Columbus Asphalt Paving, Inc. $2,177,615.00
Title
To authorize the Director of Public Utilities to enter into a contract with Bale Contracting Inc. for Main Line Valve Replacement Part II for the Division of Water, to amend the 2005 C.I.B., to authorize the City Auditor to transfer funds within the Waterworks Enlargement Voted 1991 Bonds Fund, and to authorize the expenditure of $2,047,224.30 from the Water Works Enlargement Voted 1991 Bonds Fund, ($2,047,224.30)
Body
WHEREAS, the Director of Public Utilities did receive and open bids on September 14, 2005, for Main Line Valve Replacement Part II, and
WHEREAS, a responsive and responsible bid has been received, and
WHEREAS, it is necessary to authorize the Director of Public Utilities to enter into a contract for Main Line Valve Replacement for the Division of Water for the preservation of public health, peace, property, safety and welfare; Now, Therefore,
BE IT ORDA...