Explanation
1. BACKGROUND:
A. Need: This legislation authorizes the Director of Public Utilities to modify the professional engineering services contract with MS Consultants in connection with the Downtown Small Diameter Rehab. (See Attached Map)
Significant re-engineering was required to provide the services desired for multiple facets of this project:
Noble Street ~ Original new pipe placement replaced by Slip-lining due to unforeseen conflicts with outside utilities.
Pearl Alley ~ Original new pipe placement required realignment due to unforeseen conflicts with outside utilities.
Engler Street ~ Original new pipe placement required realignment due to unforeseen conflicts with outside utilities.
Capital Street ~ Original new pipe placement required realignment due to unforeseen conflicts with outside utilities.
Wall Street ~ Original new pipe placement replaced by Slip-lining due to unforeseen conflicts with outside utilities.
B. Contract Compliance No.: 34-6546916 (001) - Expires 07/29/2008 - MAJORITY
2. FISCAL IMPACT:
This ordinance authorizes the transfer and appropriation of funds from the Sanitary Sewer Reserve Fund for this expenditure. Monies for this modification are provided from a proposed Bond Sale via the transfer detailed in this ordinance.
3. EMERGENCY:
The Division of Sewerage and Drainage hereby requests City Council to concur in the designation of this ordinance as an emergency measure, to assure that work may continue uninterrupted, to avoid delays, and to pay the contractor in a timely manner.
Title
To authorize the Director of Public Utilities to modify the professional engineering services contract with MS Consultants, for the Downtown Small Diameter Rehab; to authorize the transfer and appropriation of $15,708.82 from the Sanitary Sewer Reserve Fund; and to authorize the expenditure of $15,708.82 within the Voted Sanitary Sewer Bond Fund for the Division of Sewerage and Drainage; and to declare and emerg...