header-left
File #: 0212-2006    Version: 1
Type: Ordinance Status: Passed
File created: 1/25/2006 In control: Utilities Committee
On agenda: 4/24/2006 Final action: 4/27/2006
Title: To authorize the Director of Public Utilities to modify an existing contract for the Division of Electricity; with ABB, Inc.; for the Italian Village Substation; and to authorize the expenditure of $135,485.00 from the Voted 1995 and 1999 Street Lighting and Electricity Distribution Improvements Fund. ($135,485.00)
Attachments: 1. ORD0212-2006Legis. Info. Form
Date Ver.Action ByActionResultAction DetailsMeeting Details
4/27/20061 ACTING CITY CLERK Attest  Action details Meeting details
4/26/20061 MAYOR Signed  Action details Meeting details
4/24/20061 Columbus City Council ApprovedPass Action details Meeting details
4/24/20061 COUNCIL PRESIDENT Signed  Action details Meeting details
4/3/20061 Columbus City Council Read for the First Time  Action details Meeting details
3/28/20061 City Clerk's Office Sent back for Clarification/Correction  Action details Meeting details
3/28/20061 Utilities Drafter Sent to Clerk's Office for Council  Action details Meeting details
3/28/20061 Utilities Drafter Sent for Approval  Action details Meeting details
3/28/20061 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
3/21/20061 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
3/21/20061 Utilities Drafter Sent for Approval  Action details Meeting details
3/21/20061 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
3/21/20061 Utilities Drafter Sent to Clerk's Office for Council  Action details Meeting details
3/20/20061 Auditor Reviewer Reviewed and Approved  Action details Meeting details
3/20/20061 CITY AUDITOR Reviewed and Approved  Action details Meeting details
3/20/20061 Utilities Drafter Sent for Approval  Action details Meeting details
3/20/20061 EBOCO Reviewer Reviewed and Approved  Action details Meeting details
3/17/20061 Finance Reviewer Reviewed and Approved  Action details Meeting details
3/17/20061 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
3/17/20061 Utilities Drafter Sent for Approval  Action details Meeting details
3/16/20061 Utilities Reviewer Reviewed and Approved  Action details Meeting details
3/16/20061 Utilities Drafter Sent for Approval  Action details Meeting details
3/15/20061 Utilities Drafter Sent for Approval  Action details Meeting details
3/13/20061 Utilities Reviewer Reviewed and Approved  Action details Meeting details
1/25/20061 Utilities Drafter Sent for Approval  Action details Meeting details
Explanation

BACKGROUND: This ordinance authorizes the Public Utilities Director to modify an existing contract with ABB, Inc. for the Division of Electricity for the Italian Village Substation.

Amount of additional funds to be expended: $135,485
Original contract amount: $6,816,910
Amount of modifications #1 & #2: $171,763
Amount of original contract and modifications #1-#3: $7,124,158

Reasons additional goods/services could not be foreseen:
The turnkey project encountered unforeseen underground site conditions and there were changes to AEP's and the Division's electrical and construction requirements, respectively. These changes were as follows:
· The removal, disposal and replacement of contaminated soil materials.
· AEP panel wiring changes.
· Upgraded fences and gates.
· Miscellaneous upgrades.
· Replacement of an existing concrete approach ramp and adjoining property asphalt parking lot repairs.
· Fiber optic line relocation.
· Installation of SBC phone system to connect the SCADA system.
In addition, there were credits and penalties assessed to the contractor per the
contract.

Reason other procurement processes are not used: ABB, Inc. was awarded the original turnkey contract for the Italian Village Substation project based upon the lowest bid received March 3, 2004. The contract was bid as a design-build contract because of the specialty equipment. The manufacturer/contractor had full control of the design to meet the Division's design criteria. The manufacturer/contractor supplied the original equipment and the structures had to be compatible with this equipment.

How cost of modification was determined: The cost of the design changes was determined through negotiations with the contractor. Please see the attachment for a detailed list of items added and their associated costs, as well as credits for items that were deleted from the existing contract.

Contract Compliance Number: 36-3100018

FISCAL IMPACT: ...

Click here for full text